Simplified Deep Water Well Development, Testing, and Production

Sdílet
Vložit
  • čas přidán 4. 03. 2023
  • This video is about developing and cleaning-up of a newly-drilled deep water well. It also includes how the well is tested for flow capacity. Additionally, it includes the installation of a submersible pump and motor to transfer the water out of the well for actual production. Computations for determining pump power is also illustrated.
  • Věda a technologie

Komentáře • 1

  • @antoniobendeck8172
    @antoniobendeck8172 Před rokem

    I just completed a 154' deep well with mud rotary. But have not yet completed the development procedure. Its been two weeks since completion. Which method do you think best fit my situation. I used a 4" PVC casing with horizontal slots all the way to the water level.