Video není dostupné.
Omlouváme se.

ផ្លូវខេត្ត ៣១២(~$25Millions) ទៅច្រកព្រំដែនបន្ទាយចក្រី សាងសង់សម្រេចបាន ៦៥% គ្រោងបញ្ចប់នៅដើមឆ្នាំ២០២៥

Sdílet
Vložit
  • čas přidán 8. 07. 2024
  • Welcome to my Channel ! Subscribe for more: bit.ly/3SIobn0
    65% of the progress of the construction of Provincial Road No. 312 to Banteay Chakrei border checkpoint is scheduled to be completed by January 2025.
    Provincial Road No. 312 in Prey Veng Province was opened on June 9, 2023, with a length of 28,372 km, starting from Samrong village, Lvea commune (at the intersection of National Road No. 1, km 77 + 08). 2) Up to Ko village, Banteay Chakrei commune (Cambodia-Vietnam border) of Preah Sdach district, Prey Veng province.
    The construction project will rehabilitate and widen the width of the road from 4 to 5 meters to the width of 12 meters and upgrade the quality from the two-layer paved road (DBST) to the 6-cm AC paved road. And 8 cm and 25 cm thick reinforced concrete pavement with a total width of 11 m and a lane for cars and lanes for bicycles (2 lanes to and fro).
    The project will also include the installation of all types of sewers along the road, as well as the installation of road markings, markers, milestones and safety poles in accordance with road technical standards.
    Former Minister of Public Works and Transport, Sun Chanthol, said at the groundbreaking ceremony that Provincial Road No. 312 was constructed by the ILSUNG-KR JOINT VENTURE, a Korean consortium with a construction period of 18 months and a maintenance period of 60 months. The total amount of concessional loans from the Asian Development Bank is approximately US $ 24.89 million.
    Provincial Road No. 312 is an important strategic route through four communes in Preah Sdach District, Prey Veng Province, including: Lvea Commune, Chey Kampok Commune, Angkor Reach Commune and Banteay Chakrei Commune. This road line is connected to National Road No. 1, Provincial Road No. 312A and the border ring road, which connects the urban area to the border area (Cambodia-Vietnam).
    After the completion of this road, it will facilitate people's travel to hospitals, schools and facilitate the transportation of goods as well as other agricultural products to the local market and the surrounding area, especially expected to participate in the promotion. Trade activities between Cambodia and Vietnam to be even better.
    Regarding the construction of National Road No. 312, a company recently put up billboards and assembled vertical machinery on Provincial Road No. 313, located from the new roundabout in Prey Veng to the turtle market on National Road No. 1, including Claimed to have been contracted to build Provincial Road No. 312 from National Road No. 1 at Samrong Village, Lvea Commune, Preah Sdach District, Prey Veng Province to Banteay Chakrei International Border Crossing on the Cambodian-Vietnamese border.
    The Ministry of Public Works and Transport (MPWT) has issued a statement denying that Provincial Road No. 313 is under the care of the Prey Veng Provincial Department of Public Works and Transport and has no plans to build it with an ADB loan.
    National Road 312, which is being built under a loan from the Asian Development Bank, with the Ministry of Public Works and Transport as the project owner and ILSUNG-KR Joint Venture, is the legal contractor.
    The Ministry of Public Works and Transport (MPWT) has stated that it intends to deceive the public and the people for their own economic benefit, contrary to the facts and laws of the Ministry of Public Works and Transport. Cambodia. In front of the Ministry of Public Works and Transport will take legal action as necessary.
    -គម្រោងសាងសង់ផ្លូវ ស្ពាន កំពង់ផែ ព្រលានយន្តហោះសំខាន់ៗ ក្នុងប្រទេសកម្ពុជា
    Link: shorturl.at/crFRY
    -គម្រោងផ្លូវល្បឿនលឿនភ្នំពេញ-បាវិត Phnom Penh-Bavet Expressay Project
    Link: bit.ly/3JgxGWs
    -ព្រែកជីកហ្វូណនតេជោ FUNAN TECHO CANAL
    Link: bit.ly/449F8uI
    -គម្រោងផ្លូវរថភ្លើងប្រទេសកម្ពុជា Cambodia Railway Project
    Link: bit.ly/3Pii2O9
    -គម្រោងផ្លូវល្បឿនលឿនភ្នំពេញ-សៀមរាប Phnom Penh-Siem Reap Expressway Project
    Link: bit.ly/3qM2g4a
    - បណ្តាញផ្លូវជាតិសំខាន់ៗ របស់កម្ពុជា Cambodia Road
    Link: bit.ly/3Ni4zn5
    -គម្រោងព្រលានយន្តហោះប្រទេសកម្ពុជា Cambodia Airport Project
    Link: bit.ly/43LilFB
    -គម្រោងផ្លូវក្រវ៉ាត់ក្រុងទី ៣ Phnom Penh Ring Road 3rd
    Link: bit.ly/3JiB9UE
    -គម្រោងផ្លូវក្រវ៉ាត់ក្រុងទី ៤ Phnom Penh Ring Road 4th
    Link: bit.ly/3JiB9UE
    -ព័ត៌មានការអភិវឌ្ឍន៍អន្តរជាតិ International Development News
    Link: bit.ly/3qNrRtk
    -គម្រោងកំពង់ផែធំៗ របស់ប្រទេសកម្ពុជា Cambodia Port Project
    Link: bit.ly/4421deH
    -ក្របខណ្ឌ និងការប្រលងក្រសួងសាធារណការ និងដឹកជញ្ជូន Ministry of public works and Transport
    Link: bit.ly/3qPI2Xd
    -ច្បាប់ស្តីពីផ្លូវថ្នល់ Law on Road
    Link: bit.ly/3CvkBVL
    មើលវីដេអូជាច្រើនទៀត bit.ly/3pCk1z3

Komentáře • 1