SEPTA trolleys and CSX freight in Darby

Sdílet
Vložit
  • čas přidán 11. 09. 2024
  • Route 11 trolley was delayed due to CSX freight crossing 6th & Main Streets in Darby. I stopped recording because the train had stopped in the middle of the diamond crossing. The trolley tried to beat the train, but was forced to stop and had to reverse. Trolley pole came off the underside of the wire, but it was able to back up before CSX came through

Komentáře • 6

  • @Oldgustav
    @Oldgustav Před 7 lety +4

    About 60+ years ago they had derail track there for the trolleys . Every time a trolley came up the watchman had to pull a lever to allow the trolley to pass. I remember the trains use to fly through this crossing whether it was a freight or a Blue and White passenger train.

  • @MegaZsolti
    @MegaZsolti Před 9 lety +3

    Why did the trolley stop? I'm pretty sure the driver could've still quickly crossed at that point.
    And why did the train driver stop before they crossed?

    • @southeasternpennsylvaniara1588
      @southeasternpennsylvaniara1588 Před 5 lety +2

      MegaZsolti because he was being extra cautious. What if in the middle of crossing the tracks the trolleys pantograph slipped off the catenary?

  • @turn-tableman4415
    @turn-tableman4415 Před 7 lety +2

    why did the freight train stop in the middle of the crossing

  • @nielspemberton59
    @nielspemberton59 Před 6 lety +2

    CSX needs to eliminate this grade crossing. via a grade separation.