Save Time and Effort by Automating Microsoft Planner Tasks using Power Automate (2023)

Sdílet
Vložit
  • čas přidán 28. 08. 2024

Komentáře • 30

  • @slinnky
    @slinnky Před 7 měsíci +1

    It looks like there's a bug in Power Automate for me. When I try creating a checklist, the "Is Checked" input doesn't give me a Yes/No drop down. Instead it only lets me add function/dynamic content. Of course when I save Power Automate throws an error saying the input is expecting a boolean. Any ideas how to get around this bug?

    • @slinnky
      @slinnky Před 7 měsíci +1

      I just answered my own question. Typing in "false" instead of "No" solves the problem.

    • @your365coach
      @your365coach  Před 7 měsíci

      Thanks for the update and I’ll pin this on the video in case anyone else gets stuck. Thanks again for sharing 😃

    • @Zeesh90
      @Zeesh90 Před 4 měsíci

      @@slinnky Although this did let me save and run a test without showing errors, the test run failed (even though the task does get created - there is no checklist)

  • @dekstarking
    @dekstarking Před 3 měsíci

    Thanks Scott! Really great, easy to understand tutorial.

  • @SuperPhan88
    @SuperPhan88 Před měsícem

    Thank you for your help, Scott. I had an issue selecting "no" on the checklist. The solution is to revert to the old version, which has a dropdown for "yes" and "no." Thanks again.

  • @kensleylewis
    @kensleylewis Před 5 měsíci

    It would be nice if there was way to dynamically set "In Progress" on the Progress status if we wanted to.

  • @cossack4930
    @cossack4930 Před rokem +1

    Would love creative ways to practically automate in OneNote. Does Power Automate work with Loop yet?

    • @your365coach
      @your365coach  Před rokem

      I'll have a look and see what's possible in OneNote with Power Automate 😀.
      In terms of Loop, it's really it's own architecture right now, and therefore there's no integration yet with Power Automate. Although I think Loop works well, when you need to create some content in one app and then effectively copy it into app, for review or use, without the need to re-create it too.

  • @TheOlivertabin
    @TheOlivertabin Před 11 měsíci +1

    Hello. Great content! Is there a way to use a list of dates from Excel for the start date and due date of the task?

    • @your365coach
      @your365coach  Před 11 měsíci

      Thanks for your question, and yes, it would need to be passed through in the correct format into Power Automate, but yes it's feasible to have that date copied from an Excel cell 😀

  • @user-hk6qm8tr7w
    @user-hk6qm8tr7w Před 11 měsíci +1

    Do you have a video that shows you how to bulk upload an excel file with task, start, due date and who the task is assigned to? I am trying to do this for 300 task but I am coming into an issue where the start and due date and not transferring and some task are duplicating assigning to a different person from my excel sheet.

    • @your365coach
      @your365coach  Před 11 měsíci

      Sadly we don't have a video covering that topic, but maybe something we can record in the future. I would guess that your data from Excel is not in a Date format which Planner accepts, so I would just check the date formatting used in the table. It's odd that the task is duplicated, so again just check that your data is structured into an Excel Table (like I think we cover in this video) and then for each Row, you create a Task. For assignment, ensure you use e-mail addresses which I think can be separated by semicolons. This is because the e-mail address is what is used for assignment, rather than someone's name.

  • @rafaelbosco4610
    @rafaelbosco4610 Před 3 měsíci

    Can it be created with the "repeat" field?

  • @kelemvor3333
    @kelemvor3333 Před 10 měsíci +1

    Could I do this by filling out a spreadsheet with all the task names and other details I want and then having Flow read through that instead of manually creating a step for every task I want created?

    • @your365coach
      @your365coach  Před 10 měsíci

      You certainly can do that - it would depend on your specific requirements, but if you had a Spreadsheet, you would list all your Tasks in a Table (you need to format your data as a Table in Excel), and then before you add the 'Create a Task' action, you could add an action to 'List Rows Present in Table' under Excel in Power Automate. You can point it to your Table, and then in the next option, you would get a 'For Each' and then you can simply add the same logic to Create a Task in Planner, and it will use each Row from your Table as the input to the Task.
      This article here show's a little about this: powerusers.microsoft.com/t5/Building-Flows/Looping-my-Power-Automate-flow-for-each-row-in-Excel-Online/m-p/2334623
      Obviously, I would recommend testing this and reading up on how to do this before you dive in, but certainly it's possible to do, and get the data from Excel and run it to Planner.

  • @TremainSr
    @TremainSr Před 4 měsíci

    Hello, is there a way power automate planner to export to excel?

  • @chloemag7144
    @chloemag7144 Před 7 měsíci +1

    I'm trying to come up with a way to duplicate tasks from one Planner board to another based on some kind of trigger. I don't want all tasks to go to the second board, just selected ones. Is this possible? I'm wondering if I can use a label in some way for Automate to determine if a task should be copied or not.

    • @your365coach
      @your365coach  Před 7 měsíci +1

      Yes that's a difficult one, as you would need some type of Trigger to then copy the Task into Planner which I don't think Planner supports as yet within Power Automate sadly

    • @chloemag7144
      @chloemag7144 Před 7 měsíci

      @@your365coach I was afraid of that. Thanks anyway!

    • @mrkrud
      @mrkrud Před 4 měsíci

      It would be nice to have tasks that were sharable with another teams planner. Imagine when creating the task you could keep adding more groups teams and buckets. My use case is that I have a training team where managers can discuss and generate buckets and tasks. Would be great to just spawn certain task subsets to some other team a trainer has with the trainees. Could even create a subset of tasks for each trainee such as watching sets of videos.

  • @larissaberry9183
    @larissaberry9183 Před 10 měsíci +1

    How can you add it so it due date is always the last working day of the month

    • @your365coach
      @your365coach  Před 10 měsíci

      Sadly, this would not be something easy to achieve within Power Automate. However, there is a 3rd Party Blog Post below which does cover this scenario, which may help, however I have not tried this to confirm if it works 😉
      www.madaboutbc.com/2023/04/24/perform-an-action-on-last-work-day-of-the-month-with-power-automate/#:~:text=If%20the%20day%20of%20the,%2DMM%2Ddd').

  • @ellieplayz4919
    @ellieplayz4919 Před 7 měsíci

    thanks for the video. When I add the due date formula, it states it is an invalid datetime. any idea on what the formula update should be?

    • @kensleylewis
      @kensleylewis Před 5 měsíci

      try using the following as an expression, where 'Due Date' is the name of your column in Excel - addDays('1899-12-30',int(item()?['Due Date']),'yyyy-MM-ddThh:mm:ssZ')

  • @slinnky
    @slinnky Před 7 měsíci

    When using Power Automate to output a description for a Planner card, is there a way I can have text display across multiple lines? Right now all my text is being outputted as a single line, which makes it hard to ready.

    • @your365coach
      @your365coach  Před 7 měsíci

      Sadly, I don't know the answer to that one sorry. I did find an old MS Support Article from 2021, but not even Microsoft responded to it either. I think it could be that the output is being wrapped as a single line of text in the API call, but I think that is then by design sadly.

  • @ellieplayz4919
    @ellieplayz4919 Před 7 měsíci

    Sorry - forgot to add that the free text in the check list section is not allowed. Is there a work around for this. Your video does exactly as i want, however will not let me add the data in as you have.

    • @your365coach
      @your365coach  Před 7 měsíci +1

      Can I just check if your using the new Power Automate Experience (it will look different to what I show in this video) and if so, maybe try with the older experience and see if it helps
      arashaghajani.com/blog/two-methods-to-switch-to-classic-designer-in-power-automate/

    • @ellieplayz4919
      @ellieplayz4919 Před 7 měsíci

      @your365coach yes, I have been using the new experience. I will try again using the older experience. I will report back. Thanks for the response.