Pouring Concrete Strip Footer with Accufooting Using T200 Bobcat Conmpact Track Loader Skid Steer

Sdílet
Vložit
  • čas přidán 17. 08. 2022
  • Preparing and pouring the concrete footer for our Nudura ICF house. Started with measuring the forms to get yardage to call ready mix plant. Then placed cross drains using leftover pipe. Then we tied in the bonding leg for the electrical. Followed by placing clean crushed stone under a low spot. Then we prepared the site for work by cleaning up debris and organizing tools. We placed concrete in the low spot first to stiffen up so bulkheads wouldn't pump out the concrete. After pouring the concrete and screeding, we mag floated the top to bring up the cream and fine tune it. We placed plastic over it because the weather was threatening to rain.
    Still learning with the cameras so sorry for the shaky camera. The GoPro Hero 8 definitely stabilizes. That camera was used in the cab of the skid steer, which shakes like a banshee.

Komentáře • 1