Video není dostupné.
Omlouváme se.

Scorpion Load

Sdílet
Vložit
  • čas přidán 19. 08. 2024
  • To perform the scorpion load flat lay the first 50’ section and leave a tail out of the hose bed at the coupling when you reach fifty feet, this will be the stinger you grab when deploying, then continue with the flat load until completion. It is a simple load that is easy and effective.

Komentáře •