Upgrading of North East Line Train
Vložit
- čas přidán 4. 07. 2024
- The first upgraded North East Line (#NEL) train 🚇🟣 is out for passenger service today! 😊
📽️ Go behind the scenes with our Friends of Land Transport and discover how the upgrading and renewal works were done - from system upgrading works 🛠️ to the changing out of interior fittings 🚧 as well as train testing. 👌🏻
Thank you SGTrains for putting this video together!
#ThereRailBeMore #BetterRides
_____________________________
The Land Transport Authority (LTA) spearheads land transport developments in Singapore. We plan, design, build and maintain Singapore’s land transport infrastructure and systems.
Find out more about what we do and stay in touch:
Facebook: / wekeepyourworldmoving
Instagram: / ltasg
Telegram: t.me/s/LTASingapore
Twitter: / ltasg
Website: www.lta.gov.sg/ - Auta a dopravní prostředky
the amount of effort put into this is immeasurable ,
hats off to you LTA :)
Very well maintenance 👍
Everything looks good, clean, tidy, and well repaired. Warm regards from Indonesia Railfans 🇮🇩
Taut is pair
This upgrade gives me a renewed sense of personal safety.... thank you! 🙏
So exited for the new DRMD train map ❤️🙏
So Cool Trains 👍💖
im not in singapore,but i like train!good job LTA!
The guy talking sounds like the person making the Harbourvale announcements lol
Good work guys 👍
3:13 install the LTA logo (hopefully they do the same for both C151a and C830 after refurbishing them)
3:17 they reinstate the red and purple strips.
So happy to see the Alstom C751A trains being refurbished 💜🚇 after 16-19 years of service since 2003.
I don't think their refurbishing the C151A and C830
@@therevivalawaken. see how first
3:30 look at the background
C151a and c830 after reaching age limit, LTA will just ‘throw’ them to the scrapyard
@@mathsstarlovesmrt_r151addict69 Thats the new train
i rode this train yesterday! so interesting to see the new train being upgraded!!
Mmm, Looks good! [Wow, New Look!]
Nice job LTA and I watch the Thomson East cost line
Ding ding! I'm a tram and I approve this video!
Lta is doing very cool:)
So excited to see for the new DRMD train map
Nice work man keep going man keep going 🎉🎉🎉🎉🎉🎉🎉🎉🎉
this legendary mrt wont die
This looks interesting 😍
hope will be taking this beast
i really hope i will be taking this one day
So awsome
This music sounds like the one from the Jurong East new platform vid
Personally i don't mind. As long as train dun break down can liao. 😆😆
Good stuff !
I am a fan of you guys
3:29 Is that the C851E interior? OMG!!!!!!! LEAK LEAK LEAK!!!!!!!
? It’s not a leak if ya know what the interior is like
I rode the train today and it's awesome
@@kawingchan3646 They've lowered the sound already few weeks ago.
I FINALLY TOOK IT TODAY SUII
Nice video!
Nice video nice soundtrack
Train looks very cool. Too bad I'm not on the North-East line.
Singapore Let’s Visit
Nice
I'm excited to see the outside and the inside❤️🧡💛💚💙💜🤎🖤🤯🥳😽💖💗💓💞💕❣️❤️🩹 the train but now I haven't take the North East line
Bro don't need to put so many emojis
Wow
i reall hope to be on it
Nice!
An soooo exited to ride the new c751 a and others!
0:42 ehy it is sbs transi? Should be sbs transit
@@travelingwithanyting2446 The letter t wasn't pasted yet.
Kk
That's raily good
Wah got c851e next to the c751
Also if you zoom in you can see the C851E in the background
3:30 look at the outside the refurbished train 💀💀💀
Chuggington Let’s Celebrate
Btw why the c651 wasn't refurbished
It went to scraped and the other one was refurbished but scraped :(
the refurbished train had problems
@@poteyatocheapp6978 bc of NRFF man
Scrapped as fuck
It was refurbished
Shld add dynamic route display to oldest CL train
3:28 👀C851E
I am curious about the C851E more
Can you do the same thing but on the ccl?
❤🎉
Hello, do you know what is the name of the background music? I heard that song in The Palm Fountain in Dubai UAE before
I FINALL TOOK IT TODAY
ME TOO
2:21 in factory livery without the Red, purple stripes and SBS T logo
The only thing about that I hate the most is retiring my favourite C651
Nice and imformaitive video, also can I the name of the BGM?
BTW I Saw A C851E Relaxing At 3:28
Look, a sneak peek of C851E
IT THAT C851E ON THE CORNER
I wished they could change the motor into C651 motor
What is this song?
Yay but never see
@LTAsingapore Hi, may I borrow this song from Matthew Ng?
I got take that MRT after it got Upgraded
Sydney could never refurbish a train locally yet even make a train locally. Impressive Singapore
Can you keep some trains unupgraded i really like the yellow colour
At least the refurbished C751A are able to be on service BUT REFURBISHED C651 ARE NOT ABLE TO ENTER SERVICE!
🎉🎉🎉🎉🎉🎉
Guys train sighted at Punggol Station
I got idea that all train enthusiastic want: new train for DTL
what is the name of the song you are using?
I really can't catch train set 7013/7014 when I take the North-East Line.
C751A,C751C,C851E
When the c751a with lta logo will went into service
They already put the LTA logo on it
Anyone seen this testing without livery?
When opening NE18 Punggol Coast??
2024
What about C851A new train
I miss old mrt nel
suddenly seeing the lta logo all over the network is really unnerving like they could have just kept the old decals that looked good
Singapore Chan Brothers
But I board so many North East LIne Train, I did not see the DRMD....
so the c851e really does have the same features as the c751c
Yup, the motor is likely the same and so does the DRMD. C751C and C851E is basically like KSF C151B and C lol.
can't wait for more trains breakdown!
try malaysia
Is this the problem product that we buy cheap, from made in china product?
What about C830
C851E leaked 😮
The new train on nel has the c751c interior boring if only it was the refurbished c751a design
Nice refurbishment and also I noticed a C851E at 2:19 and 3:30
At start also have ok?
0:02
aight
U mean the Barney train?
When will Downtown line have upgrades like these?
@SpaceX-Space Flight Simulator True
Soon, but all that is done is replacement of the route maps above the door and adding more equipment
Downtown line has installed DRMD on it as refurbished
? bro everyday I ride NEL, the train still same leh
maybe cos they only upgraded one train so far..?
i cant imagine plastic seating, all our older trains and the new ones coming in a few months all still have faric seating
are u mistaken? singapore’s public transport does not use fabric seating for hygiene purposes.
@@livein54321 our buses have fabric seating tho no?
@@crabosity ...no? That isnt fabric
how long does it take to refurbish 1 train
More than 3 days
3-5 months
cmon lets be honest all of us only care about the DRMD ( but in all seriousness lta good job on the refurbishment)
I hate the DRMD design all the new information screens and wayfinding signage look weird
No.
It is fun
The VPIS could've been upgraded too; it has the room to display more detailed information e.g. currently it doesn't say what lines you can transfer to at interchange stations
3:28 Look closely and the interior of C851E has been leaked! 🤣🤣🤣
i see C851E
The front of the train is looks like a m-train
But is C851E
It's rare to find as there is only 1 refurbished unit
You can try to find during morning peak.
@@SGrailadventure2004 It's ok now I catched in 4th of may 2022 in AM hours since it always gets removed from service in the PM hours.
@@kawingchan3646 i don't know when,we will see soon.
The C851E will refurbished by 2024?
No!
Why? The train is still new and it haven't reached a few decades yet.
They could add the DRMD before refurbishment as a addon. (just like C951)
well, they don't have 50-state USA so this translate into Space
:)
Hi
3:30 hmmmm
Hmmmmm
Open Punggol cost
The seats don’t look comfortable though