Hollandia Infra Clyde Crossing swing bridge [English]

Sdílet
Vložit
  • čas přidán 27. 06. 2024
  • Over the past months, our colleagues have been working hard on the Clyde Crossing swing bridge. From progressing the preliminary design into the final design, followed by the fabrication and outfitting of the entire southern bridge.
    Following an impressive start of the transport through Rotterdam, this part of the bridge has arrived in Scotland and has been successfully installed. Meanwhile, the northern bridge, produced by Iemants/Smulders, has also arrived on site and has been installed as well.
    At present, our colleagues and partners in Scotland are working hard to ensure the full bridge can be finalised and handed over soon. We are very proud of this complex project, which we are making a reality due to the good collaboration with partners and subcontractors, and the craftsmanship of our employees!
    𝗖𝗹𝘆𝗱𝗲 𝗪𝗮𝘁𝗲𝗿𝗳𝗿𝗼𝗻𝘁 𝗮𝗻𝗱 𝗥𝗲𝗻𝗳𝗿𝗲𝘄 𝗥𝗶𝘃𝗲𝗿𝘀𝗶𝗱𝗲
    Hollandia Infra, in collaboration with Iemants/Smulders and commissioned by the GRAHAM Group, is building a new riverside connection in Glasgow over the River Clyde. This riverside connection consists of an architecturally designed double swing bridge with a total span of 180 metres. Hollandia Infra is responsible for the southern part of the bridge.
    Read more about this project 👉: hollandia.biz/en/projecten/cl...
  • Věda a technologie

Komentáře •