Time and Work - Shortcuts & Tricks for Placement Tests, Job Interviews & Exams

Sdílet
Vložit
  • čas přidán 28. 08. 2024

Komentáře • 1,2K

  • @CareerRideOfficial
    @CareerRideOfficial  Před 5 lety +172

    Practice Questions on "Time and Work" available at: www.careerride.com/mcq/time-and-work-quantitative-aptitude-mcq-questions-27.aspx

    • @ajumlom7688
      @ajumlom7688 Před 4 lety +2

      Sir dont get the Q.no ten 1-7/8 then remaining work will 1/8 could u pls explain it

    • @anilsai7509
      @anilsai7509 Před 4 lety +5

      tq sir really these are the best aptitude tutorials in youtube tq..

    • @manvisingh3189
      @manvisingh3189 Před 4 lety +1

      Hallelujah

    • @ananta_pandey__
      @ananta_pandey__ Před 4 lety

      @@manvisingh3189 matlab???

    • @pramodchitta3995
      @pramodchitta3995 Před 4 lety

      In 10th question,in 13thday1/16amtof work was remaining were Rdoes1/8amtof work.You took x factor to S i.e.,3/4.Whycan'tutake for R on 13th day itself???I think we shd take there itself weget1/2asx factor then the ans is12&halfday.Please reply to me

  • @akshaypawar8097
    @akshaypawar8097 Před 6 měsíci +513

    How Many People Are Watching in 2024 😂 Attendence Laga Do 👍

  • @samyakjain720
    @samyakjain720 Před 4 lety +892

    Amazing! who else watching during placement?

    • @yesh5981
      @yesh5981 Před 4 lety +8

      CTS 2-3 weeks to go , getting started now :p

    • @muthuramalingam8489
      @muthuramalingam8489 Před 4 lety +13

      CTS one week to go!! Now oly starting Quants

    • @angelaa1594
      @angelaa1594 Před 4 lety +3

      @@muthuramalingam8489 did yu attended the cts exam? R yet to come?

    • @muthuramalingam8489
      @muthuramalingam8489 Před 4 lety +1

      @@angelaa1594 Yet to Come!! Now oly preparing

    • @angelaa1594
      @angelaa1594 Před 4 lety +1

      @@muthuramalingam8489 ok!...how did yu preparing fa coding?

  • @ashtonlobo9930
    @ashtonlobo9930 Před 4 lety +452

    Easy way to solve Question No 6:
    3 men do 1/2 amount of work so 1 men does 1/6 amt of work
    4 boys do 1/6 amt of work so 1 boy does 1/24 amt of work
    Therefore,
    8 Men and 8 Boys do the work in,
    8x(1/6)+8x(1/24) = 5/3
    Inverting would give 3/5
    P.S : I Really like these tutorials.. Now I have more confidence in solving Aptitude questions!

    • @medxyskllyf3020
      @medxyskllyf3020 Před 4 lety +11

      Same i also found this way easier

    • @prakhargaur1298
      @prakhargaur1298 Před 3 lety +10

      @@medxyskllyf3020 direct trick for similar questions:- 8/3*2+8/4*6

    • @kedareshwarm.n.5373
      @kedareshwarm.n.5373 Před 3 lety +2

      @@prakhargaur1298 is this crct method bro

    • @gopalkrishna1709
      @gopalkrishna1709 Před 3 lety +6

      10 th sum p= 16 ( 3)
      Q= 12( 4)
      So total 48 units of work and per 2 day they r doing 7 parts
      2-7 parts
      ?-48 parts
      96/7 = so per 13 days they do 91 parts and they left 5 parts na so 13 th day p do the work so per day p do 4 parts na so 1 part remained so this one part done by q in 1/3 days so total 14(1/3) but it is not working because 14× 7 = 98 it is more than total units so it is wrong were I did wrong plz explain na

    • @Prince650.
      @Prince650. Před 3 lety +3

      I really like this method tq

  • @abhaymhatre291
    @abhaymhatre291 Před 4 lety +103

    I'll be honest, I tried so many books and videos but no book/video made this topic easy than you guys did. Kudos. Thank you so much!!!!

  • @akhilesh2499
    @akhilesh2499 Před 2 lety +77

    Q9:: A already is working 8 hours/day . Now we can calculate the no. of days for B to finish if he works for 8hours/day.
    B's total hours=8*10=80
    if B is working 8hours/day=80/8=10
    Now calculate simply A and B working together = 1/12 + 1/10
    ans =60/11

  • @Desi_vyanjan
    @Desi_vyanjan Před měsícem +43

    Anyone 2024 😂😂

  • @kewinjoephilip7870
    @kewinjoephilip7870 Před 4 lety +286

    Sir :"Very easy"
    "Extremely easy"
    "See how easy it was"
    "Very very very easy"😁😁

  • @borugaddapriyanka7527
    @borugaddapriyanka7527 Před 2 lety +24

    You are helping a lot for poor people who unable to pay for online coachings and preparations and all. Tq so much sir😭🙏🙏

  • @chitturipoojitha3262
    @chitturipoojitha3262 Před 4 lety +89

    You are a life saver sir, taught us with brilliant tricks and now I am able to solve similar problems with ease and effortless, Thanks a ton sir

  • @sravanigoteti4752
    @sravanigoteti4752 Před 3 lety +38

    I genuinely prefer this channel for all my aptitude like every video is neat and clear, thank you

  • @TheSolutionMan
    @TheSolutionMan Před 5 lety +84

    simple and clean way for ques no. 7-
    let n be the days they worked together
    we know total amount of work done is 1 so,
    ( 1/20+1/25 )*n + 10*( 1/25 ) = 1
    9n/100 + 2/5 = 1
    9n + 40 = 100
    n = 60/9 = 20/3

  • @xerxius5446
    @xerxius5446 Před 3 lety +98

    An easier method of solving question 10
    just use the normal technique that he described earlier and at the end divide by 2 because only one person works on a given day
    Raj does 1/16 work in 1 day
    Suraj does 1/12 work in 1 day
    Raj + Suraj when working alternating,
    = 1/12 + 1/16 work in 2 days
    = 1/2*( 1/12 + 1/16) work in 1 day
    = 7/96 work in 1 day
    Raj + Suraj does 7/96 work in 1 day, so, they do the work in 96/7 = 13.75 days

  • @stutinayak846
    @stutinayak846 Před 3 lety +73

    Only this channel is my hope when it comes to quantitative techniques!! Thank you so much, Sir.

  • @subhradas5482
    @subhradas5482 Před 3 lety +10

    These videos are much much better than paid aptitude sites... Thanku for sharing the knowledge with us

  • @hibajaleel1315
    @hibajaleel1315 Před 2 lety +30

    For Qn 2
    We can use an eqn
    M1 ×D1×H1/W1 = M2×D2×H2/W2
    Where M1, M2 - no of men
    D1, D2 - no of days
    H1, H2 - no of hours
    W1 ,W2 - no of work
    This eqn can be used in such type of problems. In this question
    M1 = 24
    M2= 30
    D1 = 10
    D2 =?
    Therefore ,
    M1×D1 = M2 ×D2
    D2 =M1 ×D1/M2
    = 24×10/30 = 8 days
    😇😇😇😇

  • @justlikethat2071
    @justlikethat2071 Před 3 lety +15

    One of the best tutor. Sir u make maths looks so easy... God bless u sir

  • @yuvarajkumar3053
    @yuvarajkumar3053 Před 6 lety +13

    Its very beneficial for who are searching for placements.I AM GRATEFUL TO SAY THIS ''THANK YOU SIR''

  • @byrrajuabhilashraju1822
    @byrrajuabhilashraju1822 Před 4 lety +5

    Question 7
    Lcm of 20 and 25 is 100.
    Efficiency of sita and Gita 5 & 4.
    Gita for 10 days= 4*10.
    Remaining 60 both has done.
    60÷9 = 20/3....
    u can do like previous model too.

  • @theDRAMA01
    @theDRAMA01 Před 3 lety +63

    Last question - more simple solution
    :- total work in 1 day = 7/96.
    ~ 7/96work*x days =1(total work)
    ~ x= 13.7 😎😎

    • @kavyasarraf8664
      @kavyasarraf8664 Před 3 lety +3

      WOWWW
      your comment must got 1k likes but the fact is u got only 1 like of me
      THAAAAAAANK YOUUUUUUUUUUUUUU

    • @ramyapeko219
      @ramyapeko219 Před 3 lety +1

      May i know how u got total work in 1 day as 7/96

    • @GokulM28
      @GokulM28 Před 3 lety +28

      @@ramyapeko219
      Raj work -> 16 days -> 1/16 work/day
      Suraj work -> 12 days -> 1/12 work/day
      They work on alternate days
      So for 2 days work done = Raj's 1 day work + Suraj's 1 day work
      = 1/16 + 1/12
      2 days work = 7/48
      Total work to be done is 1.
      Therefore for 2 days -> 7/48
      so for ? days -> 1 i.e. completing the work
      by simply cross multiplying
      ? days = (2 x 1)/(7/48)
      ? days = 13.7 days

    • @ramyapeko219
      @ramyapeko219 Před 3 lety +1

      @@GokulM28 Thank u

    • @rahulmaurya6910
      @rahulmaurya6910 Před 3 lety

      Thanks Tejas bro you are genius

  • @aarooshibhatt2003
    @aarooshibhatt2003 Před 3 lety +6

    afternoon sir ! im a bank aspirant, an average student my basics over some topics was not clear and it gave me a lot of stress as i tried t solve them . i saw your video today and on one go i got everything . thank you so much im very happy!

  • @amandeepsaluja7395
    @amandeepsaluja7395 Před 3 lety +49

    9th question can be done in a simpler way. I got the same ans doing less calculation.
    A's one day work = 1/12 [8hrs per day]
    B's one day work = 1/8 [10hrs per day]
    if 1/8 work is done in 10 hrs, the amount of work done in 8 hours will be 1/10
    now we have both A and B 8 hrs work per day
    1/12 + 1/10 = 11/60(one day's work together)
    total time taken = 60/11 days

    • @kavyasarraf8664
      @kavyasarraf8664 Před 3 lety +2

      WOWWWWWW...U R GR8

    • @SkAlhtar
      @SkAlhtar Před 3 lety +1

      Is this samples are relevant for campusing?

    • @Bug_Hunt
      @Bug_Hunt Před 3 lety +2

      How did u get B's work for 8 hours as 1/10?

    • @amandeepsaluja7395
      @amandeepsaluja7395 Před 3 lety +1

      @@SkAlhtar Yes, trust me when I say this, at first you will question the relevance but in the long term they really help you build a good concept.
      Shortcuts in aptitude are pleasant to watch and tough to learn.
      All the best.

    • @amandeepsaluja7395
      @amandeepsaluja7395 Před 3 lety +3

      @@Bug_Hunt at first B's 1 hour work will be 1/(8*10) =1/80 then we need to find B's 8 hours work will be 1/80 * 8 = 8/80 = 1/10.
      Hope this helps, this chapter sometimes requires some out of the way calculations and tricks.
      All the best.

  • @PDC480
    @PDC480 Před 4 lety +26

    Sir, U remind me my school time, the same way I have done in school, it is like I m revising things, Thank u,

  • @sec-1jjcolonydwarka-01dabr3
    @sec-1jjcolonydwarka-01dabr3 Před 3 měsíci +24

    Who is watching in 2024

  • @GodSky07
    @GodSky07 Před 4 lety +30

    Sir your lectures give me a morale boost to perform better in the exams and motivates to do better.

  • @meeraanil382
    @meeraanil382 Před 4 lety +8

    The best maths class in CZcams...
    😁👌
    Thanks a lot sir.

  • @sirajshaik8940
    @sirajshaik8940 Před 6 měsíci +29

    2024 attendance pls😂

  • @crimsonbaddy
    @crimsonbaddy Před 4 lety +13

    I bow my head to you.. Thank you Sir🙏
    This aptitude is Useful For my Class 10th Syllabus..
    I dont like Rot learning..

  • @anshulmittal6390
    @anshulmittal6390 Před 4 lety +8

    Sir
    A short talk I will tell
    There are many short tricks and method which can solve problems in 2-3 lines only.
    You make it more complicated and even tough for beginners students.
    So take in mind short tricks bcoz in govt time given is very low.
    But your effort is great towards your students

  • @ritvicksrivastava1436
    @ritvicksrivastava1436 Před 4 lety +37

    Need a video on tricks and important questions related to Calendar

  • @durva.pednekar5
    @durva.pednekar5 Před 4 měsíci +24

    2024 anyone?

  • @sona6039
    @sona6039 Před 5 lety +12

    Sir ....I like ur way of teaching
    All the concepts are made clear
    And it makes me more confident
    Thanku sir!!😊

    • @CareerRideOfficial
      @CareerRideOfficial  Před 5 lety +4

      You're welcome, Apurva. Please subscribe the channel for more career related videos and stay connected :)

  • @saylipatil6037
    @saylipatil6037 Před 4 lety +19

    Actually its very interesting and i luv to learn from careerride it just made it simple

  • @Subzero_101
    @Subzero_101 Před 5 lety +8

    Question 5..
    Work Efficiency p:q = 4:5
    Time efficiency= p:q=5x:4x
    P can do a work in 30 days..
    So 5x= 30 => x = 6...and subtitue in time effeciency

    • @sreelekshmil5231
      @sreelekshmil5231 Před 6 měsíci

      can u plz explain🙂

    • @Subzero_101
      @Subzero_101 Před 5 měsíci +1

      in the question q is more efficient than p ..so i took 100% for p for easy calculation...so p:q is 100:125 means 4:5 work
      and time efficiency for p:q is 1/4x:1/5x....means 5x:4x..x is time here...5 and 4 are work part..
      already we know p has done in 30 days...5x is 30 means 5x=30 so x =6...now we have to find the days took by q...so q part is 4x so 4*6=24

    • @sreelekshmil5231
      @sreelekshmil5231 Před 5 měsíci

      @@Subzero_101 thankuu ❤

  • @ansariiqbal1967
    @ansariiqbal1967 Před 2 lety +2

    After watching your videos now I have more confident
    Thank you so much sir
    Love from GUJARAT

  • @tusharkaushik9554
    @tusharkaushik9554 Před 4 lety +14

    Best thing is : THIS IS VERY EASY SUM.
    Quite motivates me to learn more. Thank you Carrer ride

  • @LakshmiSaranya-hz9ho
    @LakshmiSaranya-hz9ho Před 4 měsíci +16

    Me watching in 2024😅

  • @srijajulakanti6742
    @srijajulakanti6742 Před 3 lety +13

    I think this is the very best best platform to learn aptitude. Thank You So Much Sir For explaining us very clearly

  • @damerlabalachandar8347
    @damerlabalachandar8347 Před rokem +2

    Whenever I listen that easy word before starting a sum it boosts up my confidence level thank you sir..

  • @reubenlhouvum2086
    @reubenlhouvum2086 Před 3 měsíci +1

    Line diagram is the best to solve time and work . Very much appreciated .and especially lecture in English is the best ❤

  • @sahilprasantachoudhury911
    @sahilprasantachoudhury911 Před 3 lety +67

    Self referential note:
    Solution of 9Q.
    A's 1 hour's work = 1/(12 ×8)
    B's 1 hour's work= 1/(8×10)
    (A+B)' s 1 hour's work = 1/96 + 1/80
    (A+B)'s 8 hour's (or 1 day's)work = (80+96) X 8/(96×80)
    Total number of days= 96×80/(80+96)×8 = 60/11 days (Ans)

    • @anchal________2944
      @anchal________2944 Před rokem

      can u explain me question no 5 how it becomes 125 % of 100

    • @_sayandas
      @_sayandas Před 11 měsíci +6

      @@anchal________2944 No need of such confusing stuff , simply do 1/30 + 1/30 * 25% . You'll get answer in 1 step

  • @hithasunil
    @hithasunil Před rokem +3

    PV&CCC✔
    Positive Vibes .Content Concept Clarity within few seconds, what a combo indeed!

  • @shahidaparveen8143
    @shahidaparveen8143 Před 2 lety +12

    For 36:12 Mt thought process is..
    Let Raj takes x days and Suraj takes y days while working at alternative days.
    X/16 + Y/12 = 1
    Simplifying...
    3X + 4Y = 48
    Now, values of X and y must be the closest..
    Half the left most value i.e. 48/2=24 as both are working alternate days...
    Values of X may be 6, 7, 8 and corresponding values of y becomes 7.5, 6+3/4, 6. Closest pair is 7 and 6+3/4....
    Total days = 13+ 3/4

    • @money_earn_tamil
      @money_earn_tamil Před 7 měsíci

      How the corresponding values in to 7.5, 6+3/4 and 6

    • @shahidaparveen8143
      @shahidaparveen8143 Před 7 měsíci

      If we put 6 in place of X (in equation) the Y value will be equal to 7.5, similarly, other values...

  • @lookaround1683
    @lookaround1683 Před 5 lety +11

    question number 2 simplified
    24 man= 10 days
    1 man= 24*10=240
    30 man=240/30= 8
    so 30 man will complete work in 8 days

  • @kalidinditejasree5132
    @kalidinditejasree5132 Před 5 lety +13

    Simply invert😊😊😍

  • @ELAVARASU_K
    @ELAVARASU_K Před 4 lety +5

    Q)9) 1day work(A)=1/12
    1 hr work of 8hrs=1/12*8
    1day work(B)=1/8
    1 hr work of 10hrs=1/8*10
    Total 8hrs working of A and B in oneday=8/12*8 + 8/8*10 =11/60,. Invert. So ans=60/11

  • @mousumisahoo8022
    @mousumisahoo8022 Před 3 lety +2

    BEST VIDEO ON TIME AND WORK...Hats off to the explanation 👌👍

  • @kewtomrao
    @kewtomrao Před 2 lety +32

    For the 8th Question:
    Let P+Q finish work in N days
    P+Qs 1day work = 1/N ...eq1
    When P works alone,he takes:N+25 days
    Hence Ps 1day work = 1/N+25
    When Q works alone,he takes: N+9 days
    Hence Qs 1day work = 1/N+9
    Using eqn1:
    1/N+25 + 1/N+9 = 1/N
    Solving N=15 (Ans.)

  • @MAYANKSHAHRA
    @MAYANKSHAHRA Před 4 lety +20

    thanks for all of your efforts in this aptitude series. love it

  • @wandelrand1283
    @wandelrand1283 Před 6 měsíci +6

    How many people are watching in 2024😢

  • @janetralte3861
    @janetralte3861 Před 2 lety +2

    Your teaching helped me alot since I was struggling to memorize formulas. I am now able to solve questions easily. Thanks a million.

  • @tech-learner4555
    @tech-learner4555 Před 3 měsíci +1

    Super sir, am just gonna invert my placements💥✨

  • @muraliaari1515
    @muraliaari1515 Před 5 lety +4

    Simple method for QNo6
    3men = 2 days
    ie 3men = 1/2
    1man = 1/6.
    8men = 8/6.
    Hence, 8boys = 8/24 (like above)
    Now 8/6 + 8/24 = 6/10
    ie 10/6 days..

  • @khambalebs4683
    @khambalebs4683 Před 5 měsíci +9

    How many watching in 2024

  • @sourabhbhandare8382
    @sourabhbhandare8382 Před 3 lety +1

    dear sir, your voice is very excellent and your teaching method is easy way to understand so thank you sir, keep it up................................

  • @ashutosh7133
    @ashutosh7133 Před rokem +1

    One of the best videos I have watched so far, covered almost all the types of question and that too with proper concepts...
    Keep it up, more power to you!!!!

  • @deepaks7990
    @deepaks7990 Před 4 lety +11

    Thank You sir! Especially I found the last sum more clearer which was very confusing before.

  • @payalparida4644
    @payalparida4644 Před 5 lety +10

    The fundamentals got so clear by the way you explained.

  • @ravidhakad5215
    @ravidhakad5215 Před 3 lety +2

    You are the only one channel where I prefer to learn quantative maths.

  • @JavedKhan-uv3ru
    @JavedKhan-uv3ru Před 3 lety +2

    Completely cleared all the doubts thank u so much sir for ur clear explanation.

  • @anubhavverma9240
    @anubhavverma9240 Před 6 lety +94

    sir, the 9th question can be done in a much more simpler manner
    just by finding the one day work by A AND B in 8 and 10 hrs respectively
    ie
    for A
    1/12 amt of work in 8hrs
    for B
    1/8 amt of work in 10hrs which can be found for 8hrs
    so B's 8hr work will be 1/10 (using unitary method)
    so now.....both have same 8hrs work
    so (1/12)+(1/10)=11/60..................................total work in one day by both
    so the answer would be by inverting ie......60/11....(saves lots of calculation time)
    thankyou,,,

    • @smilypriya3201
      @smilypriya3201 Před 5 lety

      What is unitary method

    • @adityalodhi4023
      @adityalodhi4023 Před 5 lety +1

      Anubhav Verma Q6 can also be done by unitary method

    • @sanathkumar9732
      @sanathkumar9732 Před 5 lety

      What is unitary method can u explain it

    • @magnus6830
      @magnus6830 Před 5 lety +5

      Unitary method is nothing but cross multiply.
      In this case:
      B can do 1/8 amount of work in 10 hours then B can do x amount of work in 8 hours. After cross multiplying, we get
      10x = 8/8 i.e. x = 1/10

    • @shivarajkenganur5372
      @shivarajkenganur5372 Před 4 lety +2

      Bro compare to your solution their method is more easier

  • @sumangalchakma9746
    @sumangalchakma9746 Před 5 lety +27

    Simple way:A:B=5:1
    Difference 5-1=4
    So,A= 5/4×60=75 days
    B=1/4×60=15 days.

  • @satyjitrajemahadik9964
    @satyjitrajemahadik9964 Před rokem +1

    i was thinking it was complicated but you made it easy for me

  • @hemanthmodani1631
    @hemanthmodani1631 Před 2 lety +2

    Thanks a lot for your videos , they helped me to get an offer from TCS Digital.

    • @CareerRideOfficial
      @CareerRideOfficial  Před 2 lety +1

      That's a great news, Hemant. Congrats! And, thank you for coming back to share your happiness with us. All the best!

  • @drumill
    @drumill Před 6 měsíci +5

    guys remember:
    "SIMPLY INVERT"

  • @vishnucharan4140
    @vishnucharan4140 Před 4 lety +9

    Nice Video.Keep it up.I Simplyyyy inverted the subscribe button to subscribed 😂😂😂😂

  • @ravindrar264
    @ravindrar264 Před 2 lety +1

    Just invert it!!! Amazing sir... great explanation

  • @identifynow
    @identifynow Před 6 měsíci

    Sir i am preparing for IPMAT 2024 and basically started now dedicatedly. These videos are a lot helpful , if i clear it. I will definitely try to find you in real life and thank you personally. Thats my promise.

  • @arifnadim6225
    @arifnadim6225 Před 4 lety +4

    No 8 :
    Together n days
    P alone n+25, Q alone n+9
    So, {(n+25)×(n+9)}÷(n+25+n+9) = n
    n^2 =225
    n=15
    See,how easy it was!

  • @abhikannadiga7303
    @abhikannadiga7303 Před 7 měsíci +3

    How many people watching in 2024😁

  • @user-ws1hu2sb3h
    @user-ws1hu2sb3h Před 10 měsíci +1

    these videos are really helpful. Great job

  • @T3echG33k
    @T3echG33k Před 4 měsíci +2

    Started preparing for Tcs nqt before 4 days

    • @rajeshbpatil
      @rajeshbpatil Před 4 měsíci

      Kya kya pad rahe ho Bhai...😅 Toda batao... Kaunse concept easy hai... Wahi prepare karte hain

    • @T3echG33k
      @T3echG33k Před 4 měsíci

      @@rajeshbpatil Just prepare all the basics bro. Watch career ride's quants play list . It will be helpful. For logical reasoning use India bix

    • @rajeshbpatil
      @rajeshbpatil Před 4 měsíci

      @@T3echG33k ok TQ

  • @lhangumletmin3611
    @lhangumletmin3611 Před 4 lety +5

    Thank U so much for your kindness,Sir. May God blessed u.

  • @rushilmehta4415
    @rushilmehta4415 Před 3 lety +5

    The short trick used in the question no. 8 can be used for any number of workers or just for 2 workers?

  • @shivanirana111
    @shivanirana111 Před 2 lety +1

    Sir plz solve this: A completed a piece of work in 60 days and B is 50% more efficient than A. They start working together but B left the work after 5 days then A can complete the work in?

  • @venkat.ambati5565
    @venkat.ambati5565 Před 7 měsíci

    The way of teaching is excellent sir and i willing to listen more and more 😊😊 thank you sir

  • @avinashjha7138
    @avinashjha7138 Před 6 lety +126

    Simplyyyyyyyyyyyyyyyyyyyyyyyyyy Invert

  • @Dsharma2
    @Dsharma2 Před 10 měsíci +154

    How many people are watching in 2023 😂

  • @BcomingHIM
    @BcomingHIM Před 3 lety +2

    thanks man. never realized time and work questions are not that difficult

  • @gandhijainamgunvantkumar6783

    Thank you so much for the amazing explanations and tricks. Now I can easily solve this type of problems of work and time :)

  • @BoomcoreIsLive
    @BoomcoreIsLive Před 5 lety +18

    6th question... If 4 boys work 1/6 a day... Then 40boys that is 4*10 boys will work 10*(1/6) a day ! simple.

  • @mogiliharisree9099
    @mogiliharisree9099 Před 4 lety +3

    That was an extraordinary video! I understood time and work precisely!! Thank u

  • @gopika1978
    @gopika1978 Před 2 lety +2

    what an explanation sir...
    you are a fabulous teacher.

  • @yuthikasurasetty1991
    @yuthikasurasetty1991 Před 8 měsíci

    I was struggling so much in this chapter after hearing this video it was very easy to solve work and time problems and cracked an exam real easily......thank you so much sir!!!

  • @avb34
    @avb34 Před 5 lety +3

    Q6. Simple way: Find 1 day work by 3 men (1/2), 1 day work by 1 men (1/6) similarly 1 day work by 4 boys (1/4), 1 day work by 1 boy (1/24). then find 1 day work by 8 men (8/6) and 1 day work by 8 boys (8/24) add them get answer (3/5) .......lol

  • @komaldeshmukh6184
    @komaldeshmukh6184 Před 5 lety +5

    Each and every video of yours is very helpful and can get easily understood by the simplest concepts.

  • @MaybeSomeone7483
    @MaybeSomeone7483 Před 4 měsíci +2

    All the best everyone for your exams!

  • @vishnukurmala9996
    @vishnukurmala9996 Před 3 lety +2

    I have been coming across all, at any point I haven't felt bored, all the way it's exciting and you making tough topics, easy!! Btw Love your cliches asf!! If I would pass the aptitude part in my college placemnts, full credits goes to yu. Keep up your adorable teaching as well as admirable work.

    • @ankitsaini6905
      @ankitsaini6905 Před rokem

      These topics in the quantitative aptitude playlist are sufficient for placement test?

  • @darshan5515
    @darshan5515 Před 25 dny +4

    In 2024 watching

  • @Subzero_101
    @Subzero_101 Před 5 lety +7

    For the 1st question..
    Work Efficiency => a: b= 5:1
    Time efficiency=>a:b= 1:5
    So b takes 60 more days to complete the work
    So..b days - a days = 5x-1x = 60
    => 4x=60 =>x = 15
    So b= 5x => 5*15=75 and a= 75-60= 15... thats it...let me know if u got any doubt...

    • @Subzero_101
      @Subzero_101 Před 4 lety +1

      @@mixedbyhals1329 tell me if im wrong...and clarify if u are smart enough.. dont be a dumbass tryin to judge.!...and the answer is correct..im sure ur poor at math.. birdbrain!!😂😂

  • @user-pr5wv4uj4j
    @user-pr5wv4uj4j Před měsícem +2

    Hi sir..in qn no: 4 they asking time ? What but put only dayss

  • @ravulanikhi9905
    @ravulanikhi9905 Před 3 lety +2

    This lecture is simply superb it was so much better than coaching aptitude lectures

  • @KingKhan-bi7kb
    @KingKhan-bi7kb Před 4 lety +19

    Sir:Solves a difficult sum
    Also sir: See how easy it was !!!😊😊

  • @hemaysorathia2103
    @hemaysorathia2103 Před 2 lety +4

    SOLUTION OF THIS PROBLEM PLEASE:
    A and B together can complete 75% of a work in 33 days while A, B and
    C together can complete the whole work in 26 days. If ‘C’ is 12.5% more
    efficient than B then find the time taken by A and C together to complete
    70% of the work.

    • @LostAdmin
      @LostAdmin Před 8 měsíci

      Really good question
      I have solved it more than half and I know which steps I should take next but I am lazy rn to do this much calculation
      For proof (total days required to work be done by A and B is 44 days, work done by c in one day is 9/572, work done by B in one day is 9/1.125*572 ....)
      Calculate the rest by yourself 🥱

  • @khushikareliya1090
    @khushikareliya1090 Před 6 lety +2

    In 9th problem, calculation of A and B working together consumes 2hrs for the work (176/(96*80)). Final answer is 120/11.

  • @Serapa2022
    @Serapa2022 Před 5 lety

    Best in India... Thank you so much especially those who do not afford coaching class & for non Hindi speaking people

    • @CareerRideOfficial
      @CareerRideOfficial  Před 5 lety

      Thanks, Conor. That's a huge compliment. Please subscribe for more career related videos and stay connected :)

  • @neesj5997
    @neesj5997 Před 6 lety +3

    This channel is really best
    And sir your way of teaching is awesome :-)

  • @NISHASINGH-uh2ys
    @NISHASINGH-uh2ys Před 4 lety +3

    Please make video on set theorey , way of teaching in careerride is excellent. Thank you

  • @rishikakathuria3211
    @rishikakathuria3211 Před 2 lety

    After months of searching for good aptitude videos, found this perfect channel !!

  • @Darkspell1947
    @Darkspell1947 Před 3 lety +2

    I've watched HCM and LCF, Averages, pipes vedios and i solved questions on this topics from RS agarwal, and came to know many concepts are missing. Plz include them too!!