ASTM C78 - Flexural Strength

Sdílet
Vložit
  • čas přidán 26. 08. 2024

Komentáře • 17

  • @jesusglopez8430
    @jesusglopez8430 Před rokem

    Thanks for sharing.

  • @suhaibahmed3972
    @suhaibahmed3972 Před 3 lety +2

    Thank you so much

  • @surkhabalam7684
    @surkhabalam7684 Před 10 měsíci

    Nice video

  • @gabriellastadler7721
    @gabriellastadler7721 Před 2 lety +1

    How long should the specimen be in the mold before removing it and curing it?

    • @cttparkansas4219
      @cttparkansas4219  Před 2 lety +1

      The specs loosely say up to 48 hours. As a general rule when kept properly between temperatures of 60 to 80 degrees while curing, it is generally safe to strip concrete cylinders and beams the next day, though if its kept in cold temperatures you may want to use up to that full 48 hours to make sure they aren't "green", which is a term to mean it hasn't fully hardened yet.

  • @hassanamjad5323
    @hassanamjad5323 Před rokem

    Whats the length of the beam

  • @sitinuraisyahjemat9898
    @sitinuraisyahjemat9898 Před 9 měsíci

    What are the speed testing

  • @carlosalcidestupayachimarm5840

    Very helpfull!

  • @jetson3851
    @jetson3851 Před 2 lety

    Is ultimate load the maximum load or is it the load at constant rate?

    • @cttparkansas4219
      @cttparkansas4219  Před 2 lety

      Yes you can think of ultimate load as the maximum load. The loading rate has to be between 125 and 175 psi/min (or that would convert to 1,500 to 2,100 lb/min....which would further convert to 25 to 35 lb/sec depending on how your compression machine reads)

  • @dinkykohli4885
    @dinkykohli4885 Před 3 lety

    Sir how many support nblocks we r using

    • @cttparkansas4219
      @cttparkansas4219  Před 2 lety

      This type of setup has 2 support blocks (that the beam is resting on) and 2 loading blocks (applying the flex load)

  • @notachannel3104
    @notachannel3104 Před 3 lety

    how do we know 3%-6% of estimated maximum load?

    • @Sierrablue03
      @Sierrablue03 Před 2 lety

      Read the spec of the job

    • @cttparkansas4219
      @cttparkansas4219  Před 2 lety +2

      That depends on what we anticipate the maximum load to be. The whole idea of the 3-6% is to just put enough of the load for the loading/support blocks to be fully in contact with the beam, thus being able to check for gaps using the feeler gauge. As a loose ballpark, typical beams may have a maximum load of between 6,000 to 12,000 (much smaller as compared to cylinders). 3% of 8,000 would be 240. 6% would be 480. So as an approximation, we could say between 200-500 load (which is extremely small) can be applied, but again it depends on what the expected maximum load is.

  • @user-vx5vp7ig4t
    @user-vx5vp7ig4t Před 3 lety

    ok

  • @gesyukushibatasou-mansion

    私たちの見てくれませんか
    (12) A NEW IDEA CONCRETE number 1 - CZcams