Video není dostupné.
Omlouváme se.

THORPE PARK Hyperia Construction Update - BRAKE RUN! - 18th November 2023

Sdílet
Vložit
  • čas přidán 18. 11. 2023
  • Exciting update today at thorpe park as we see Hyperia's brake run and catwalk installed over the weekend. we also spotted concreate formed for the switch track and supports leading into the splash down.
    We may only be weeks away now from seeing the lifthill start!
    ▶️ ENJOYING MY CONTENT?
    Subscribe and Turn on notifications so you dont miss a single update!
    Consider Supporting my content by becoming a channel member: / @theknexmaker
    Comunity Discord server, Twitter and Instagram here: linktr.ee/knex...

Komentáře • 11

  • @wildwestadventures2168
    @wildwestadventures2168 Před 9 měsíci +1

    Under the yellow tarpaulin is the ride op controls, an the big gap on the floor is allow for flooding, why they have moved everything off the floor at minimum 2-3 foot,
    Over the next month a lot of the ride hardware is going in,

    • @TheKnexMaker
      @TheKnexMaker  Před 9 měsíci

      yh that makes sence, that area is prone to flooding. I wonder how they deal with that for the base of the lift, with the big lift hill motor

  • @CoasterR3X
    @CoasterR3X Před 9 měsíci +2

    AHHHHH I CANT WAIT!!!!!

  • @LeoDurman11
    @LeoDurman11 Před 9 měsíci +2

    Wow that that looks pretty cool

  • @LeoDurman11
    @LeoDurman11 Před 9 měsíci

    I still wonder how it goes up so fast!

  • @christtototottottott
    @christtototottottott Před 9 měsíci +1

    First