First energisation of 85MVA 33/11kV GT & 11/3.3kV auxiliary transformers on a new CHP plant

Sdílet
Vložit
  • čas přidán 10. 01. 2022
  • This is a record of the final client walk through of a 33kV system prior to first energisation. The external 33kV backfeed will power this combined heat & power plant for the very first time. The circuit to be energised is the gas turbine leg, that will energise the 33/11kV 85MVA GT transformer and 8MVA 11/3.3kV auxiliary transformers at the same time.
    From design through to certification, let's give you a glimpse inside the world of the industrial electrical environment covering systems, networks & apparatus up to 33kV and down to 24VDC!
    These videos are for general information and entertainment purposes only. They are not intended as a set of instructions or guide on how to execute any electrical works. All our works are undertaken by competent and authorised engineers & technicians who have sufficient knowledge, experience & training to work safely. Electricity is dangerous! Any work on electrical systems must only be undertaken by those who are professionally competent to do so.
    www.powerai.co.uk