  • Join Brayden as he steps through all of the settings currently available on the 6000XP during commissioning. The 6000XP is very versatile in its operation as an off-grid inverter, so it's important to be familiar with your settings!
    Our Website: eg4electronics...
    Our Distributors: eg4electronics...
    #6000XP #EG4 #powermorewithEG4 #energygeneration4everyone

Komentáře • 24

  • @user-tv8ey6qy9j
    @user-tv8ey6qy9j Před 2 měsíci +5

    There is a lot of confusion about charging Lifepo4 batteries in lead acid mode. I already had 4 100ah off the shelf batteries and added 4 more. We spend a lot of money with you for these inverters and it seems this area is lacking. thanks

  • @darylw792
    @darylw792 Před měsícem +1

    If setting #11is initial cut off and setting #12 is the final cut off why can't setting #11 be higher than setting #12? The Inverter will not allow me to set the value in #11 higher than the value in #12.

  • @sprtplt
    @sprtplt Před 2 měsíci +1

    You just started by skipping the switch state for the battery before doing anything. Shouldn't the battery breakers be off?

  • @karlheinz7112
    @karlheinz7112 Před 3 měsíci +1

    Can this be used in Europe 240v 50hz?

  • @gmsgabaradama2009
    @gmsgabaradama2009 Před měsícem

    How do I turn them this off of UPS mode for some reason it starts to charge my batteries from grid randomly

  • @Theodore-tj4jo
    @Theodore-tj4jo Před měsícem +2

    Far too fast for those not familiar with it already.Much more detail needed, on every single step, again slower. Such as matching audio to finger settings, he is not synching slowly enough to catch and how do you change the date is the order yr / mo / day ? etc etc all along way to confusing for some.

  • @daddio7249
    @daddio7249 Před 2 měsíci

    I am running my 6 Lifepower4 batteries in lead acid mode. They need updating to work and the software patch wouldn't work. I was promised an updating device but it hasn't arrived yet.

  • @TroyWarr1980
    @TroyWarr1980 Před 2 měsíci

    I didn't see the card or link for the GenBoost feature overview. Can you point me to it?

    • @eg4electronics
      @eg4electronics  Před 2 měsíci +1

      Absolutely, here is a link to that video:
      czcams.com/video/EcLp__CDLf0/video.html

  • @mcdaniel236
    @mcdaniel236 Před 3 měsíci

    Are these settings applied the same to all inverters in parallel
    Ex. 4 inverters in parallel

    • @AndrewVanTil
      @AndrewVanTil Před 3 měsíci

      AFAIK, you make the changes on the primary inverter. It publishes the settings to the secondary inverters.

  • @unemployedredneckhillbilly2023

    Wish they had a proper UL listing for building codes. Just watched a video where they all had to be removed and replaced to meet electrical code. Just ordered my panels from you but skipped the inverters because of that and looking at alternatives. Will these ever receive proper UL ratings for use under the NEC so they can be legally used?

    • @kenthiergartner1506
      @kenthiergartner1506 Před 3 měsíci +2

      Can you post a link to the video?

    • @unemployedredneckhillbilly2023
      @unemployedredneckhillbilly2023 Před 3 měsíci

      ​ @kenthiergartner1506 czcams.com/video/i7CsDm1FfbI/video.html

    • @unemployedredneckhillbilly2023
      @unemployedredneckhillbilly2023 Před 3 měsíci

      @@AndrewVanTil watch the video. He explains how it is illegal according to the NEC and can't get a permit to finalize the installation.

    • @jrf2112swbellnet
      @jrf2112swbellnet Před 3 měsíci

      From my understanding, they have been tested to comply with UL 1741, but are not UL listed, which only happens when UL tests them. Not a third party.

    • @AndrewVanTil
      @AndrewVanTil Před 3 měsíci

      UL fills two roles in this area. First, generating the standards for NRTLs to certify against. Second, as an NRTL. The NRTLs are functionally equivalent. It doesn't matter if UL or Interek (for e.g.) perform the certification. It is the same thing. You can view the certification of compliance with UL 1741 here: eg4electronics.com/wp-content/uploads/2024/04/EG4-6000XP-UL1741-Certificate-of-Compliance.pdf.

  • @sspyder181
    @sspyder181 Před 3 měsíci

    If you have an existing GT system you can force AC charge while your GT is producing, like time of use... keep what you make, island as much as you can. Unless you have a 1 to 1, then this doesn't apply.

  • @patrickcollins7030
    @patrickcollins7030 Před 3 měsíci

    Wonder if this is compatible with AOlithium 48v batteries?

    • @eg4electronics
      @eg4electronics  Před 3 měsíci

      I don't believe AOlithium is a BMS that is supported in closed loop, unless it utilizes a protocol that one of the supported battery brands has. You can find the compatibility list here: eg4electronics.com/wp-content/uploads/2024/04/EG4-6000XP-Battery-Compatibility-List.pdf
      Otherwise, you should be able to utilize them in open loop (set as Lead-Acid on the 6000XP).

  • @roatanretired
    @roatanretired Před měsícem

    Agree, too fast for me. Great equipment, but could use some help to improve this video and more important the app.

  • @dinobernardi170
    @dinobernardi170 Před 10 dny

    On the fence with this and others. They talk like we understand there lingo.

    • @dalepatterson1748
      @dalepatterson1748 Před dnem

      While playing the video, go to the upper-right-hand side of the screen, press on the little gear, you can slow down the video.