Northwall Road Pump Barrier Operated Level Crossing | Kent | Sunday 11th August 2024

Sdílet
Vložit
  • čas přidán 10. 09. 2024
  • Shoutout to ‪@Brandonwillson3‬ for giving me the tripod used in this video and the previous video.
    Crossing Equipment:
    2 LED Dorman MWLs
    2 Pump Barriers
    1st Train: Class 395 - Ramsgate - London St Pancras
    2nd: Class 395 - London St Pancras - Ramsgate

Komentáře • 2