Minecraft Metro Full Ride | NR Line 7 - Luxter Line - upward (PreSeason 4 Phase 2)

Sdílet
Vložit
  • čas přidán 1. 07. 2024
  • Welcome to the full ride video of Los Sengas Nazca Railway. This is the full ride video of Line 7, Luxter Line, upward direction.
    System Version: PreSeason 4 Phase 2
    Station List:
    00:00 Bufly Island Station
    01:19 West Shoal Checkpoint
    02:38 Sava Canyon Station
    04:47 Downwell Sand Station
    06:15 Upwell Sand Station
    08:13 North Mountain Station
    10:11 Rover Down Checkpoint
    11:46 Coast Edge Station
    13:28 Thick River Station
    14:56 Thin River Station
    16:41 White Margin Station
    18:28 Ingress South Station
    19:54 Ingress Diamond Station
    21:25 Steep Pond Station
    22:48 Shore Tip Station
    24:57 Sand Martin Checkpoint
    27:13 Bluewhale Island Station
    28:45 Fin Bay Station
    30:15 Twintip Rivers Station
    32:07 Mangkhut Sound Station
    Nazca Railway, a Dreamer's Dream
    =====
    Join the server (1.12.2 Java): legacy.projectnazca.nhz.hk
    Join us on Discord: / discord
    Join us on Reddit: / nazcarailway
    Follow Nazca Railway on Instagram: / nazcarailway
    Follow Nazca Railway on X: / nazca_railway
    Music by Epidemic Sound
  • Hry

Komentáře • 4

  • @warriorsrussetfur123
    @warriorsrussetfur123 Před 3 měsíci +1

    It's absolutely beautiful!

  • @HED_YT7117
    @HED_YT7117 Před 3 měsíci +1

    The Luxter Line has extension to Mangkhut Sound. So was no longer terminal station of Sand Martin Checkpoint.

  • @aiyuui
    @aiyuui Před 3 měsíci +1

    the logos on the new stations look really cool - are they going to be rolled out to other stations on the network? really curious to see other designs

  • @HED_YT7117
    @HED_YT7117 Před 3 měsíci +1

    Mangkhut Sound's literally meaning is Mangosteen Bay