80x100 Metal Building: 31 Day Construction Time Lapse

Sdílet
Vložit
  • čas přidán 10. 09. 2024
  • This is a long time lapse construction sequence of the 80x100 shop being built. It starts right after the footers were poured and continues through the foundation forming/rebar, pump truck pouring the slab, building framework being put together, siding installation, and roofing. This time lapse was shot with a GoPro Hero 3 Black over 31 days. I used my 12 volt long-time-lapse setup and my belt mount. The camera was set to take a 12MP/wide picture every 60 seconds. After it was all done I ended up with around 15,000-20,000 pictures to go through. The building came from qualitymetalinc... in AR. The ceiling height inside at the peak is 22'. The sidewalls are 16' tall. The end walls have a 8' overhang and the sidewalls have a 10' overhang.