9 Service EB Metering Panel Board | GEESYS | Best Electric Meter Panel Board for Apartments | Villas

Sdílet
Vložit
  • čas přidán 11. 09. 2024
  • Installing a 9-service EB (Electricity Board) metering panel board is a complex task that typically requires professional expertise, especially given the potential safety hazards involved with working with electricity. Below is a general guide to the installation process, but please note that it's highly recommended to consult or hire a licensed electrician or electrical engineer to carry out this work.
    Materials and Tools Required:
    9-service EB metering panel board
    Circuit breakers (as per requirement)
    Insulated copper or aluminum wires (as per load requirements)
    Electrical conduit and fittings
    Screws and wall plugs
    Insulation tape
    Multimeter
    Wire cutters, pliers, and screwdrivers
    Earthing material (copper rod, earthing wire)
    geesysindia.co...
    We are ranked as the topmost manufacturer, instrumental in offering a wide array of Metering Panel to our esteemed customers. This product is easy to operate.
    Steps to Install a 9-Service EB Metering Panel Board:
    Preparation and Safety:
    Turn Off Main Power Supply: Ensure that the main power supply is turned off before starting any work.
    Inspect the Location: Choose an appropriate location for installing the panel board. It should be dry, well-ventilated, and easily accessible.
    Wear Safety Gear: Always wear insulated gloves and safety glasses when working with electrical components.
    Mounting the Panel Board:
    Mark and Drill: Mark the locations for the mounting screws on the wall where the panel will be installed. Drill holes and insert wall plugs.
    Mount the Panel: Secure the panel board to the wall using screws. Ensure that it is level and securely fastened.
    Wiring the Panel Board:
    Connect the Incoming Power Supply:
    Connect the incoming phase wire (live wire) from the main supply to the input terminal of the main circuit breaker on the panel board.
    Connect the neutral wire from the main supply to the neutral bar on the panel.
    Connect the earthing wire to the earthing terminal on the panel.
    Install Circuit Breakers:
    Install the individual circuit breakers for each of the 9 services (each service corresponds to a different load or section of the building).
    Connect the outgoing phase wires from each circuit breaker to the respective load circuits.
    Connect the Meters:
    If there are energy meters for each service, connect the output from the circuit breakers to the respective meters, then connect the meters to the load circuits.
    Neutral and Earthing Connections:
    Connect all neutral wires from the load circuits to the neutral bar.
    Connect all earthing wires from the load circuits to the earthing bar.
    Testing the Installation:
    Check All Connections: Ensure that all connections are tight and properly insulated.
    Test for Continuity: Use a multimeter to check for continuity and proper connections.
    Power On: After verifying the installation, turn on the main power supply.
    Check Functionality: Test each circuit to ensure that the circuit breakers and meters are functioning correctly.
    Final Checks:
    Labeling: Label each circuit breaker to identify the corresponding service it controls.
    Secure the Panel Cover: Ensure that the panel board cover is properly secured.
    Earthing Test: Conduct an earthing test to ensure proper earthing resistance.
    Safety Precautions:
    Always ensure that the main power is off during installation.
    Double-check all connections before powering on the system.
    If unsure at any point, consult with a professional electrician.
    GEESYS Brand is known for its Quality Products and Excellent Service on time.
    Discovering ever new heights of excellence has been a passion for GEESYS Technologies.By offering an excellent range of Solar PV Power Products, Power Conditioning products, Power Backup System,Electrical Control Panels,and Security & automation Products, We have become a name synonymous withperfection. Our Credibility as a Manufacturer is cemented as we offer quality that is second to none.We Provide worldclass Electronic Products. The reason for such a systematic growth is our unwavering commitment to adopt leading-edge manufacturing technologies. Founded on September 11, 2011 in Chennai, GEESYS Technologies has left a mark of prominence owing to its hard work. Further, We have designed client-friendly business policies, Which enable us to earn respect of the clients.

Komentáře •