New battery-electric train to Giga Berlin (uncut footage)

Sdílet
Vložit
  • čas přidán 9. 09. 2024
  • Today the new battery-electric train started it's operation for Tesla at Giga Berlin.
    The train is a Siemens Mireo Plus B. It can charge on electrified tracks and run on battery on non-electrified tracks. It is developed and built in Germany and uses lithium-titanium-oxide batteries from Toshiba, produced in Japan. The battery is located below the floor of the train. It can produce up to 1.7 MW of power and can reach up to 120 kilometers on battery.
    Get 5% off at Shop4Tesla with the code TOBIASLINDH
    Shop4Tesla is celebrating 5000 ratings on Trustpilot, so now you can also get additional 15€ off for one order above 150€ with the Code TRUST15 (limited offer):
    www.shop4tesla... (Werbung)
    Or visit Shop4EV to get accessoires for other brands:
    www.shop4ev.co... (Werbung)
    With the Code SPRING15 you can get 15€ off for one order above 150€ (limited offer)
    My new electric bicycle:
    himiwaybike.de... (Werbung)
    With the code TOBIASLINDH you'll get 50€ discount for the purchase of a new Himiway bike.
    If you want to support me:
    www.paypal.me/...
    / tobiaslindh
    Bitcoin: bc1qdl63dswrepe25hdh86wlktmrhcm29t3zyqa8k2
    Follow me on Twitter for the latest updates:
    / tobilindh
    See all my photos from Giga Berlin:
    photos.app.goo....
    For videos from Giga Shanghai I recommend the channel of Wuwa (乌瓦):
    / @teslash24
    #tesla #gigafactory #gigaberlin

Komentáře • 224

  • @ChristianBlueChimp
    @ChristianBlueChimp Před měsícem +25

    Thanks Tobias! Great new addition to the Berlin railways.

  • @paulsladen
    @paulsladen Před měsícem +16

    04:15 Pantographs (Stromabnehmer) on both units drop
    Also interesting to see that the unit is rented from Siemens [Smart Train Lease], is badged as NEB, but has the Yellow branding + Baden Württemberg seat cushions Lions (4:44) from the Baden Württemberg coat of arms in south Germany! (...or perhaps a word-play on Lion-batteries ;-)

    • @mys31f70
      @mys31f70 Před měsícem +1

      i was just so confused by the livery lol, i was like what is a SWEG train doing in Berlin

    • @Lisa-felinaLaraLinfert
      @Lisa-felinaLaraLinfert Před 29 dny

      mmt noch nach bw im einsatzDer ko

  • @einherjarspb
    @einherjarspb Před měsícem +47

    It's nice to see that old diesel train was replaced with smth more eco-friendly! And thanks for your work, Tobias!

    • @alanmay7929
      @alanmay7929 Před měsícem +1

      its a less capable train unfortunately with only 120km of range.

    • @ft4709
      @ft4709 Před měsícem +16

      @@alanmay7929 It's a train for crying out loud. Range means almost nothing, considering the 62% of the German network that are electrified. This thing is far more capable than its diesel predecessor.

    • @alanmay7929
      @alanmay7929 Před měsícem +2

      @@ft4709 its far less capable than diesel, it has significantly way less range and cant even in emergency be used to tow another train or wagon sets for example.

    • @alanmay7929
      @alanmay7929 Před měsícem

      @@ft4709 the 1000hp tesla semi can barely haul 82,000lbs for almost 500 miles dependong on the roads while 600hp diesel have been hauling 4x more loads tham the tesla while literaly crossing the outback, very bad unpaved roads, rivers.....

    • @ft4709
      @ft4709 Před měsícem +8

      @@alanmay7929 Let me reiterate: It‘s a train. More precisely: A BEMU passenger train, replacing an old Talent 1 DMU. Towing anything doesn’t really work with either of them, just based on the SchaKu alone. Besides: Your ignoring the fact that its range is literally infinite due to its capability to just use the existing overhead wires.

  • @flyshacker
    @flyshacker Před 26 dny +2

    Now I feel like I have ridden the train to Giga Berlin. Thank you. I hope to do so in person when I visit Berlin.

  • @WarrenLacefield
    @WarrenLacefield Před měsícem +10

    I know the area well from your drone flights, but this train video makes me feel exactly as though I was there, looking out the train window! Everything does look new but normal and properly sized (for ground level horizontal, not as viewed from high above out at the edge). Fun to feel the sound and the ride over tracks and into the station I've watched being built through many drone flights. This new train is beautiful, inside as well as outside. Thank you, Tobias!

  • @ludi7083
    @ludi7083 Před měsícem +28

    Geil. Jetzt war ich auch schon mal mit der Bahn bei Tesla 😀 Danke, Tobi!

  • @usefulname7134
    @usefulname7134 Před měsícem +9

    Brilliant! Thank you for the video

  • @johnhallett5454
    @johnhallett5454 Před měsícem +3

    Many thanks Tobias... for a most interesting and enjoyable train ride.
    I've frequently watched the regular service trains' arrivals from the Mainline onto the Branch line to the terminus shown in your aerial videos , and always wondered what the journey must be like to experience..

  • @pauldelrossi2582
    @pauldelrossi2582 Před měsícem +6

    Thank You!!

  • @olafd2371
    @olafd2371 Před měsícem +9

    For me as a fan of both BEVs (particularly Tesla cars of course) AND innovative railway technology that‘s actually the moment I‘ve looking forward to for quite some time now! 🤩
    Tobias, great video (as always), great achievement of Tesla, SiemensMobility and NEB !!! Although it‘s a short private siding track only, it‘s a very prominent one - and everyone can see it 🚉🔋☀️😎👍
    I‘d also love to get some Diesel trains replaced by such so-called BEMU trains in my area. Tunnel ceilings are too low on that track, there‘s no space for overhead catenary, so BEMUs could also help here - but I guess I still need some patience…

  • @Nix-007
    @Nix-007 Před měsícem +7

    Schöner Zug.
    Quitscht zwar noch etwas, aber wird sich aber denke ich mal einlaufen.
    Hoffentlich bleibt er auch lange schön sauber und wird nicht beschmiert von außen und innen.

  • @Andreas-rm7yc
    @Andreas-rm7yc Před měsícem +5

    That’s a Baden-Württemberg-Landesdesign train .. definitely not one that was built for Berlin or Brandenburg

    • @neelakantannaresh
      @neelakantannaresh Před měsícem

      Same suppliers maybe

    • @Andreas-rm7yc
      @Andreas-rm7yc Před 29 dny +4

      @@neelakantannaresh no. It’s a BW-branded design with the BW coat of arms animal (“Stauferlöwe”) in the seat marquee. Obviously, the manufacturer is Siemens.

  • @suchdevelopments
    @suchdevelopments Před měsícem +1

    😄Thanks, Tobias! Good day from GOONELLABAH, NSW, Australia! This is a great new addition to the Berlin railways. My journey began at two with a drawing on my bedroom wall in Newtown, Sydney. I went on a career as an engineer designing a railway in most of Sydney. I was the project manager and civil engineer. I worked as an engineer in Singapore from 1999 to 2005. We designed and constructed twelve-kilometre tunnels with two boring tunnel machines and five stations. I also managed 160 engineers and architects. I have been a contract engineer since 1975, Constructing sewage and water treatment plants from Melbourne to Cairns.

  • @timothymoy1766
    @timothymoy1766 Před měsícem +1

    Thank you for producing this video!! It was awesome to see the factory from ground level!!

  • @MarcoNierop
    @MarcoNierop Před měsícem +14

    So cool! It got the "Giga Train" logo, in the same font as Giga Berlin!
    Just before you get into the train, you see the pantographs go down, so from that moment it is running on batteries!... So cool it just charges from the overhead powerelines using the pantographs. But overall the train looks very nice, and clearly made for the short trips between Berlin and Giga Berlin.

    • @T330d
      @T330d Před měsícem +1

      Short Trip from Berlin to Texas? 😅

    • @MarcoNierop
      @MarcoNierop Před měsícem +2

      @@T330d Haha, honest mistake, corrected it

    • @carholic-sz3qv
      @carholic-sz3qv Před 27 dny

      WTF is giga berlin is that a new joke?!

    • @MarcoNierop
      @MarcoNierop Před 27 dny +1

      @@carholic-sz3qv Have you been sleeping under a rock? It's a factory near Berlin Germany producing about 350.000 Model Y's per year since 2021. It also produces battery materials for Giga Texas.

  • @user-ny2bx8ez1c
    @user-ny2bx8ez1c Před měsícem +6

    WOW....Fantastic.......Wish we had trains like that in the US. People running the US are turning it into a third world country. Even India has high speed trains !

    • @user-fx6hk3oq2i
      @user-fx6hk3oq2i Před 4 dny

      Your telling the truth. I bought candy yesterday on the c train from a migrant girl who looked to be about 6 years old with no adult in sight. Never seen anything so sad in my 40 years on the NYC train system.

  • @Ulli4Ever99
    @Ulli4Ever99 Před měsícem +10

    Danke das du uns mit genommen hast im neuen Giga Train zur Giga Factory.🔥💯🤗

  • @kannantm2731
    @kannantm2731 Před 2 dny

    it has nice interiors , and the last stage of the run was silent and felt different.During the start of the video there were contextual questions like its a train run on batteries on an electrified track ? what is the pantograph on this train meant for, but the later stages of the video clarified things that mattered. Defenitely useful for trains which are still energised by steam and diesel.

  • @durece100
    @durece100 Před 12 dny

    That looks great without overhead catenary or third rail.

  • @AlbrechtKoehler
    @AlbrechtKoehler Před měsícem +2

    Super, danke Tobi 👍

  • @TeslaElonSpaceXFan
    @TeslaElonSpaceXFan Před měsícem +2

    Vielen Dank!

  • @blackstone3469
    @blackstone3469 Před měsícem +2

    That is the future.....
    go for it!

  • @Juergen078
    @Juergen078 Před měsícem +9

    Thank you 👍

  • @explor794
    @explor794 Před měsícem +2

    Very cool, thank you for posting this. all we here in the US Is that Germans hate Tesla and want them out of business.

  • @arnomarkmann6118
    @arnomarkmann6118 Před měsícem +12

    Glückwunsch Tobias und Danke, weil Du immer der Erste bist wenn es bei Tesla wieder was Neues gibt. Hier gleich die nächste Bitte: Hat Tesla inzwischen die Kantinen alle geöffnet? Die in Shanghai sind so toll! Als ich das Video sah, ist mir das Wasser im Mund zusammen gelaufen - lecker lecker.

  • @davec2211
    @davec2211 Před měsícem +4

    Fantastic video Tobias! Thank you for sharing it, the train is so quiet and an excellent perspective of Giga Berlin from the track and journey in!

  • @r.perzylo
    @r.perzylo Před měsícem +9

    That was a nice experience for allowing us to see the voyage to GigaBerlin from the GigaTrain. Trademark names? Thanks Tobias, from 🇨🇦 🍁 🇨🇦

  • @jimprimo4068
    @jimprimo4068 Před měsícem

    Amazing video, Tobias. As if I were there myself. Very, very cool. Thank you.

  • @JaceTran
    @JaceTran Před měsícem +1

    Very roomy carriages, beautiful view

  • @ThysRoes
    @ThysRoes Před 23 dny

    Very cool. Batteries should have already had a much bigger role in trains.

  • @williamharding9753
    @williamharding9753 Před měsícem +1

    Nice train

  • @shazam6274
    @shazam6274 Před měsícem +1

    Thank you very much for this well photographed, wonderful video trip. Beautiful scenery, but somewhat surprised and disappointed by the graffiti though. Such a shame.

  • @RolfSchreiter
    @RolfSchreiter Před 28 dny

    Der Elektrozug ist abgefahren! ;-) (Danke Dir für Deine Arbeit!)

    • @iboy161
      @iboy161 Před 27 dny

      Der Zug gefällt mir auch, nur dürfen jetzt noch die Bahnsteige barrierefrei gemacht werden. Bringt viel, wenn der Zug Rollstuhl-Gerecht ist aber das Perron nicht! Für mich als Rollstuhlfahrer ist das sehr wichtig. Wir in der Schweiz haben solche Probleme fast nie und gerade bei einem Zug der zu Tesla fährt, sollte das eigentlich Standard Ausrüstung sein!

    • @RolfSchreiter
      @RolfSchreiter Před 27 dny

      @@iboy161 Wie ist denn Deine Aussage genau gemeint? - Der Zug ist rollstuhlgerecht, genau wie die Bahnsteige. Nur passt dieser Zug halt nicht zu diesen Bahnsteigen. Ich weiß jetzt nicht ob Dir das als Schweizer bekannt war, aber in Deutschland haben sich von den ganzen Bahnsteighöhen 2 durchgesetzt. Zuallererst 76cm, als Alternative 55cm. (Abgesehen von S-Bahnsteigen die noch höher sein dürfen.) Der Bahnhof in Erkner als auch der bei Tesla ist scheinbar mit 76cm Bahnsteigen ausgestattet, der Zug für 55cm ausgelegt. Somit sind Bahnsteige und Zug rollstuhlgerecht, aber passen halt nicht zusammen. Auf lange Sicht kann man nur den Zug mit einem anderen ersetzen, da die rollstuhlgerechten Bahnsteige Normhöhe haben und teilweise ganz neu sind, werden diese kaum geändert werden.

  • @TheEVUniverse
    @TheEVUniverse Před 29 dny

    Great video, Tobias! Thank you for reporting from the spot.
    I'll note this on tomorrow's Tesla Space newsletter (goes out to 7k Tesla geeks like us)

  • @PaulJann-e3m
    @PaulJann-e3m Před měsícem +12

    Vielen Dank für dieses Video. Schon lange habe ich auf eine solche Nachricht gewartet, da ich wusste, dass die Bahn solche Batterie elektrische Fahrzeuge bestellt hatte. Jetzt fehlen nur noch die TESLA semi Trucks für den Ersatz des Diesellastwagen-Verkehrs. ❤ Grüße Paul Jann, Nagypáli, Ungarn

    • @T.Stolpe
      @T.Stolpe Před měsícem +4

      Die Deutsche Bahn AG hat damit genau Null zu tun.

    • @Subway1306
      @Subway1306 Před měsícem

      @@T.Stolpe Die hat aber auch für die reguläre Nutzung ganz schön viele bestellt, wenn man sich die Liste auf Wikipedia anschaut. Nächstes Jahr ersetzt die DB auch in meiner Region Dieselzüge gegen 16 neue Batterie-Mireos für den S-Bahn Betrieb. :)

  • @two_tier_gary_rumain
    @two_tier_gary_rumain Před 26 dny

    Interesting train. And nice to see some of the local scenery. You'd need to use a polarising filter in front of your camera's lens to cut down on the reflections from the windows.

  • @simonyapp
    @simonyapp Před měsícem +6

    Thank you, Tobias, for this information, great to see Tesla making this happen or maybe even paying for it.

  • @Talon5516-tx3ih
    @Talon5516-tx3ih Před měsícem +8

    Sind sie geleast von BWegt? Oder ist es nur Zufall, dass sie genau die gleiche Farbegestaltung haben.

    • @TobiasLindh
      @TobiasLindh  Před měsícem +6

      Vielleicht wurde der vorher an BWegt verleast, oder war ursprünglich für die gedacht. Das Leasing dürfte auf jeden Fall direkt von Siemens kommen.

    • @vonBlankenburgLP
      @vonBlankenburgLP Před měsícem +4

      @@TobiasLindh Jup. Das Sitzdesign entspricht ebenfalls BWegt.

    • @mys31f70
      @mys31f70 Před měsícem

      auch die äußere Lackierung, die Fahrräder und Rollstühlen Logos sind nur auf bwegt Zügen

    • @Sammlerchen
      @Sammlerchen Před měsícem +1

      Die sind nur geliehen die kommen irgendwann wieder zurück nach Baden-Württemberg hab die beiden Fahrzeuge schon im Fahrgastbetrieb in der Ortenau gesehen

    • @mys31f70
      @mys31f70 Před měsícem

      @@Sammlerchen es ist direkt von Siemens geleast, vielleicht ist jmd hier zu lazy neu zu lackieren

  • @jamesdubben3687
    @jamesdubben3687 Před 29 dny

    Thanks, that was great to see

  • @benguthrie49
    @benguthrie49 Před měsícem

    Thanks. Seems much better than a bus

  • @vanwesthuizen7427
    @vanwesthuizen7427 Před 27 dny

    I really like the bwegt-Design fused with GIGATRAIN!

  • @klausfeith3736
    @klausfeith3736 Před měsícem +2

    Super Video. Vielen Dank für die Mühe.

  • @pinkelephants1421
    @pinkelephants1421 Před měsícem +8

    I've never understood the propensity for graffiti artists to deface other people's property, especially when it's a nice brand new public space such as this train station. It's quite a different thing if a graffiti artist/s have been given a commission/s for a specific space/s as this can be readily defined as public artworks

    • @svr5423
      @svr5423 Před 24 dny

      Those are not artists, those are vandals.
      And it's in human nature to destroy. Some people evolve past it, others will not.

  • @noiseosoutros
    @noiseosoutros Před měsícem +2

    Thank you my friend.

  • @paulstubbs7678
    @paulstubbs7678 Před měsícem +1

    Nice, However I thought they had removed that video display from the end of the platform roof at the factory station, there were some workers at it in one video, then the proceeding video's just showed the roof end as black - so surprised to see it back.
    I thought they were loosing interest in the train link, as there seemed to be fewer and fewer trains in later factory video's, and when it was there, only a handful of people got on/off.
    So a leased train, I wonder what that's costing?

  • @jooptablet1727
    @jooptablet1727 Před měsícem +1

    Giga geil!

  • @parkershane1815
    @parkershane1815 Před měsícem +5

    Thank you for this nice video, too bad the station is filled with graffiti 😢

    • @steffenoei8440
      @steffenoei8440 Před měsícem +2

      Why bad? The Giga factory has also many graffities. Elon loves it. That´s part of berlin street Culture.

    • @shazam6274
      @shazam6274 Před měsícem +1

      @@steffenoei8440 The Tesla buildings have "Street Art" not the vandals' crap

    • @steffenoei8440
      @steffenoei8440 Před měsícem

      @@shazam6274 Not all of them are crap. But in general I agree.

  • @djbowler3333
    @djbowler3333 Před měsícem +1

    F***KING AWESOME. TOO COOL.

  • @karin.mathias3985
    @karin.mathias3985 Před měsícem +4

    Vielen Dank für den Stream 👍

  • @anthoneyking6572
    @anthoneyking6572 Před měsícem +2

    Thanks Great Look at tesla New Train Loved it thanks

  • @766crew
    @766crew Před měsícem

    Wäre hir bei uns für die Bahn richtung Zirndorf ebenfalls ein Segen, weg von der Diesellok für Kurzstrecken 🙂

  • @ghebhumsa5347
    @ghebhumsa5347 Před 2 dny

    We do have electric trains running already ?

  • @parsnips800
    @parsnips800 Před měsícem +1

    Great video. Thanks for your efforts. Do Tesla bave plans to move newly built cars from Giga Berlin by rail in the future? Quite a large empty space by the trailer park for some additional train sidings.

    • @TobiasLindh
      @TobiasLindh  Před měsícem +1

      A rail yard is planned in the area east of the cell production building.

    • @eyeswidemedia
      @eyeswidemedia Před dnem

      ​@TobiasLindh I've looked through a lot of articles on different sites, but I haven't seen the speed listed. I've seen the passenger capacity, and the fact that it holds bicycles, etc., but I haven't seen anything listed about how fast it goes. I know it's only a short distance it travels... 3, or maybe 4 miles, but it's strange that speed hasn't been divulged, unless I just missed it.

    • @TobiasLindh
      @TobiasLindh  Před dnem +1

      @@eyeswidemedia Max speed is 160 km/h
      www.mobility.siemens.com/global/de/portfolio/fahrzeuge/commuter-und-regionalzuege/mireo/mireo-plus-b.html

    • @eyeswidemedia
      @eyeswidemedia Před dnem

      @@TobiasLindh Awesome! That was fast! Lol. Much appreciated!

  • @anthonycain6643
    @anthonycain6643 Před měsícem +5

    Well done Tesla

    • @carholic-sz3qv
      @carholic-sz3qv Před 27 dny +3

      correction: well done Siemens Mobility GmBH lol!!!! those trains have been running in germany and Austria for over a year now.

  • @hypernewlapse
    @hypernewlapse Před měsícem +1

    Why does it have a Baden Wurrtemberg livery?

    • @Sammlerchen
      @Sammlerchen Před měsícem +1

      Because they are leased from Baden-Württemberg probaly until they have they own ones and then they go back to Baden-Württemberg

  • @euverado4711
    @euverado4711 Před měsícem

    Die Akkus in den Zügen sind LTO Lithium-Titan-Oxyd Akkus !

  • @jozsefterdik9049
    @jozsefterdik9049 Před měsícem +1

    Sehr sehr danke Tobias und ich warte Bauarbeit videos. Schönen Tag und schönes woche. Tschüss

  • @educ9283
    @educ9283 Před 25 dny

    Danke Schon. Ist es von einem öffentlichen oder privaten Unternehmen wie der DB?

    • @TobiasLindh
      @TobiasLindh  Před 24 dny +1

      Der Zug wird im Auftrag von Tesla von der NEB (Niederbarnimer Eisenbahn) betrieben.

  • @LawpickingLocksmith
    @LawpickingLocksmith Před měsícem +24

    The "stinktrain" is gone, hopefully forever.

    • @carholic-sz3qv
      @carholic-sz3qv Před 27 dny +1

      lol!!!!! unfortunately its not "stinktrain" and its not gone, its still does more job than any electric ones! in fact the largest and heaviest trains in the world are diesel moving millions of tons of iron ore in Mauritania and Australia from desertic areas to the coasts.

    • @LawpickingLocksmith
      @LawpickingLocksmith Před 26 dny

      @@carholic-sz3qv Cost always wins, Adani coal mine runs on a 1m gauge.

  • @robertn2951
    @robertn2951 Před měsícem +9

    So silent! Away with the diesel!

    • @carholic-sz3qv
      @carholic-sz3qv Před 27 dny +1

      electric trains have been in germany for decades lol!!!!! the high speed trains litteraly going 200mph no batteries can power those, also the freight hauls much more loads with diesel locomotives all around Germany on all tracks.

  • @990Hyper
    @990Hyper Před měsícem +1

    what's the point of running on batteries ? 99% ofthe time you are only carrying around unuseful weight since there is already a high voltage line above it??

    • @stephanweinberger
      @stephanweinberger Před 29 dny

      Weight doesn't really matter on train tracks.
      And in many cases a battery train is also much cheaper than building overhead wires everywhere; for the extra cost you only get about 1km of electrification.

    • @kannantm2731
      @kannantm2731 Před 2 dny

      train situation is different when it comes to friction as compared to trucks with wheels on asphalt. Trains do provide a better numbers to weight ratio when it comes to movement of goods. we have to just hope airlines are not allowed to takeover trains and end up providing helicopters as practical alternatives, which is a yes for a richman living in the mountains or a yaught.

  • @HeikoElectric
    @HeikoElectric Před měsícem +1

    8:37 müsste er eigentlich schon die ganze Zeit im Akkubetrieb fahren, die Stromabnehmer sind in Erkner ja schon vor Abfahrt runter gefahren worden.

    • @HenryLoenwind
      @HenryLoenwind Před měsícem +2

      Das kann auch die Wende gewesen sein. Das sind ja keine Zweirichtungsabnehmer da drauf.

  • @cdnsk12
    @cdnsk12 Před 5 dny

    I see the are carbon contact rods powering this Tesla Giga Train. I thot it was Battery Powered? Do they use the typical small batteries for charge storage?

    • @TobiasLindh
      @TobiasLindh  Před 4 dny

      It is battery powered, but it can also run on electrified lines and charge the batteries that way, as you can see in the video and read in the video description.

  • @batchint
    @batchint Před měsícem

    what happens to regeneration

  • @pinkelephants1421
    @pinkelephants1421 Před měsícem

    Apart from Giga Berlin, how many other train stations does this train serve please?

  • @chillfluencer
    @chillfluencer Před 26 dny

    Why battery when it's constantly connected like a tram?

    • @trs4u
      @trs4u Před 25 dny +1

      The pantograph drops at 4:10 and then there's no overhead cable at 16:50 I'm guessing overhead power has capacity for boosting a train away from stations, so there's plenty of spare capacity for battery charging while train is not accelerating hard? There might be a significant saving in laying only passive track?

  • @SirHackaL0t.
    @SirHackaL0t. Před měsícem

    I’m surprised that they didn’t put overhead cables on the tesla extension.

    • @TobiasLindh
      @TobiasLindh  Před měsícem +2

      That line will be moved to the east when the railyard is getting built. The new line will have overhead cables. So it just doesn't make sense to install overhead lines on this line.

    • @SirHackaL0t.
      @SirHackaL0t. Před měsícem

      @@TobiasLindh Ah! Gtk. 👍

  • @anandapriyadarshan
    @anandapriyadarshan Před 2 dny

    is this made by tesla?

  • @2nd3rd1st
    @2nd3rd1st Před měsícem +1

    So I take it Tesla leased this train and didn't buy it, given the ever-changing conditions at the factory site?

    • @3tronicum
      @3tronicum Před měsícem +4

      No. They contracted the service. Pretty normal as it’s complex to run rail services in Germany

    • @TobiasLindh
      @TobiasLindh  Před měsícem +2

      Siemens has their own leasing program, and as far as I know it's the fastest way to get such a train.
      NEB is operating the train for Tesla. I don't know if the train is leased by NEB or Tesla though.

  • @ingo_8628
    @ingo_8628 Před měsícem +4

    Solche Züge werden auch auf der Ahrtalbahn gebraucht, statt da Oberleitung zu installieren, aber natürlich auch auf vielen anderen Strecken.

    • @julianreverse
      @julianreverse Před měsícem +7

      Schwachsinn.

    • @Mr21December2012
      @Mr21December2012 Před měsícem +1

      @@julianreverse was genau ist daran Schwachsinn? Auf wenig befahrenden Nebenstrecken ist das oft Sinnvoll.

    • @nicolasblume1046
      @nicolasblume1046 Před měsícem +4

      Die Ahrtalbahn ist aber gut ausgelastet, und der Takt wird zukünftig auf einen 20 Minutentakt verdichtet.
      Schon ab einem 30 Minutentakt lohnt sich eine Oberleitung fast immer
      ​@@Mr21December2012

    • @shazam6274
      @shazam6274 Před měsícem

      @@julianreverse Thank you! I have finally learned to correct word in German I have been looking for.

    • @frankbussinger5237
      @frankbussinger5237 Před měsícem +3

      Oberleitung ist das Beste was Es Giebt .Bei uns in Der Schweiz ist Alles Elecktrisiert .😂

  • @sicher-2323
    @sicher-2323 Před měsícem +1

    👍👍👍👍👍👍

  • @bfelten1
    @bfelten1 Před měsícem +1

    Absolutely wonderful! Thank you, Tobias.
    Is the ride free of charge for everyone?
    When Tesla reaches a plateau for car and truck sales in a few years, maybe they should start planning for a Tesla Cybertrain? 😄

    • @AlbrechtKoehler
      @AlbrechtKoehler Před měsícem +3

      Yes. It's free of charge for everyone.

    • @bfelten1
      @bfelten1 Před měsícem +2

      @@AlbrechtKoehler
      Amazing.
      Thank you, Albrecht.

  • @sinisastrosar3493
    @sinisastrosar3493 Před měsícem

    Is this made by Tesla fastory or someone else?

  • @aron68on_etoro95
    @aron68on_etoro95 Před měsícem

    Why is this train battery-electric under wire?

    • @dezz00002
      @dezz00002 Před měsícem +1

      No wire towards the factory. As of yet, at least.

    • @stephanweinberger
      @stephanweinberger Před 29 dny +2

      it recharges on electrified sections, to run on the non-electrified spur to the factory.

    • @aron68on_etoro95
      @aron68on_etoro95 Před 29 dny

      @@stephanweinberger I see, thanks!

  • @T-BwBerlinKarlshorst-
    @T-BwBerlinKarlshorst- Před měsícem

    Das richtige technische Lösung, welche auch durchaus auch von Eberswalde->Frankfurt(O) von Frankfurt(O)-> Königs Wusterhausen, von Brandenburg-> Rahtenow-> (Neustadt Dosse), Rahtenow-> Stendal Stammbahn) aber auch zur Reaktivierung von Königs Wusterhausen-> Zossen & Zossen-Jüterbog, Eberswalde-Templin-Fürstenberg &&&& zur Anwendung gebracht werden könnte.
    Um mich mal nur auf den Bereich des VBB zu beschränken.
    Selbst Lübeck-Güstrow- Neubrandenburg- Pasewalk- Stettin wären damit machbar.

    • @TobiasLindh
      @TobiasLindh  Před měsícem

      Die NEB hat einige dieser Züge bestellt. Ich weiß aber nicht wo die zum Einsatz kommen sollen.

    • @T-BwBerlinKarlshorst-
      @T-BwBerlinKarlshorst- Před měsícem

      @@TobiasLindh
      Fährt die NEB nicht voll auf Wasserstoff ab und hat deswegen mit viel Fördermitteln in Basdorf die entsprechende Infrastruktur geschaffen. Grundlage des Fördermittelantrages war doch die NEB Flotte?

    • @TobiasLindh
      @TobiasLindh  Před měsícem +1

      @@T-BwBerlinKarlshorst- Die NEB hat 31 Mireo Plus B (Batterie) bestellt und 7 Mireo Plus H (Wasserstoff). Letztere sollten auf der Heidekrautbahn um Einsatz kommen.
      Die batterieelektrischen Züge werden auf folgenden Strecken im Einsatz sein:
      RB12 Berlin Ostkreuz - Oranienburg - Templin Stadt
      RB25 Berlin Ostkreuz - Werneuchen
      RB26 Berlin-Lichtenberg - Müncheberg (bei jeder zweiten Fahrt montags bis freitags)
      RB35 Fürstenwalde (Spree) - Bad Saarow-Pieskow
      RB36 Frankfurt (Oder) - Beeskow - Königs Wusterhausen
      RB54 Rheinsberg (Mark) - Löwenberg (Mark) (- Berlin Ostkreuz)
      RB60 Eberswalde - Wriezen - Frankfurt (Oder)
      RB61 Schwedt (Oder) - Angermünde
      RB62 Angermünde - Prenzlau
      RB63 Joachimsthal - Eberswalde (- Berlin Hbf.)
      press.siemens.com/global/de/pressemitteilung/netz-ostbrandenburg-bekommt-31-batterieelektrische-zuege
      www.neb.de/aktuelles/details/die-heidekrautbahn-bekommt-wasserstoffzuege/

    • @svr5423
      @svr5423 Před 24 dny

      @@T-BwBerlinKarlshorst- Wasserstoff machts zwar bei Autos Sinn, aber bei Zügen eben so gar nicht. Ich bin froh dass nun mit Batteriezügen die letzten Lücken geschlossen werden.

  • @stebarg
    @stebarg Před měsícem

    Wozu hat der Zug Akkus? 🤔

    • @TobiasLindh
      @TobiasLindh  Před měsícem +2

      Um Strecken befahren zu können die nicht elektrifiziert sind. Also keine Oberleitungen haben. So wie das auch bei der Tesla-Strecke der Fall ist. Bisher konnten solche Strecken nur von Diesel-Zügen bedient werden.

  • @blakelivesmatter
    @blakelivesmatter Před 3 dny

    Seems kinda cramped

  • @andreandre1051
    @andreandre1051 Před měsícem

    👍👍👍

  • @T.Stolpe
    @T.Stolpe Před měsícem +1

    Komisch, dass die Türen so tief sind, war der für ein anderes Netz? Das sind ja alles neue Bahnsteige.
    Das Geräusch wenn die Türen zu gehen, ist genau so gräßlich wie bei den neuen S-Bahn Zügen von Stadler / Siemens.
    Ich glaube nicht, dass sie die Strecke elektrifizieren. jetzt wo sie den passende Zug geleast haben (NBE) .
    Der Güterbahnhof wird ja weit lange vor dem Bogen seinen Abzweig haben.

    • @julianreverse
      @julianreverse Před měsícem +3

      Sieht man ja an den Sitzbezügen, der kommt aus Baden Württemberg ... Ist also mal für Go Ahead (heute Arverio) / bwegt gefahren

    • @TobiasLindh
      @TobiasLindh  Před měsícem +8

      Die neue Strecke soll elektrifiziert werden. Die alte wird dann abgerissen. Der Zug ist ja nicht gekauft. Die Siemens Tochter "Smart Train Lease GmbH" vermietet die Quasi. Somit kann man sich dann auch flexibel auf die neue Situation einlassen und den Zug woanders einsetzten. Die batterieelektrischen Züge sind nicht ganz günstig. Alleine die Batterie kostet 1-2 Millionen Euro. Da dürfte sich bei der kurzen Strecke auf Dauer das Elektrifizieren lohnen. Zumal das ja auch für die Güterzüge sinnvoll wäre.

    • @olafd2371
      @olafd2371 Před měsícem +2

      @@TobiasLindh Wenn die Fahrzeuge noch auf offene Autotransportwaggons verladen werden sollten, dann nehme ich stark an, dass zumindest diese Verladegleise keine Oberleitung bekommen. Ich gehe aber davon aus, dass Tesla auf geschlossene Autotransportwagen setzt (ist schon jetzt in der Verladung von Giga Texas der Fall). Diese bieten mehr Schutz von Wetter, Verschmutzung und Vandalismus, und sind auch in Europa im Kommen…

    • @T.Stolpe
      @T.Stolpe Před měsícem

      @@TobiasLindh 1,2 Mill. €? Da kostet es mehr, die letzten 1.000 m mit einer Oberleitung auszustatten. wenn die Strecke verlegt wird, dann schaut es anders aus, dann lohnt es sicher gleich eine Oberleitung zu errichten.

    • @T.Stolpe
      @T.Stolpe Před měsícem

      @@julianreverse Da gibt es Bahnstrecken ?

  • @hans-jurgenkallweit2767
    @hans-jurgenkallweit2767 Před měsícem

    Er fährt mit Oberleitung. Wozu die Batterie?

    • @patrickspendrin3107
      @patrickspendrin3107 Před měsícem +7

      Weil bei Tesla keine Oberleitung mehr ist... Und zurück kann er das auch nicht mit Schwungfahrt machen ;-)

  • @UweSuendhoff
    @UweSuendhoff Před 22 dny

    Na also, geht doch!!!

    • @UweSuendhoff
      @UweSuendhoff Před 22 dny

      …warum dauert das bei anderen Linien im VBB solange???

  • @paulgar8
    @paulgar8 Před měsícem

    What size crew is used to operate the train?

  • @bahnecke
    @bahnecke Před měsícem

    Was soll denn der neue Bahnhof können ? Gleisanzahl etc. ?

    • @iboy161
      @iboy161 Před 27 dny

      Und barrierefrei ist er auch nicht!

  • @frankbussinger5237
    @frankbussinger5237 Před měsícem

    Ist der zug Ein Stadler ?

  • @sebastiansauer5569
    @sebastiansauer5569 Před měsícem +1

    Können Privatpersonen (bzw. Nicht-Teslamitarbeiter) vom Bahnhof zur Lobby laufen? Sah so aus als ob der Weg am Ende des Bahnsteiges schon hinter den Pförtnerhäuschen an die Straße ran geht!?

    • @TobiasLindh
      @TobiasLindh  Před měsícem +6

      Ja, das geht. Man kommt dort am Pförtnerhäuschen vorbei zum Parkplatz. Später soll dort eine Brücke gebaut werden.

  • @lukaszds8935
    @lukaszds8935 Před měsícem

    Dürfen diese Züge Tunnels befahren? Wegen der Batterie frage ich…

    • @TobiasLindh
      @TobiasLindh  Před měsícem +2

      Warum sollten die das nicht dürfen? Die Frage würde für mich bei Diesel-Zügen mehr Sinn machen.

    • @lukaszds8935
      @lukaszds8935 Před měsícem

      @@TobiasLindh na wegen Brandgefahr an der Batterie.. noch nie gehört was passiert wenn so ein Akku Auto in Flamen geht?

    • @julianreverse
      @julianreverse Před měsícem +1

      @@lukaszds8935 Schon mal gesehen wie so ein Verbrenner brennt? Oder eine E-Lok? 🤦‍♂🤦‍♂🤦‍♂🤦‍♂🤦‍♂🤦‍♂

    • @lukaszds8935
      @lukaszds8935 Před měsícem +1

      @@julianreverse batteriebetriebene Fahrzeuge können sehr gut brennen
      Und ja eine brennende E-Lok auch gesehen. Transformator kann sehr gut brennen. Mir geht es um die Batterie auf diesem Zug. Ach egal - du schreibst nur weil du nichts zu tun hast. Null Inhalt.

    • @julianreverse
      @julianreverse Před měsícem

      @@lukaszds8935 😂😂🤦‍♂

  • @hans-ulrichwieckhorst6121
    @hans-ulrichwieckhorst6121 Před měsícem +3

    Umweltfreundlicher geht's nicht,super😊

  • @ralfdahms1035
    @ralfdahms1035 Před měsícem

    Wünsche viele zahlenden Gäste 😂

    • @TobiasLindh
      @TobiasLindh  Před měsícem +1

      Die Nutzung des Zuges ist kostenlos.

  • @Profimaulwurf48
    @Profimaulwurf48 Před měsícem +1

    Die Stromabnehmer sind seit dem Bahnhof unten. Das heißt, es wird während der Wendezeit am Bahnhof geladen. Und dann geht es per Akku vom Bahnhof nach Grünheide und wieder zurück
    Es ist die Frage, ob Grünheide noch ein Stück Oberleitung bekommt, wenn der Rangierbahnhof gebaut wird, oder ob die die Strecke dann komplett elektrifizieren, was eigentlich logischer wäre.

    • @TobiasLindh
      @TobiasLindh  Před měsícem +6

      Die geplante neue Strecke soll dann auch elektrifiziert werden.
      Der ist noch mit Oberleitung in den Bahnhof eingefahren. Ich sehe jetzt auch gerade, dass die Stromabnehmer schon bei 4:15 einfahren. Wahrscheinlich war er dann schon voll geladen. Der fährt ja nicht lange ohne Oberleitung.

    • @martinstock
      @martinstock Před měsícem +1

      Der Rangierbahnhof wird ganz sicher elektrifiziert. Sonst macht das überhaupt keinen Sinn.
      Es wird sicher auch Änderungen bei der Anbindung des Haltepunktes "Fangschleuse Tesla Süd" geben.
      Grünheide (der Ort) selbst hat gar keinen wirklich eigenen Bahnhof.
      Der Bahnhof Fangschleuse der Grünheide dient wird ja zu "Fangschleuse Tesla Nord" umgezogen (wobei der genaue Name wohl noch nicht feststeht).

  • @richmargin6082
    @richmargin6082 Před měsícem +1

    👍👍👍🇺🇸🇺🇸🇺🇸

  • @2nd3rd1st
    @2nd3rd1st Před měsícem

    What has Tesla done with the battery factory building since they moved all cell production to the US following Biden's Inflation Reduction Act? Is it being used for anything else in the meantime or has it been left vacant?

    • @TobiasLindh
      @TobiasLindh  Před měsícem +8

      They produce parts of cells and ship them to the US to get assembled there. So no, they didn't move all the cell production to the US. They just need assemble the cells in the US to count for the inflation reduction act.

  • @istiles1
    @istiles1 Před měsícem

    Great perspective on the new train, Tobias. Thank you. Do you happen to know what the capacity is for the train? [200/300/400 commuters?]

    • @upsill
      @upsill Před měsícem

      About 3x500 so 1500

    • @TobiasLindh
      @TobiasLindh  Před měsícem

      According to Wikipedia NEB ordered a configuration with 128 seats.

  • @christian-agk-dts-google-map

    Und für Rollstuhl Fahrer gibt es kein Fahrstuhl wer baut sowas ihre MDA DTS Team Thüringen findet das nicht gut Handicap für Defensive Menschen.
    Da haben die Architekten den Bock damit geschossen.

  • @goldgold2712
    @goldgold2712 Před 2 dny

    WRONG INFO! ALL DUTCH TRAINS ARE ELECTRIC SINCE OVER 30 YEARS AGO

  • @dietmarwolf79
    @dietmarwolf79 Před měsícem +2

    What I hate most, is this terrible and offending graffiti everywhere in Germany !!! 😱😱😱

    • @dezz00002
      @dezz00002 Před měsícem +2

      Bare walls would look like better?

    • @two_tier_gary_rumain
      @two_tier_gary_rumain Před 26 dny +1

      I noticed that too. The Western disease spreads everywhere.

    • @svr5423
      @svr5423 Před 24 dny +1

      @@dezz00002 yes, they would.
      Germany is unable to control crime. Many people are without jobs and destroy property or commit vandalism for fun.

  • @travelwithtesla
    @travelwithtesla Před měsícem

    All the railfans out there: 💦💦

  • @johntheux9238
    @johntheux9238 Před měsícem +3

    Most trains are probably going to run on batteries too. Powerlines are ugly.

    • @realdavidpain
      @realdavidpain Před měsícem +2

      But much more efficient - especially if you think about the lifecycles and possible repairs/recycling... :///

    • @johntheux9238
      @johntheux9238 Před měsícem

      @@realdavidpain You need very high cycle life and fast charging that's for sure.

    • @Subway1306
      @Subway1306 Před měsícem +3

      Probably not, especially high speed services (~200 mph) and heavy freight trains with long distances are not possible with battery electric trains. Powerlines are more cost effective too if the tracks are frequently used. Ugly is no argument when building public infrastructure, it just has to work and be durable.
      The use case of BE trains in germany only exists because planning procedures for power lines (or for any other project tbh) are long and cost intensive, for the 15 years they need to plan and build a powerline, battery electric trains can be used as a transition.

    • @johntheux9238
      @johntheux9238 Před měsícem

      @@Subway1306 It will shine when most of your energy is used to accelerate or climb steep slopes since you can apply regenerative braking.
      Will work just fine on anything that doesn't involve high drag losses such as high speed rail but should work fine for freight trains.

    • @Subway1306
      @Subway1306 Před měsícem +4

      @johntheux9238 Well, electric trains have regenerative braking already for a very long time. They are able to put the power back into the grid. This is no argument for a battery but all electric vehicles, no matter where the power is from.

  • @nanaimoshoerepair
    @nanaimoshoerepair Před měsícem

    What if a Dynamo was attached to this train? It would be Epic. Not only powering itself, it would create unlimited renewable energy to the grid.

    • @dezz00002
      @dezz00002 Před měsícem

      You're just kidding, right? Power generation in such a way would exert a braking force all the time. As well as less energy could be generated than it was needed to maintain speed. However, there is a technique called regenerative braking when usually the electric motor itself used as a braking mechanism while generating power as well (so they are used as a generator this way). But of course it is used only when the train or vehicle needs to brake.

  • @luisnide
    @luisnide Před měsícem

    sie mussen rauchen nicht, kein gut

  • @richardashworth400
    @richardashworth400 Před měsícem +1

    1000% the dumbest idea i've seen in a long while. That's enough internet for me today

    • @TobiasLindh
      @TobiasLindh  Před měsícem +2

      Why?

    • @dezz00002
      @dezz00002 Před měsícem

      Did you know that there was no powerline built in that area and it would not have been possible to build it in such a short time? So then it was really your comment that was dumb...

    • @richardashworth400
      @richardashworth400 Před měsícem

      @@dezz00002 you know what's really dumb? The amount of times your mom has faked a jellyfish sting to get me to piss on her.
      Scroll on if you don't like my comment.