Convert Updated Schedule into Baseline Schedule | Remove Progress from Primavera P6 Schedule

Sdílet
Vložit
  • čas přidán 28. 07. 2024
  • WhatsApp:wa.me/+923155537580
    Store Link: www.softedemy.com/Shop
    Contact us on info@softedemy.comm
    Convert Update Schedule to Baseline Schedule | Remove Progress from Primavera P6 Schedule
    Removing Actuals in Primavera P6: We'll guide you step-by-step on how to remove actual start dates, reset remaining duration, and units to their original state.
    Challenges & Errors: Learn about the hurdles faced when removing progress manually, and discover common errors when trying to manually remove progress.
    Harness the Power of Global Change: Understand the advantages of using Global Change for removing progress and take a detailed walkthrough on its usage.
    Activity Management: Grasp the differences between original vs. remaining duration and understand the significance of original duration. Learn how to effectively manage activity schedules, including updates, based on performance metrics.
    Deep Dive into Baseline & Scheduling: From setting project dates to diving into the intricacies of total float calculations, and from understanding float in scheduling to adjusting baseline parameters - we have it all covered.
    Practical Insights: We'll demonstrate how to undo update progress, explain the variances in updated schedules, and guide you on converting an updated schedule back to a baseline.
    Additional Features & Support: Discover the myriad features Primavera P6 offers for handling multiple projects and learn about our WhatsApp support and communication channels for any queries you might have.
    Queries like "p6 how to remove actuals" and "How do I undo update progress in P6?" are frequent among users, and today, we're here to provide you with concrete solutions. So, whether you're a novice or a seasoned planner, this video is crafted to enhance your understanding of Primavera P6.
    For further details and assistance, do check out our closing remarks and get in touch through the provided contact information.
    Remove actuals in P6
    cannot set status to not started if activity has actuals
    How do I remove the actual start date in Primavera P6?
    How do you reset remaining duration and units to original in P6?
    How do I undo update progress in P6?
    p6 how to remove actuals
    Timestamps
    0:00 - Introduction to Softedemy and Project Control Software
    0:50 - Addressing Common Questions from Planners
    1:30 - How to Remove Actual from Updated Project in Primavera P6
    2:15 - Understanding Baseline Details in Projects
    3:00 - Challenges with Removing Progress Manually in Primavera P6
    3:40 - Demonstrating Manual Progress Removal Errors
    4:20 - Advantages of Global Change for Removing Progress
    5:00 - Detailed Steps on Using Global Change in Primavera P6
    6:00 - Handling Activities with Different Progress Percentages
    7:00 - Adjusting Parameters for Project Expenses in Primavera P6
    10:30 - WhatsApp Support and Communication Channels
    11:00 - Explanation on Updating Activities
    11:30 - The Significance of Original Duration
    12:00 - Activity Management: Schedule vs. Performance
    12:30 - Original vs. Remaining Duration: The Difference
    13:00 - Setting Project Dates for Scheduling
    13:30 - Baseline Scheduling and Understanding Float
    14:00 - Deep Dive into Total Float Calculation
    14:30 - Baseline Adjustments and Considerations
    15:00 - Resource Assignment and Budget Units
    15:30 - Comparison: Updated Schedule vs. Baseline Schedule
    16:00 - Primavera P6 Features for Multiple Projects
    16:30 - Explaining the Variances in Updated Schedules
    17:00 - How to Convert an Updated Schedule to a Baseline
    17:30 - Closing Remarks and Contact Information
    Relevant Videos Links
    How to Remove Actual from Updated Project in Primavera P6 | Remove Progress | Change Activity Status
    • How to Remove Actual f...
    Check out our channel here:
    czcams.com/channels/fte.html...
    Don’t forget to subscribe!
    CHECK OUT OUR OTHER VIDEOS
    FIND US AT
    www.softedemy.com/
    GET IN TOUCH
    Contact us on info@softedemy.com
    FOLLOW US ON SOCIAL
    Get updates or reach out to Get updates on our Social Media Profiles!
    Twitter: / faisalm15432091
    Facebook: / softedemy
    Instagram: / softedemy
    LinkedIn: / softedemy
    Telegram: t.me/Softedemy
    Contact Us
    WhatsApp:wa.me/+923155537580
    #softedemy,#Planningengineer,#primaverap6
    Disclaimer:- This channel does not promote or encourage any illegal activities and all content provided by this channel is meant for EDUCATIONAL PURPOSE only. Copyright Disclaimer: - Under section 107 of the
    Copyright Act 1976, allowance is made for FAIR USE for the purpose such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statutes that might otherwise be infringing. Non- Profit, educational, or personal use tips the balance in favor of FAIR USE.

Komentáře • 21

  • @AhmedAli-dj9jo
    @AhmedAli-dj9jo Před 10 měsíci

    Thank you so much for all your efforts

    • @SoftEdemy
      @SoftEdemy  Před 10 měsíci

      Welcome for always comments on my videos

  • @aliebrahimi787
    @aliebrahimi787 Před 10 měsíci +1

    Thanks for sharing ! very useful you are ın hurry.

  • @muhammadalikhan4011
    @muhammadalikhan4011 Před 2 měsíci

    sir kindly make vedio on how to create WBS from BOQ .

    • @SoftEdemy
      @SoftEdemy  Před 2 měsíci

      Check other interview assignment videos . Already some useful tips are their

  • @rahulnagarwal4990
    @rahulnagarwal4990 Před 6 měsíci

    How can we make copy of existing wbs without any internal changes? Becouse I’m doing this but it’s going to messy .

    • @SoftEdemy
      @SoftEdemy  Před 6 měsíci

      Just copy the WBS remove other WBs relationships just if you want

    • @rahulnagarwal4990
      @rahulnagarwal4990 Před 6 měsíci

      Thanks, but i need to make relationships as it is. And when I’m copying these are changing there sequence.

    • @SoftEdemy
      @SoftEdemy  Před 6 měsíci

      @@rahulnagarwal4990 just check the option under Relationships (only between copied activities)

    • @rahulnagarwal4990
      @rahulnagarwal4990 Před 6 měsíci

      @@SoftEdemy sir I'm making copy of a WBS but after copying activities had been changed there sequence. So how can I fix it?

    • @SoftEdemy
      @SoftEdemy  Před 6 měsíci

      @rahulnagarwal4990 please contact to my whatsapp wa.me/+923155537580
      Share screenshots their

  • @shriafwazirkhanwazir1747
    @shriafwazirkhanwazir1747 Před 10 měsíci

    sir i am unable how to get experience over Primavera please Guide me as I am regular listener of your You Tube channel Regard

    • @SoftEdemy
      @SoftEdemy  Před 10 měsíci +1

      Thanks for your comment. Please ask the question or problem you are facing

    • @shriafwazirkhanwazir1747
      @shriafwazirkhanwazir1747 Před 10 měsíci

      Sir Behfore Starting any kind of project Ie villas project what are pre requsit requirements how to start work on primavara

    • @SoftEdemy
      @SoftEdemy  Před 10 měsíci +1

      @@shriafwazirkhanwazir1747 BOQ
      Complete with measurement sheets if available
      Detailed drawings
      Specifications
      Contract Complete
      For baseline, Tendering schedule.

    • @shriafwazirkhanwazir1747
      @shriafwazirkhanwazir1747 Před 10 měsíci

      Sir have prepared any such lecture on this

    • @shriafwazirkhanwazir1747
      @shriafwazirkhanwazir1747 Před 10 měsíci

      Allah bless you many more happiness for your kind response