This video is regarding DBM work in highways, including material, machinery and manpower required. Uses of Tractor compressor, paver, dumper, tandem roller, PTR( pneumatic tyre roller), water tanker, tack coat/ primer sprayer etc . Actual work at site.
1 Expansion joint on Major Bridges
• Expansion joint on Maj...
2 (RMC)Concrete Batching Plant in construction industry
• (RMC)Concrete Batching...
3 Vertical Pile load test by Static Method
• Vertical Pile load tes...
4 Piling in Engineering Construction of Bridges
• Piling in Engineering ...
5 RE Wall Re-Construction
• Damage RE wall ko ES t...
6 DLC & GSB In road construction
• DLC & GSB In National ...
7 Railing in MNB/MJB (Footpath)
• Railing in MNB/MJB (Fo...
8 Precasting in Construction
• Precasting in Construc...
9 Construction Methodology of geocell lined slope
• Video
10 H.D.tower detail colour coding
• H.D.tower detail colou...
11 Carpentry must watch for civil engineers
• Carpentry must watch f...
12 Formwork, Scafolding for Structures
• Formwork, Scafolding f...
13 RE wall
• RE wall
14 RE wall geo-composite
• RE wall geo-composite
15 RE wall coping
• RE wall coping
16 RE wall (Reinforced Earth wall) part 2
• RE wall (Reinforced Ea...
17 RE wall construction very easy steps.
• RE wall construction v...
18 Sand Screening plant for construction industry..
• Sand Screening plant f...
19 For latest crazy tech & trending news
thecrazeclub.com/how-to-root-...
20 Site Work and MMM used in DBM
• DBM/BC work at Site
Whoever giving info is well experienced and covered all aspects
1. Air compressor is used to remive dust and small interfering particles
2. Firstly, Prime coat is applied over its previous GSB layer (Granular Sub Base) to make good bonding among Aggregates used in GSB layer and so that they don't move when Base Layer is poured over them.
3. Then Tack Coat is used to make base layer ready for better adhesion with upcoming bitumen Surface layer (wearing surface), if needed, micro surface sheeting can also be used in areas of high annual Rainfall to prevent water going inside 🤗👌
I think prime coat is applied over WBM or WMM layer not on GSB layer
@@MS-qm2hj na bhai, prime Field pr GSB k upar hi apply krte h and existing surface par Tack coating for upcoming Overlay
Prime coat is applied over WMM to stop the moisture of WMM into BM or DBM. And the Tack coat is used as a binder between BM/DBM and SDBC/Surface . And finally seal coat is sprayed over SDBC/ final surface as waterproofing
Thank you so much for this video..... Very knowledgeable
Good simple commentary. Thanks.
Your explanation is crystal clear...very well explained...
Thank you for the knowledgeable information 👍
Bahut acchi jankari mili
You are very helpful for us. Thank you sir
Very knowlageble video sir , Thank you so much
Very good bhai ji
Sir I have a project where v have excavated 2 ft of black cotton soil and filled it with murrum then road rolled and compacted on that wbm 100 mm layer on that again wbm 75 mm layer now for the final wat you suggest shall I clean it perfectly apply tack coat lay 1 no mettle layer and then apply tackcoat and lay grit bituminous carpet on that
This video is very useful to all of us
Thank you.. Informative video
Bohot bohot badiya
Thanks sir and please upload more videos like this
Thank you sir
Thank you so much sir
verry good road way industry work big network of india nice 😍😍
Very nice video
Very good
What will be grade of bitumen in tack coat and prime coat
Good information
Good job Bhai video banae raho
U r awesome ...
Keep up the best work👍👍
TOO GOOD A VIDEO
If one layer is layed at one side , then another side can be layed by using bed sensor , then why to use the string rods ( peg), at another side. Plz reply.
Excellent explanation. Really enjoyed the video. Jai Hind.
Thanks
Good video
Nice...
Sir ji thank you. Sir kitna square meter me kitna tone ya brass DBM lagega please explain kijiye sir please
What's the difference between normal cylindrical roller and tandem roller
thankyu
how we fix the speed tack coat vehicle speeed
सर आप बहुत ही अच्छी तरह से समझते है आप अधिक से अधिक वीडिया बनाया करे । धन्यवाद सुरेन्द कासगंज
Kasganj me kis jagah se hai.mai b kasganj se hu
dhanyavad
How much depth dbm layer compressed after rolling.
Sir i need defenation to prime coat n tack coat
Very nice video.. Greetings from other Civil Engineering CZcams Channel..
Thank u so much sir for such informative video ,pls aise video bare rahiye
Please aise videos banate rahiye sir. Aur road Ka technical term v bata dijiye
Good 👍🏻
nice
Sar, please tel,how to fix design level of w.m.m. for sensor paver? String to be provided,on both sides?
Is it necessary to more thickness asphalt laying pavement? Like if our requirement 50 mm thickness asphalt after Compaction how much we have to put when we are laying pavement.
Good question
15-20% of thickness
In trial streach we decide.
Super
Good initiative
Prime cot tack cote ka temperature laying time kitna hota hai
Asphalt mix Kaa ratio kya hota haii.. Bitumin dust sand and aggregate chips Kaa??
Good
Nice
Very good video
Thanks for the visit
Nice video
Good job
Thanks
DBm may kounsi metal use kartye hai sir plz bolo
Sir pls rolling paas kitne dena chahiye ptr or tendam roller se
Plz sir aese or knowledgable video banao plz🥰🥰👌👌👏👏👏
Bhayya I have a doubt
1) there is no safety for laying traffic vehicles are coming on laying surface
2) before laying it should be complete shoulders there is no shoulders preparation
3)in my observation there is no edge cutting happen in center
4) vehicles are not covered with tarpaulin so that temperature will reduce
Awaiting for your reply
Thank you
How much emulsion will I have to mix if I want to do 100 m DBm?
Sir mujhe bahut achha lga aapka video dekh ke
Sir mai btech kia hu
Mujhe puri knowledge chahiye road ki starting se end tk ka
Plz help me sir
Aapki bht kripa hogi sir plz
Meri vinti hai aapse
Make construction video on super elevation. How to main gradient on super elevation portion
Tack coat me per 10m squar kitna btmn lagta he
HELLO SIR , PLEASE MAKE A VIDEO ON THE TOPIC ARE :- (1) HOW TO SHIFT TBM .
(2) HOW TO SHIFT FLY TBM .
(3) HOW CHECK THE REQUIRED EXCAVATION LEVEL BY MAIN TBM OR ALSO ANY ONE FLY TBM VALUE .
(4) HOW TO CHECK THE TOP AND BOTTOM LEVEL OF ANY EARTHCRUST LAYER BY MAIN TBM OR ALSO BY ANY ONE FLY TBM .
(5) HOW TO CALCULATE THE QUANTITY OF EACH AND EVERY EARTHCRUST LAYER BY USING THE OGL DATA WE ARE TAKING FROM INITIAL STAGE OR BEFORE EXCAVATION STARTS.
(6) HOW TO MAKE EXCEL SHEET FOR THESE ALL WORKS AND CALCULATE .
Dear sir,
Sir GSB,WMM, DBM iski width kayse nikalate PL explain..
Sir basic ek theretical video banao Jo highway ki DPR se lekar final public ke lie open ho tab Tak ki processor...it will be help in any highway interview a lot
Sirji, I fail to know about tailcoat, prime coat and seal coat.
बहुत ही खूबसूरत से आप ने बताया सर् बहुत बहुत धन्यवाद
आप से निवेदन है जो सरचना आप दिखाते हो उसे बिल्कुल नेदिक से दिखये ओर सभी टेक्निकल पॉइंट पर विशेष फोकस देते हुवे बताये
धन्यवाद
Thanks
Prime coat or tack coat ka kya difference hai
Bahut badiya
Dsr mein 2cm premix carpeting
50mm, 75 mm wbm bhi bataye
Sir, is project ka Equipment schedule share kar sakte hain kya? Road construction main use hone wale equipments ka time cycle and resource allocation kaise karte hain.
What is the per square limit of bitumen spray?? Please tall.
How to provide level on peg wire?
sir pag par level kese check karte h ki level ka yhi point dekhna h
Traverse jont aur longitudinal joint kese karte hai... samjavo
Road keyse bonate he aur road ke process ky he
how to check on tickness of aggregates
Proportions of every layer taken,their density,?
Nyc Bhai
Ble ble
Sir, DBM matereal How mach one cub. M. How mach tone
Trucks are doing their work fully.
Is tack coat required between bituminous macadam and bituminous concrete or semi dense bituminous concrete
Yes ...if older than 1day
If freshly laid within some hours then not required...
@@DEofficial88 is it written anywhere in irc or any other cide
Dbm kiske wad kiya jata hai
Dipp chek kese karte hai Sir Please btana
Sir pls aap road construction mai kite test hote hai iska detail video bana dijiye
plz add a video on Construction of plain cement concrete pavement and RCC pavement with joints construction details
Why we provide 2 DBM layer when thickness are above 100 mm.
Sir 👍
What's the loose of dBm BC
Tell me difference between asphalt and dbm
Sir eta kese Hota hai
Sir please upload a video for flexible pavement layers and how to level on that..
Road Marking Service
Rod survey bataye kaise kare.
Sir paxe pe leval dena or check krne Ka video upload kre starting se TBS se Back side lete se or leval dete tak or chack krne tak
White powder used after dbm work is what.. is it white cement of lime
No need of such lime
Road ki density kistni hoti h. App is Road pr kistna load de rahe h
Very good. But sir when mention different types of material also mention the related IS CODE. And also make a video on how to maintain slope in various layer.
Ok dear
Very good vedio for knowlde.
1 How many ROLLING pass for BC and DBM.how calculate.
2.when become segregation how remove it..
पहले लेयर के साथ जो vertical joints हो रहा है उसका edge कटिंग करना चाइए ya नही? यह फिर edge को blue lamp se गरम करना चाइए?
What is VTS
Sir, after spreading of track coat how much time need to wait for laying of DBM
12 h. maximum
Sir yh payg kyse dete hai , please sir mujhe janna bhut argent hai