Nitrogen Charging - NPK Hydraulic Hammer Service Instructional

Sdílet
Vložit
  • čas přidán 27. 08. 2024
  • This service instructional covers the basics of maintaining a safe nitrogen charge in your NPK hammer by demonstrating steps for both charging and discharging your hammer. For more information about NPK hydraulic hammers or any other NPK product, visit our website at www.npkce.com.

Komentáře • 21

  • @rohitswain2076
    @rohitswain2076 Před 4 lety +3

    Though I didn't understand properly how to release nitrogen gas completely for storing longtime breaker but it's good video to have a overview of the procedure. Thanks.

    • @NPKConstruction
      @NPKConstruction  Před 4 lety

      Glad to hear that you found the overview helpful. If you need additional info regarding releasing nitrogen gas, please feel free to reach out to our service department at any time.

    • @NPKConstruction
      @NPKConstruction  Před 4 lety

      service@npkce.com

    • @NPKConstruction
      @NPKConstruction  Před 4 lety

      440-232-7900

  • @aissaguennona3935
    @aissaguennona3935 Před 2 lety +1

    I have qoistion .ihave breaker stones (sandvik br3890city) i need to now how mutch présure of gas Can add i have no catalogue no notice pleiz advice me

  • @hasanhamed3233
    @hasanhamed3233 Před 3 lety

    thank you

  • @jacobm4513
    @jacobm4513 Před 3 lety

    What is the link for the charging system

  • @cesarvargas8045
    @cesarvargas8045 Před 4 lety

    Question... after 30min working why the Hammer gets hot to a point that stops working?

    • @NPKConstruction
      @NPKConstruction  Před 4 lety

      Hello Cesar, apologies for the delayed response. Please reach out to Carlos in our service department. He speaks Spanish as well. His email address is carlos@npkce.com.

  • @toddromanczuk2932
    @toddromanczuk2932 Před 7 lety

    if operating a gh15 approx 8-9 hours a day what would you consider to be fair amount of grease being used by auto greaser g025?

    • @NPKConstruction
      @NPKConstruction  Před 7 lety +1

      I will check with our service department and get back with you shortly.

    • @NPKConstruction
      @NPKConstruction  Před 7 lety

      Depending on actual duty cycle of the hammer, you should use a tube about every 4 hours. So in this case, you should be consuming approximately 2 tubes of grease per day.
      The most important thing is to observe a constant flow of grease down the hammer tool. If the tool is shiny, like metal to metal contact, then something needs adjusted on the greaser for additional output. Here is a link where you can find the hammer mounted autolube manual: www.npkce.com/publications/autolube-publications/. Reference page 51 for adjusting the throttle on the greaser to adjust the output of grease.

    • @toddromanczuk2932
      @toddromanczuk2932 Před 7 lety +1

      NPK Construction Equipment Inc ok I thank you for your immediate response! I did some trouble shooting and found that the greaser unit is malfunctioning. thanks

    • @NPKConstruction
      @NPKConstruction  Před 7 lety +1

      If you have issues in the future with your greaser or any other NPK product, you can contact our service department directly on our website www.npkce.com, by emailing service@npkce.com, or calling toll free 800-232-8280 and asking to speak with someone in service. We would be happy to help get any issues straightened out!

    • @KamalMira-ub9rx
      @KamalMira-ub9rx Před 4 lety

      NPK Construction
      Equipment Inc

  • @user-xx4ml6is5s
    @user-xx4ml6is5s Před 4 lety

    ياريت اصيفو الترجمه

  • @ridamherdawy9020
    @ridamherdawy9020 Před 4 lety

    نوع سوسان كوري قياس/60/

  • @mintukumaryadav9541
    @mintukumaryadav9541 Před 4 lety

    Hindi me batay

  • @imforme1
    @imforme1 Před 5 lety

    اصعب شيء بالسعوديه مافي عندنا احد. يعرف له صحيح الا قليل

  • @user-xx4ml6is5s
    @user-xx4ml6is5s Před 4 lety

    ياريت اصيفو الترجمه

  • @user-xx4ml6is5s
    @user-xx4ml6is5s Před 4 lety

    ياريت اصيفو الترجمه