If it takes us 10 years to build just one bullet train network, when do we expect to connect the entire country?? by 2100?🤨 Meanwhile, China built a 50,000 km network in just 16 years! 🥵🔥
@@ziggstopper6728 Bloody stop comparing a dictator/Communist China with Bharat in everything. China did this China did that WTF ? China doesn't have any antinational, greedy opposition consisting of PAPPU and his CHINDI Alliance like we have who are 100% trying to break our country by any means necessary so that the can come back to power and start looting and selling our Bharat once again. BTW who told you that the bullet train will connect the entire country ?? So what China built a 50,000 km network ?? Is it earning any profit as per the massive investment?? NO I DON'T THINK SO.
People think making bullet train is halwa that they are asking to hurry every time. The entire technology is unheard of in India. We have to learn A to Z of this technology first which naturally takes time. Once Indian enginners get accustomed to it, it is easy to copy paste on pan India scale. As was the case in Vande Bharat, Delhi Metro, etc. Also the scope of error is not even 0.01% at such high speeds(350%), so work has to be extra meticulous.
Vande bharat? Why are you even comparing development of a modified EMU rolling stock with construction of a HSR route? Any way most important part in construction of any viaduct, bridge, tunnel, track slab or other operation systems is making detail specifications and layouts which is being done by Japan east railway. L&T, Afcons and responsible companies for construction just have to follow those specifications. We can ramp up the production just by putting more manpower, machineries and equipment. All these construction companies are constructing viaducts, bridges and tunnels for decades now.
Sorry JAYKA, because of virus Uddhav Thackeray Mumbai portion was delayed. Thanks to Devendra fadnavis and Eknath Shinde work has restarted and fast progress.
Idk how old you guys are but you talk like children. There was a massive land dispute over the BKC station due to the IFSC. Fadnavis was involved too. I highly recommend you go over the whole thing. An interim solution was reached where the IFSC would be built over the station, but by then the IFSC had already been moved to GIFT city, dealing a massive blow to Mumbai. This all blew over in 2020. Any further delays were due to covid, as a lot of new technologies were required from foreign states. Other than that, land acquisition in and around Mumbai is extremely difficult due its highly developed nature - this is a well known fact. Quite frankly, this project has very little to do with the state government other than the BKC station, which was MMRDA land (and I'm guessing you don't know, MMRDA falls under jurisdiction of the state, which is why the Thackareys want only BMC to govern Mumbai, since majority of their power lies within the BMC.)
Guys BJP have promised three more bullet train corridor in its monifesto...In North, south and East parts of India .... in Southern India it's Chennai-Mysore HSR corridor ..Its proper alignment was leaked on Twitter few months ago... in Northern India they mean by Ahmedabad-Delhi HSR corridor Cuz it will make more sense than building Delhi-Amritsar HSR corridor..... but it's not confirmed what do they mean by Eastern side of India as it is more underdeveloped and overlooked
@@techystt delhi to kolkata is 1450 km and delhi to mumbai is 1350 by bullet train DPRs ...I think they will build something in assam (State gov is BJP) or odissa(railway minister is from odisaa)
If it takes us 10 years to build just one bullet train network, when do we expect to connect the entire country?? by 2100?🤨 Meanwhile, China built a 50,000 km network in just 16 years! 🤡🥵
Guys don't sit in overconfidence. **Ghar pe baithe mat raho.** Go out and vote for Development. **Go out and vote for BJP/MODI.** Also convince your friends and family.
Yes this is a part of Delhi Mumbai high speed rail. Later on, Ahmedabad will be extended to Delhi, via Jaipur, Ajmer, Udaipur and Gurugram and Gandhinagar also
@@anonymous-gz4ru Abe modi robot nahi ki uski government new versions ki tarah baar² aati rahegi. Iss baar to bahumat hi nahi mila. Aur vo budha ho gya, ye last baar pm hoga 2029 tak.
The above works are Ahmedabad Mumbai express way. The upper surface Train shall run,up and down. The lower one for Vehicles movement from Mumbai Ahmedabad. These things were heard happening in South Korea and Japan earlier!!!!!!!.
Surat bilimora train chalana hi sabse perfect kam hoga ,, fir dhire dhire both directions mein expansion karna chahiye ,,ab time aa gaya Thane se Pune bullet train expansion ko manjoori karna chahiye ,,, Experience bhi milega human behaviour bhi milega aur bullet train vistar bhi hota jayega
The infrastructure should be better than China or USA to know what India can do wonders. India should be a platfrom for other countries to create such infra.
Kerala small state + many young people's go outside of Kerala for work ! And those poor migrants who come for low job like housekeeping farming labour from eastern india ! Does not make Kerala deserve costly Japanese shinsanken for now ! When India will launch its affordable I house bullet train it will probably come first in Kerala cuz yes Kerala people's know how to treat infra and all and they actually had good record with vandhe Bharat seat occupancy but its made in india ! So cost and all factor in hand of Indian govt. More easier ! That's why even Kerala get more vandhe Bharat trains !
Because uddhav thackray opposed this project for 2.5 years ....He made land acquisition difficult in maharashtra...He have a hobby of opposing Central gov projects ...after bullet train now he is opposing Vadhvan port construction...
As of now rhe cost overrun is at 1.5x of original budget .. But accounting general inflation and the delay hurricanes in arabian sea causes it will be 2x Without a doubt ....At At 2.2 lakh crore .....currently cost is 1.8 lakh crore
@@Anonymous-dy2zu Bro he is more dangerous than you think ....This all started with the murder of govind pansare in 2015..the murder made his book 'Who was shivaji?' more famous ..this book made shivaji mahraj a secular leader saying that he had appointed many muslims in various posts even his bodyguards ..some of them are true but many of its statements are based on the findings of left wing or liberal historeans...whom didn't liked shivaji maharaj being the icon of hindutva.....AND UDDHAV THACKRAY IS USING THIS BOOK'S SHIVAJI MAHARAJ TO GATHER MUSLIM VOTES AND USING BALASAHEB'S FACE TO GATHER HINDU VOTES...This MF is successful in spreading fake news about central gov projects in maha ...and the maharashtra BJP leaders are fu*king morons except few🤦♂
Is speed se to china ko kabhi beat nahi kar payenge speed chahiye kaam me otherwise ye politicians ke chakkar me development project aise hi bich me latke rahenge
@@rohityo8729average hamesa 100km kam hoti hai bullet train me. 1 train will have average speed of 250km complete journey in 2h7min. Skipping 8 station 2nd train which stop at every station will have speed of 170kmph complete journey on 3hr.
If it takes us 10 years to build just one bullet train network, then when do we expect to connect the entire country?? by 2100?🤨 Meanwhile, China built a 50,000 km network in just 16 years! This stark difference in progress highlights the urgent need for us to ramp up our infrastructure efforts and adopt more efficient practices to keep pace with global advancements In which the present government also seems to have failed.
You r wrong brother, hame ek first vande Bharat banen ko bahut time laga tha and musibat bhi ayi thi but abhi ek sath 5 se 10 vande bhart ka inogration hota hy , so se ye first bullet train hy hamre log first time ka4 rahe hy bullet train pe to thoda vakt lagega and ek sab hogya to jaldi Banega and dusri bat inta late hota bhi nhi but Maharashtra politics and land issue tha , so thoda desh kelye positive bhi socha Karo apna hi desh hy
Delhi Mumbai expressway unfinished, RRTS unfinished, Bullet train not start yet, USBRL rail link unfinished, coastal road Mumbai unfinished, Aqua line mumbai metro unfinished, WDFC unfinished, Vander Bharat Sleeper not launch yet, Dwarka expressway unfinished, and there are many such schemes which not completed yet or unfinished. Modi government matlab adhure kaam ki puri garantee 🤦🏻♂️✅😤
@@ziggstopper6728Calm down your tits, spammer. Kisi project ko pura hone me time lagta hai ki nahi ? koi jaadu karke thode ek jhatke me khatam kar denge. Vaise bhi uddhav govt & cvid ki wajah se 3-4 saal ka delay ho gaya hai & currently acche speed se hi chal raha hai project.
It’s possible in China not in India… as they have an authoritarian regime and the civilians have to obey orders of the government, they can’t protest. India lags here since land acquisition takes lot of time because of differences.
Brother, ye india hy china nhi yaha ek kam karne jao to 100 musibat ati hy road banne jao to log bolte ped kyu cute kye and road nhi Bane to bolte sarkar kya kar Rahi hy koi kam ek din me to nhi hota or isa bhi nhi hy ki kuch kam complete nhi hua , 2014 me 5 cities me metro thi abhi nearly 30 cities ye nahi dikha , railway electrification 2014 me 65 persent thi ab 95 persent hy , channai , banglore highway , and many more hy har Kam hoga bas vakt lagega because yaha democracy hy log bolte hy protest karte hy
@@DevilBg-cv2hx bhai ye mars mai rehte thee kya? Inko covid ke bare mai pata nahi hai? Covid ke vajah se speed kaam ho gaya hai work ka pata nahi hai kya?
@@Hello72136 slow hone me or delay hone me fark h 2023 December completion date tha tab Tak lowest to lowest 60-65 percent to hona hi hona chahiye tha but hua kitna 38-39 percent .???? Bilkul adha . or shameless prime minister bolta hai bullet train is nearing completion. Agar nearing completion hai to 6 mhine pehle se percentage share karna band kyu kiya ???? Kisko bewakoof bna rha hai
@@AJAYKUMARSingh-hx7wy construction started in early 😂2021. China took 11 years for its bullet train too. Indonesia 7 years for 150km now tell me india will complete in 2028. 11 years for 500km is slow that too COVID delayed it
If congress comes to powee they will stop all infra projects started by bjp and nda best example is that they stopped the progress of golden quadilater which connect 4 metropolitian cities Congress never allow other parties to do development
go india love from south korea
😂😂 I saw u on 3 channels y u are interested in our country progress I'm just curious to know
@@SriKalyani-iy4xm It’s a newly created fake account, don’t bother.
Making fake accounts to get fake validation from other countries. How pitiful of some Indians.
Lol he is bot fake @@SriKalyani-iy4xm
@@zojozojo-ox6wj he is not fake
As of 21 May:
170km+ Viaduct ✅
300km+ Pier work ✅
If it takes us 10 years to build just one bullet train network, when do we expect to connect the entire country?? by 2100?🤨 Meanwhile, China built a 50,000 km network in just 16 years! 🥵🔥
@@ziggstopper6728 Not ten yrs it's construction was started in 2021
@@ziggstopper6728 Bloody stop comparing a dictator/Communist China with Bharat in everything. China did this China did that WTF ? China doesn't have any antinational, greedy opposition consisting of PAPPU and his CHINDI Alliance like we have who are 100% trying to break our country by any means necessary so that the can come back to power and start looting and selling our Bharat once again. BTW who told you that the bullet train will connect the entire country ?? So what China built a 50,000 km network ?? Is it earning any profit as per the massive investment?? NO I DON'T THINK SO.
@@ziggstopper6728it takes time at starting just like metro it was very slow but now we have 1000km metro and many under construction
@@sarojpradhan1250 ignore the habitual bait commentators. let them comment what they want. kuch farak nahi padta kisi ko waise bhi unke comments se.
if you have ever felt stupid in life, just know that there are people in india who think we don't need a bullet train and want this project to fail :)
ther are all from specific community
iykyk
People think making bullet train is halwa that they are asking to hurry every time. The entire technology is unheard of in India. We have to learn A to Z of this technology first which naturally takes time. Once Indian enginners get accustomed to it, it is easy to copy paste on pan India scale. As was the case in Vande Bharat, Delhi Metro, etc. Also the scope of error is not even 0.01% at such high speeds(350%), so work has to be extra meticulous.
Vande bharat? Why are you even comparing development of a modified EMU rolling stock with construction of a HSR route? Any way most important part in construction of any viaduct, bridge, tunnel, track slab or other operation systems is making detail specifications and layouts which is being done by Japan east railway. L&T, Afcons and responsible companies for construction just have to follow those specifications. We can ramp up the production just by putting more manpower, machineries and equipment. All these construction companies are constructing viaducts, bridges and tunnels for decades now.
Finally after 2 long months 🎉🎉🎉🎉🎉🎉🎉
Sorry JAYKA, because of virus Uddhav Thackeray Mumbai portion was delayed. Thanks to Devendra fadnavis and Eknath Shinde work has restarted and fast progress.
*JAICA
😂😂@@commieSlayer69 *** jica
Now again it will be delayed. Coz congress is back to power in MHA
Idk how old you guys are but you talk like children. There was a massive land dispute over the BKC station due to the IFSC. Fadnavis was involved too. I highly recommend you go over the whole thing. An interim solution was reached where the IFSC would be built over the station, but by then the IFSC had already been moved to GIFT city, dealing a massive blow to Mumbai. This all blew over in 2020. Any further delays were due to covid, as a lot of new technologies were required from foreign states. Other than that, land acquisition in and around Mumbai is extremely difficult due its highly developed nature - this is a well known fact.
Quite frankly, this project has very little to do with the state government other than the BKC station, which was MMRDA land (and I'm guessing you don't know, MMRDA falls under jurisdiction of the state, which is why the Thackareys want only BMC to govern Mumbai, since majority of their power lies within the BMC.)
@@fayazdm8857 Do you even know how lok sabha works lol
3yrs lost in Maharashtra because of MVA govt. They stalled work and development vote always wisely and Choose BJP
Guys BJP have promised three more bullet train corridor in its monifesto...In North, south and East parts of India .... in Southern India it's Chennai-Mysore HSR corridor ..Its proper alignment was leaked on Twitter few months ago... in Northern India they mean by Ahmedabad-Delhi HSR corridor Cuz it will make more sense than building Delhi-Amritsar HSR corridor..... but it's not confirmed what do they mean by Eastern side of India as it is more underdeveloped and overlooked
East is delhi to kolkata.
@@techystt delhi to kolkata is 1450 km and delhi to mumbai is 1350 by bullet train DPRs ...I think they will build something in assam (State gov is BJP) or odissa(railway minister is from odisaa)
@@its_not_the_Ishu HSR in assam ??? technically highly improbable thru the narrow corridor . speeds might be drastically reduced .
@@its_not_the_IshuNo way in Assam. The GDP per capita of the city should be sufficiently high for HSR to be made there.
@@Adi-oc2hdI think they've planned till Guwahati but it'll probably be constructed the latest.
4:19 Delhi Mumbai expressway 👽🥵
If it takes us 10 years to build just one bullet train network, when do we expect to connect the entire country?? by 2100?🤨 Meanwhile, China built a 50,000 km network in just 16 years! 🤡🥵
Seeing you everywhere on infra videos.
@@ziggstopper6728 let them build 5 lac km network . who the hell cares ???
@@prashantmishra9985 Because I am everywhere 👽
@@dholakpurkirakhi434 how old are you???
We dont deserve this , we only deserve caste based mp,
Video should be longer and more detailed ...
Video lamba karne se kya hoga, kam jyada hona chahiye 😅
Because there is no as such big progress 😂😅
@@huntergamer1284 How can there be big progress in a short span of time 🤷🏻♂️
Atleast there is transparency...koi aur govt hoti toh yeh kabhi nai Banta...
Kyu bhai khudai dekhna hai kya tumko
Jaldi jaldi kaam karo , aadmi kam pade to mujhe bula lo par kam speed main hona chahiye 😅
Love from Gujarat ❤❤😊good progress
Hell yeah 🎉 finally new video is here 🎉
Amazing progress in Gujarat state
Good progress in Maharashtra too
Guys don't sit in overconfidence.
**Ghar pe baithe mat raho.**
Go out and vote for Development.
**Go out and vote for BJP/MODI.**
Also convince your friends and family.
Finally video is coming❤
thankyou for the update.
Fantastic video from UK thank you.🙏
Good to see progress. New India under Modi!! Vikaas purush of India! Modi 2024!!! Jai Hind.
BHARAT MATA KI JAY
please upload this update video on regular basis...atleast once a month..
They upload it but you will see only if you have eyes😂😂😂😂
@@rajshribhakare1743 they delayed this by skipping April rest upload every month
Wonderful 😊
Great
Developed India @ 2047 ❤❤
Nice
Please extend this line till Delhi / Chandigarh. Also develop line from Diva to Nagpur. Keep it up the good work. Hats off to All team.
Yes this is a part of Delhi Mumbai high speed rail. Later on, Ahmedabad will be extended to Delhi, via Jaipur, Ajmer, Udaipur and Gurugram and Gandhinagar also
in modi 3.0 and 4.0 and 5.0 then more in yogi 1.0 and so on
@@anonymous-gz4ru Abe modi robot nahi ki uski government new versions ki tarah baar² aati rahegi.
Iss baar to bahumat hi nahi mila.
Aur vo budha ho gya, ye last baar pm hoga 2029 tak.
Jai BHARAT 🇮🇳
The above works are Ahmedabad Mumbai express way.
The upper surface Train shall run,up and down.
The lower one for Vehicles movement from Mumbai Ahmedabad.
These things were heard happening in South Korea and Japan earlier!!!!!!!.
Project will complete in 2027 nd will be inaugurate before 2029 general elections.
First 🥇 🥇🥇🏆
its here
It looks like three more years of work are needed before the train is operational at the earliest.
finally
Surat bilimora train chalana hi sabse perfect kam hoga ,, fir dhire dhire both directions mein expansion karna chahiye ,,ab time aa gaya Thane se Pune bullet train expansion ko manjoori karna chahiye ,,,
Experience bhi milega human behaviour bhi milega aur bullet train vistar bhi hota jayega
❤
💖
If this completes before 2029 it will be awesome
Awesome progress. Hope it starts in 2025 end at least
Rahul Gandhi will inaugurate
@@_I_n_d_r_a_786 bro, you are in wrong Universe.
I think some parts might get inaugurated in end of 2025 or early 2026
@@_I_n_d_r_a_786 Cocaine kha ke comment likh Raha hai kiya?
The infrastructure should be better than China or USA to know what India can do wonders. India should be a platfrom for other countries to create such infra.
funny!!!!!!!!!!!!!!!joke
Let's build ourselves for 15-20 years.
Until then comparing to China and USA is hilarious 😂
USA does not have HSR and they don’t even want to build. So technically we’re ahead of US lol
Guys please vote so that this development happens across india
Could have been much better if we have completed land acquisition way earlier especially in Maharashtra
whole section has to be completed before 2029 election
🇮🇳🇮🇳🙏
Aur gati badhao🎉🎉❤
More videos ❤
Kab chalu hogi
Please finish the construction of patan bus port
Location: bus port,patan, gujrat
❤
Nhsrcl ❤u odisha 🙏🚩🇮🇳
😂😂😂 jun 4 ko video dalte.
Aapke vichar bohot badhiya hai😅😅😅😅
Development 🫡NDA🤘
Where's the video of June?
Still 11 days remaining
Japa India collaboration not Korea
Who said korea?
Srinagar-Delhi High Speed Rail is also needed.
Till katra is possible, normal train to abhi Tak nehi pauncha bullet train dur ki baat 😢😢
Sorry , But How are drone shots an update ??
It's just a reference for us, but the whole footage goes to higher officials and ministers for detailed discussion or troubleshooting.
Bhai Jo dikhta hai wahi bikta hai, nehi to phir proof mangte phiroge
Bullet train for Kerala?
Cancelled ho gaya hai
Kerala small state + many young people's go outside of Kerala for work ! And those poor migrants who come for low job like housekeeping farming labour from eastern india ! Does not make Kerala deserve costly Japanese shinsanken for now ! When India will launch its affordable I house bullet train it will probably come first in Kerala cuz yes Kerala people's know how to treat infra and all and they actually had good record with vandhe Bharat seat occupancy but its made in india ! So cost and all factor in hand of Indian govt. More easier ! That's why even Kerala get more vandhe Bharat trains !
Lmao communists won’t allow
Election ke wajah se kaam slow ho gaya hai 😡
Matlab kuch bhi 🤣
What is the cost overrun here? I heard some place its already 2.4x the original allocation
Because uddhav thackray opposed this project for 2.5 years ....He made land acquisition difficult in maharashtra...He have a hobby of opposing Central gov projects ...after bullet train now he is opposing Vadhvan port construction...
He also opposed ratnagiri oil refinery, Aarey Metro car depot and 10000 MW jaitapur nucleur power plant Citing baseles environmental concerns🤦♂️🤦♂️
As of now rhe cost overrun is at 1.5x of original budget .. But accounting general inflation and the delay hurricanes in arabian sea causes it will be 2x Without a doubt ....At At 2.2 lakh crore .....currently cost is 1.8 lakh crore
@@its_not_the_Ishu when a strong nationalist have a woke son 🤡
@@Anonymous-dy2zu Bro he is more dangerous than you think ....This all started with the murder of govind pansare in 2015..the murder made his book 'Who was shivaji?' more famous ..this book made shivaji mahraj a secular leader saying that he had appointed many muslims in various posts even his bodyguards ..some of them are true but many of its statements are based on the findings of left wing or liberal historeans...whom didn't liked shivaji maharaj being the icon of hindutva.....AND UDDHAV THACKRAY IS USING THIS BOOK'S SHIVAJI MAHARAJ TO GATHER MUSLIM VOTES AND USING BALASAHEB'S FACE TO GATHER HINDU VOTES...This MF is successful in spreading fake news about central gov projects in maha ...and the maharashtra BJP leaders are fu*king morons except few🤦♂
Daydreaming
Please like if you voted for BJP in 2024.. 😊
Construction needs to be accelerated. 2026 is too late
no
No it’s not, we just started in 2021 it’s gonna take like 2 more years only
Just build more tracks.
Is speed se to china ko kabhi beat nahi kar payenge speed chahiye kaam me otherwise ye politicians ke chakkar me development project aise hi bich me latke rahenge
Congress ayega to baand ho jayega hsr ka kaam
2028 complete hoga conferm 😢
2026
Very slow construction 😔
What can you expect from a democratic and diversed nation
What if it runs at 240
Its E5 series ...capable of achieving speed upto 350 ...but maximum apeed allowed for operations will be 320kmph
Km/hr or miles/hr ye mention Karo , 220 miles/hr is 350 km/hr. So not possible
@@its_not_the_Ishuaverage speed toh 240-250 he rahegi . Itne sare curves hai pure route mein . Boisar to vapi he sayad 320 touch karegi.
@@rohityo8729 bro avg speed is going to 250km/hr only , nhrscl as already said that.
@@rohityo8729average hamesa 100km kam hoti hai bullet train me.
1 train will have average speed of 250km complete journey in 2h7min. Skipping 8 station
2nd train which stop at every station will have speed of 170kmph complete journey on 3hr.
If it takes us 10 years to build just one bullet train network, then when do we expect to connect the entire country?? by 2100?🤨 Meanwhile, China built a 50,000 km network in just 16 years! This stark difference in progress highlights the urgent need for us to ramp up our infrastructure efforts and adopt more efficient practices to keep pace with global advancements In which the present government also seems to have failed.
You r wrong brother, hame ek first vande Bharat banen ko bahut time laga tha and musibat bhi ayi thi but abhi ek sath 5 se 10 vande bhart ka inogration hota hy , so se ye first bullet train hy hamre log first time ka4 rahe hy bullet train pe to thoda vakt lagega and ek sab hogya to jaldi Banega and dusri bat inta late hota bhi nhi but Maharashtra politics and land issue tha , so thoda desh kelye positive bhi socha Karo apna hi desh hy
Delhi Mumbai expressway unfinished, RRTS unfinished, Bullet train not start yet, USBRL rail link unfinished, coastal road Mumbai unfinished, Aqua line mumbai metro unfinished, WDFC unfinished, Vander Bharat Sleeper not launch yet, Dwarka expressway unfinished, and there are many such schemes which not completed yet or unfinished. Modi government matlab adhure kaam ki puri garantee 🤦🏻♂️✅😤
@@ziggstopper6728Calm down your tits, spammer. Kisi project ko pura hone me time lagta hai ki nahi ? koi jaadu karke thode ek jhatke me khatam kar denge. Vaise bhi uddhav govt & cvid ki wajah se 3-4 saal ka delay ho gaya hai & currently acche speed se hi chal raha hai project.
It’s possible in China not in India… as they have an authoritarian regime and the civilians have to obey orders of the government, they can’t protest. India lags here since land acquisition takes lot of time because of differences.
Brother, ye india hy china nhi yaha ek kam karne jao to 100 musibat ati hy road banne jao to log bolte ped kyu cute kye and road nhi Bane to bolte sarkar kya kar Rahi hy koi kam ek din me to nhi hota or isa bhi nhi hy ki kuch kam complete nhi hua , 2014 me 5 cities me metro thi abhi nearly 30 cities ye nahi dikha , railway electrification 2014 me 65 persent thi ab 95 persent hy , channai , banglore highway , and many more hy har Kam hoga bas vakt lagega because yaha democracy hy log bolte hy protest karte hy
First pay the compensation in palghar maharashtra. NHSRCL stop Land grabing forcefully and not pay a single compensation to genuine landowners .
Seeing the progress one can definitely say that they are going to miss the deadline again.
Work is too slow😢😢😢😢😢
Completing in 2045
Chinese bot😂😂😂
Wumao bot farm 🤡
किसने किसने अपना पहला वोट BJP को दिया है 🔥🚩
Ban jayegi 2051 tak
Turtle speed... ...
We need own bullet train building machinery otherwise it will take 10 year more to complete
then wait 25 years, to use our own machinery
bjp
Bad progress. Y u hiding that only 42 percentage of work is completed. State that asssssswole
42 is bad?
@@DevilBg-cv2hx yes listen to shameless prime minister speaking it's almost coming to completion
@@DevilBg-cv2hx bhai ye mars mai rehte thee kya? Inko covid ke bare mai pata nahi hai?
Covid ke vajah se speed kaam ho gaya hai work ka pata nahi hai kya?
@@Hello72136 slow hone me or delay hone me fark h 2023 December completion date tha tab Tak lowest to lowest 60-65 percent to hona hi hona chahiye tha but hua kitna 38-39 percent .???? Bilkul adha . or shameless prime minister bolta hai bullet train is nearing completion. Agar nearing completion hai to 6 mhine pehle se percentage share karna band kyu kiya ???? Kisko bewakoof bna rha hai
@@AJAYKUMARSingh-hx7wy construction started in early 😂2021. China took 11 years for its bullet train too. Indonesia 7 years for 150km now tell me india will complete in 2028. 11 years for 500km is slow that too COVID delayed it
If congress comes to powee they will stop all infra projects started by bjp and nda best example is that they stopped the progress of golden quadilater which connect 4 metropolitian cities
Congress never allow other parties to do development
Kam mai aur tezi lao, ise 2025 tak complete karna hoga....
Bhai it will run on 320 😊❤
320*
No 320 is more than enough...at 350 it will not be buttery smooth experience
@@DevilBg-cv2hx yes but its maximum speed is 350 👍
@@VeerChandija but won't run on 350
@@DevilBg-cv2hx yes run on 320
Namaskar Doston - kya humein india mein bullet train ki zarurat hai 😂😂😂
Nehi Hume gulami karni hain😂😂😂
@@chandanmishra8211Germany ki gulami 😂😂