LUAS Cross City - Liam Whelan Bridge Replacement - (5 minute edit)
Vložit
- čas přidán 18. 08. 2015
- For moe information: www.luascrosscity.ie
As part of the new LUAS Cross City construction, works were required on the Liam Whelan Bridge located on Fassaugh Road in Cabra.
The works involved a new deck being constructed adjacent to the existing structure on a temporary supporting structure. Once the new deck was ready, the existing deck was removed, installation of new foundations and abutments took place. Then the new deck was moved into position. - Věda a technologie
Impressive