SGT6-8000H Gas Turbine Package - Construction overview

Sdílet
Vložit
  • čas přidán 8. 05. 2018
  • The Siemens SGT6-8000H is a high-performance gas turbine, designed for combined cycle efficiencies of 61%. Short installation times are achieved by a special focus on site assembly. Package subsystems are modularized and installed in auxiliary packages in order to minimize field assembly.
    In 16 weeks, the entire GT package is constructed. In only five months, the SGT6-8000H is ready for operation.
  • Věda a technologie

Komentáře •