Caterpillar 336E excavator digging for storm pipe

Sdílet
Vložit
  • čas přidán 9. 09. 2024
  • Moving trench box and digging for pipe run.

Komentáře • 27

  • @chriscolwell2963
    @chriscolwell2963 Před 3 lety +1

    Your laying pipe backwards. ? Is why

  • @tomie695
    @tomie695 Před 7 lety +3

    i though we started at low manhole with bell going up hill ..so u can plug in next pipe ...i could be wrong

  • @diggerdave51
    @diggerdave51 Před 12 lety

    Good Video, I don't know if this is a dumb question or not, but do you have a wellpoint system set up on this job ??

  • @billearnest
    @billearnest Před 7 lety +3

    being level might help you out and taking off the bucket.

  • @NYconstructionmodels
    @NYconstructionmodels Před 12 lety

    where are u guys located in florida if your even in florida?

  • @themilfologist
    @themilfologist Před 4 lety

    oh boy i dont miss the cage

  • @lanniepatterson6189
    @lanniepatterson6189 Před 3 lety

    Where is this at

  • @tomie695
    @tomie695 Před 7 lety

    your laying pie with bell down hill .??

  • @brendancadogan1372
    @brendancadogan1372 Před 7 lety +3

    why are you backlaying the pipes lads

  • @FLequipmentOperator
    @FLequipmentOperator  Před 12 lety +1

    this job is in Jacksonville, FL

  • @ernesthumes5774
    @ernesthumes5774 Před 5 lety

    If they would make the center of the pipe, it would speed the process up a bunch. My foreman will not set the pipe down to adjust. Do it too many times and the pipe layer will have a few words for you.

    • @chriscolwell2963
      @chriscolwell2963 Před 3 lety

      Fuck that operator unsafe if not level. Them pipe are.precision made but they do sometimes need a slight adjustment from center. Send that operator to the house next time. He is not all that great anyway

    • @chriscolwell2963
      @chriscolwell2963 Před 2 lety

      Fuck that operator that pipe needs to pick up level unles pipe layer says different the operator is noot the one thats gonna be in a casket or a sore head an if he does not give u time to level it jerk him off that machine an show him proper safe way

  • @tomcander3669
    @tomcander3669 Před 2 lety

    Working backwards

  • @paulpeters5199
    @paulpeters5199 Před 4 lety

    Might be digging negative grade

  • @FLequipmentOperator
    @FLequipmentOperator  Před 12 lety +1

    oh yes, we wellpoint on most of our runs just happened to be in a dry spot in this video.

  • @thomasbailey604
    @thomasbailey604 Před 10 lety +1

    in england you would fail your test for useing the sling with the bucket on. on site you would be told to do so maybe yellow carded, maybe told to leave

    • @johnnyrango6462
      @johnnyrango6462 Před 5 lety +2

      In England there's a bunch of pussys

    • @chriscolwell2963
      @chriscolwell2963 Před 2 lety

      @@johnnyrango6462 just to cheap to buy quick connect bucket assembley. Thats how a pipe sling if its steel cable gets jacked up it also weakens the cable. Ask tway rope an sling manufacturer an distributor They will say thats the biggest mistake people make. Are u laying negative grade or positive

  • @vincentolemberio5989
    @vincentolemberio5989 Před 3 lety +2

    is so noooo😡😡

  • @billearnest
    @billearnest Před 7 lety

    being level might help you out and taking off the bucket.