Oh, oh One foot in front of the other babe One breath leads to another yeah Just keep moving, oh Look within for the strength today Listen out for the voice to say Just keep moving, oh Go, go, go Figure it out, figure it out, but don't stop moving Go, go, go Figure it out, figure it out, you can do this So my love, keep on running You gotta get through today, yeah There my love, keep on running Gotta keep those tears at bay, oh Oh, my love, don't stop burning Gonna send them up in flames In flames Don't stop, tomorrow's another day Don't stop, tomorrow you'll feel no pain Just keep moving, oh Don't stop the past'll trip you up You know, right now's gotta be enough Just keep moving Go, go, go Figure it out, figure it out, but don't stop moving Go, go, go Figure it out, figure it out, you can do this So my love, keep on running You gotta get through today, yeah There my love, keep on running Gotta keep those tears at bay, oh Oh, my love, don't stop burning Gonna send them up in flames In flames In flames In flames Go, go, go Figure it out, figure it out, but don't stop moving Go, go, go Figure it out, figure it out, you can do this So my love, keep on running You gotta get through today, yeah Then my love, keep on running Gotta keep those tears at bay, oh Oh, my love, don't stop burning Gonna send them up in flames In flames
On the Hurstbridge Line as of 2018, the level crossing at Lower Plenty Road, Rosanna was removed by building a skyrail with a new elevated Rosanna Station, which also included track duplication between Rosanna and Heidelberg and the level crossing removal at Grange Road, Alphington by lowering the rail corridor beneath the road into a rail trench. And as of 2023, the Hurstbridge Line Duplication was completed which included around 3 kms of duplicated tracks between Greensborough and Eltham and around 1.5 kms between Diamond Creek and Wattle Glen. Around 4.5 kms of track duplication in total between Greensborough and Hurstbridge. Diamond Creek Station got upgraded and Montmorency and Greensborough Stations got completely rebuilt. Now they are planning to remove the level crossing at Ruthven Street, Macleod by 2027 by building a skyrail over the road. Also the rail tunnel under Greensborough Highway in Watsonia will be extended a few hundred metres longer by 2028 and there will be a multi-deck car park built at Watsonia Station also by 2028 as part of the North East Link.
best slowed version..on yt.. just the right amount of tone and reverb adjustments... keep up the good work
Wow, Thank you very much
Both nostalgic and vibey
Oh, oh
One foot in front of the other babe
One breath leads to another yeah
Just keep moving, oh
Look within for the strength today
Listen out for the voice to say
Just keep moving, oh
Go, go, go
Figure it out, figure it out, but don't stop moving
Go, go, go
Figure it out, figure it out, you can do this
So my love, keep on running
You gotta get through today, yeah
There my love, keep on running
Gotta keep those tears at bay, oh
Oh, my love, don't stop burning
Gonna send them up in flames
In flames
Don't stop, tomorrow's another day
Don't stop, tomorrow you'll feel no pain
Just keep moving, oh
Don't stop the past'll trip you up
You know, right now's gotta be enough
Just keep moving
Go, go, go
Figure it out, figure it out, but don't stop moving
Go, go, go
Figure it out, figure it out, you can do this
So my love, keep on running
You gotta get through today, yeah
There my love, keep on running
Gotta keep those tears at bay, oh
Oh, my love, don't stop burning
Gonna send them up in flames
In flames
In flames
In flames
Go, go, go
Figure it out, figure it out, but don't stop moving
Go, go, go
Figure it out, figure it out, you can do this
So my love, keep on running
You gotta get through today, yeah
Then my love, keep on running
Gotta keep those tears at bay, oh
Oh, my love, don't stop burning
Gonna send them up in flames
In flames
This sounds really good
On the Hurstbridge Line as of 2018, the level crossing at Lower Plenty Road, Rosanna was removed by building a skyrail with a new elevated Rosanna Station, which also included track duplication between Rosanna and Heidelberg and the level crossing removal at Grange Road, Alphington by lowering the rail corridor beneath the road into a rail trench.
And as of 2023, the Hurstbridge Line Duplication was completed which included around 3 kms of duplicated tracks between Greensborough and Eltham and around 1.5 kms between Diamond Creek and Wattle Glen. Around 4.5 kms of track duplication in total between Greensborough and Hurstbridge. Diamond Creek Station got upgraded and Montmorency and Greensborough Stations got completely rebuilt.
Now they are planning to remove the level crossing at Ruthven Street, Macleod by 2027 by building a skyrail over the road.
Also the rail tunnel under Greensborough Highway in Watsonia will be extended a few hundred metres longer by 2028 and there will be a multi-deck car park built at Watsonia Station also by 2028 as part of the North East Link.
Thank You
me gusta tu slowed
ชอบๆ สวยๆๆๆ 🥺
romantico
De fone ou headset fica uma sintonia mais relaxante.
@@gabrielthedits4068 to de fone headset