Liebherr - Assembly/disassembly of the luffable lattice jib on the LTM 1750-9.1

Sdílet
Vložit
  • čas přidán 25. 06. 2024
  • ​The training film shows the procedure of pulling the upper luffing pulley block to the front and back again during the luffing jib assembly/disassembly on the LTM 1750-9.1. This procedure reduces the loading of the hoist rope of winch 1 considerably and extends therefore the lifetime of the rope.
  • Věda a technologie

Komentáře • 8

  • @craneoperator8021
    @craneoperator8021 Před 3 lety

    It's really nice filme thanks

  • @ghulabkhan762
    @ghulabkhan762 Před 2 lety +1

    Very interesting to yourself

  • @maycongtrinh_constructionm8040

    Quá tuyêyj

  • @joshhernandez5069
    @joshhernandez5069 Před 3 lety +2

    I don't get it, whats the point of doing all this??

    • @DeepPocketsEnt
      @DeepPocketsEnt Před 2 lety

      @Alex Atreides Slag wire? What's that? Do you mean slack wire?

    • @trestles126
      @trestles126 Před 9 měsíci

      you grenade winch 1 and or core of wire your using your bail to raise strut to height we’re the pressure isn’t as bad. or you can use the pressures of winch 1 and go slow keeping below 150bar i believe

  • @zredrocx
    @zredrocx Před 2 lety +1

    Hopefully this is only for the 1750 ... and not the other LTMs... whooops

  • @user-df8bw3fs5g
    @user-df8bw3fs5g Před 3 lety

    Libherr 👍👍👍👍