Brynetic Sports brings you engaging sports features and in-depth analysis. chat.whatsapp.com/Bb73Zk8rxGl... SMS/WhatsApp +256703148897 Email: bryanlwangaroland@gmail.com
The challenge in Uganda is dely in service delivery.... Imagine upto now we dont have architectural plans for the stadiums... Even using less experienced contractors is another challenge
but president m7 explained why they chose Hoima,But there is no work going on ,preparations are tooooo slow ,at least we would have seen some bull dozers on the ground leveling the ground
But why divert Buhinga stadium ,every process was done we were only waiting for the contactor.i don't see other regions hosting AFCON better than fort portal the airport issue was not critical.
Uganda lacks in professional planning in everything, unfortunately. However so far on the building of the hydro power stations, Uganda has been topping the region because of the Nile. Although Tanzania threatens this lead with the 2115 Megawatts Nyerere hydro dam. However Uganda is conturing to build a Nuclear power at 14000 Megawatts !?! Wow ! Hopefully we shall soon get the architectural drawings to back this up. But the rest like in the railways (Tanzania tops), Airports (Kenya tops), Express ways ( Kenya tops), Sports ! looks like Kenya is going to lead again with Talanta stadium and many more stadiums are also planned.
According to information around its a training facility unless the remaining requirements like changing the turf to a natural one among others are met @@KabuyeRaphael-pu7xe
The challenge in Uganda is dely in service delivery.... Imagine upto now we dont have architectural plans for the stadiums... Even using less experienced contractors is another challenge
Mwana that's frustrating...n so unproffessional
but president m7 explained why they chose Hoima,But there is no work going on ,preparations are tooooo slow ,at least we would have seen some bull dozers on the ground leveling the ground
Exactly that's my worry
We also need the standard gauge railway to enable movement during AFCON but it is just delaying
But why divert Buhinga stadium ,every process was done we were only waiting for the contactor.i don't see other regions hosting AFCON better than fort portal the airport issue was not critical.
make me proud munyoro
Uganda lacks in professional planning in everything, unfortunately.
However so far on the building of the hydro power stations, Uganda has been topping the region because of the Nile.
Although Tanzania threatens this lead with the 2115 Megawatts Nyerere hydro dam.
However Uganda is conturing to build a Nuclear power at 14000 Megawatts !?! Wow !
Hopefully we shall soon get the architectural drawings to back this up.
But the rest like in the railways (Tanzania tops),
Airports (Kenya tops),
Express ways ( Kenya tops),
Sports ! looks like Kenya is going to lead again with Talanta stadium and many more stadiums are also planned.
Good observations thank u
But why is Hoima Stadium a 20,000 seat capacity?? Uganda has to start planning for our population growth. 20K capacity is way too small.
Preferably running away from costs because of wat comes with a 60k or 45k Seater
And how big do you think Fulhams home Craven cottage is in UK what do you mean?
@@koiregerald2034But most stadiums in England are being widened and renovated at least to compete for World Cup hosting.
U ask for more whn u cant fill wankulukuku?even 20k is to far much.
@@koiregerald2034 we are talking about a national stadium here. NOT a regional club sports ground/stadium.
Denver stadium updates
Soon...
Ate ekya nakivubo tekyigenda kukyaza?
According to information around its a training facility unless the remaining requirements like changing the turf to a natural one among others are met @@KabuyeRaphael-pu7xe