W9 River Crossing Replacement Project

Sdílet
Vložit
  • čas přidán 27. 11. 2023
  • Located 13.5 m below the riverbed, the stage is set for power to flow deep under the Assiniboine River. The W9 River Crossing Replacement Project, which began just over a year ago, is about to wrap.

Komentáře •