  • The University of Hull required a bespoke IT suite built to a precise specification and to seamlessly integrate into the surrounding campus infrastructure.
    Due to the ongoing growth of the data science, AI and modelling sectors (DAIM) - following the government's investment in STEM - the University wanted a state-of-the-art building to ensure education services stayed up to date with the latest advancements in technology.
    The new building needed a phenomenal internal environment to encourage productivity and provide a high standard of learning. To this end, the facility’s mechanical and engineering (M&E) infrastructure had to be exceptional.
    Premier Modular delivered an 805m², two-storey building for the University to expand its IT facilities. Premier were briefed with an initial plan for the building’s design in the tender pack provided by quantity surveyor and construction consultancy, Rider Levett Bucknall, and the University of Hull. Using this as a reference, Premier designed a specialist building that provided inclusive accessibility, fitted a constrained site and facilitated the University’s commitment to becoming carbon neutral by 2027.