Shelford to Cambridge cab ride (Taken 05-02-2024)

Sdílet
Vložit
  • čas přidán 2. 03. 2024
  • Cab ride through the Cambridge South Infrastructure Enhancements project construction sites (Shepreth Branch Junction, Cambridge South station, Hills road) then into Cambridge station.
    (Note: There is no sound)

Komentáře • 7

  • @ianhosier4042
    @ianhosier4042 Před 3 měsíci +1

    I see cambridge south station is shaping up nicely

    • @moo13579
      @moo13579  Před 2 měsíci +2

      Indeed. :) Lots more work to do yet and I'll post more videos in future.

  • @daviddearden6372
    @daviddearden6372 Před 3 měsíci

    Thanks for that ,interesting little video. Lots of work going on to the the south of the new Cambridge South station, what is all that for?

    • @moo13579
      @moo13579  Před 3 měsíci +1

      That's in preparation for the upgrade of Shepreth Branch junction. It's being increased from 30mph to 50mph, with the Down Royston extending around 500 Northwards. That's what you can see on the left - the formation preparation for the new track. Have a look here if you want more info: www.railforums.co.uk/threads/cambridge-south-new-station-construction-progress.141520/

  • @martyn6792
    @martyn6792 Před 3 měsíci

    Nice ride, I used to use that line years back before and post electrification, alot has changed, what service was that on you took video from ?

    • @moo13579
      @moo13579  Před 2 měsíci

      Greater Anglia train. Class 720 IIRC. Handled well and my camera was nice and stable on it's little tripod.

    • @martyn6792
      @martyn6792 Před 2 měsíci +1

      @@moo13579 those sort of cab rides are really interesting as showed all the work going on plus a reminder for me of what it is now like