Video není dostupné.
Omlouváme se.

[Montreal metro] Service disruption on the green line - 2023 December 1 🟢

Sdílet
Vložit
  • čas přidán 18. 08. 2024
  • On December 1st, 2023, the green line service has been disrupted between Berri-UQAM and Honoré-Beaugrand from 1 PM due to an emergency medical intervention.
    At around 1:30 PM, I heard this information in the metro and decided to go to Berri-UQAM metro station to film the situation. As I arrived at aroung 1:50 PM, I can see police officers standing on the platforms. The 51st AZUR set was arriving from Angrignon and all passengers onboard had to disembark as Berri-UQAM was the terminal station at that moment. I was planning to ride a train with Berri-UQAM as the terminal station at that moment, but finally, the trains ceased to circulate on the entire line until the service resumption.
    Then, the train stayed for a period of time without moving and the electrical current of the line has been cut. We could even see employees working in the tunnels.
    A few minutes later, the tracks have been repowered and the train found back its electrical current and the service gradually resumed on the entire line.
    Video filmed on December 1st 2023 at 1:52 PM

Komentáře • 22