Märklin Model Railroad. Branchline and Alpine section
Vložit
- čas přidán 28. 12. 2023
- A full run starting from shadow station #1 (Level 1), up through the helix, through the main station, up the branchline, through the branchline shadow station, up to the alpine station, through the alpine shadow station (Level 9).
Then back again.
Although most waiting time has been left out, the video still takes 10 minuttes. In total the Märklin E44 took over an hour to return to the starting point, because of the long waiting times in the sequential shadow stations along the way. - Auta a dopravní prostředky
Very smooth running models, I like seeing work in progress layouts.
Thanks.
Hi, nice driving scenes on your layout. This layout will be great when it is finished. Best wishes and all the best for next year, Toni
Vielen dank! :-)
Very nice driving video of your system. I just see that you also have a 6600 drive in use. 👍🙋♂️ Greetings from Michel
Thanks!
In total I own 3 6600 units, and was planning to use them for a shuttle train between the main station and the alpine station. However I am slowly leaning off this idea now, as it will interfere with the already heavy branchline trafic (controlled by the PLC) and the fact that it only allow older analogue locos to be used with the units.