Video není dostupné.
Omlouváme se.

HS2 Section C1 - Chiltern Tunnel Cross Passages Grouting

Sdílet
Vložit
  • čas přidán 15. 08. 2024
  • Subscribe: bit.ly/2ImjDkD
    Every day, people around the world live, work and play on ground prepared by Keller. Used alone or in combination, our techniques solve a wide range of geotechnical challenges across the entire construction sector - from industrial and commercial to housing, infrastructure and environmental projects.
    #KellerGroup #Geotechnical
    Website: www.keller.com/
    Twitter: bit.ly/2ShUrMC
    Facebook: bit.ly/2E2SqP9
    LinkedIn: bit.ly/2IrtmGU
    Instagram: / keller_uk
    Keller Group on CZcams:
    / kellergroup

Komentáře • 3

  • @Sam-nc1zi
    @Sam-nc1zi Před rokem

    Thank you for uploading

  • @philipareed
    @philipareed Před rokem

    Since virtually nobody uses kilometres in the UK, 16 kilometres is 10 miles.