Level Crossing, Wingham NSW, Part 3.

Sdílet
Vložit
  • čas přidán 23. 08. 2024
  • The first activation is shown at 2:31
    This is the Wingham Road level crossing at Wingham, New South Wales. Since I last filmed the crossing in June 2020 the Safetran mechanical bell has been replaced by a Western Cullen Hayes mechanical bell.
    In March 2021 the town of Wingham was inundated by major flooding which lasted for several days, during this time the railway line was covered by water which caused continual activation of the level crossing. It is likely that this prolonged activation was a contributing factor in the Safetran bell dying so quickly.
    The Safetran bell can be seen here in part 2 • Level Crossing Update,...
    Part 1 • Level Crossing, Wingha...
    Train information:
    1st train: NT36 XPT service from Grafton to Sydney.
    2nd train: 2WB7 Qube steel service from Port Kembla to Brisbane, with locomotives QL005 and QL007.
    Filmed on September 4, 2023.

Komentáře • 15

  • @jacktherailwayenthusiast3343

    Great video Michael

  • @trainman758
    @trainman758 Před 9 měsíci

    Nice video and crossing!

  • @TheBCRailfan
    @TheBCRailfan Před 8 měsíci

    Great video! I see the bell has gone back to a WCH mechanical once again.

    • @STUAA2024
      @STUAA2024 Před 8 měsíci

      Not a black one this time, but it sounds almost like the normal.

  • @kcmorailfan4784
    @kcmorailfan4784 Před 9 měsíci

    Nice video! Shame the safetran mechanical bell here was replaced. Least it wasn't an E Bell that replaced it though.

  • @PTFSFanB0y
    @PTFSFanB0y Před 9 měsíci

    I kinda like those level crossing

  • @TrickyMario7654
    @TrickyMario7654 Před 9 měsíci

    Looks like the Safetran bell is done for, this time for good. At least they replaced it with a new WCH m-bell.

    • @McKHAust
      @McKHAust  Před 9 měsíci +1

      The Safetran bell actually sounded better when it was here compared to Taree, but guess the floods finished it off.

    • @PTFSFanB0y
      @PTFSFanB0y Před 9 měsíci

      Yo MCK&H, wanna collab?

    • @TrickyMario7654
      @TrickyMario7654 Před 9 měsíci

      @@McKHAust Yeah, it sure did.

  • @PTFSFanB0y
    @PTFSFanB0y Před 9 měsíci

    Try do Murray bridge or Adelaide crossing next please

  • @TazzieTransport
    @TazzieTransport Před 9 měsíci +1

    Great video! Amazing that the signal masts still exist from original condition

  • @azurecorviknight4189
    @azurecorviknight4189 Před 9 měsíci

    Do Urunga's one dammit!
    Also whats the point of having a one track sign on a railway crossing there, they should take it off!