TRAVEL WITH FULL COUNTER WEIGHT 72TONS👌 LIEBHERR LTM1230-5.1 |049 yonnob TV

Sdílet
Vložit
  • čas přidán 27. 08. 2024
  • LIEBHERR
    TRAVEL WITH FULL COUNTER WEIGHT 72TONS LTM1230-5.1
    LTM1300-6.2
    LTM1100-5.2
    LTM1160-5.2
    LTM1200-5.2
    LTM1230-5.1
    LTM1250-5.2
    LTM1300-6.2
    LTM1500-8.1
    MOBILECRANE
    CRANE OPERATOR
    PINOY CRANE OPERATOR
    ALL TERRAIN CRANE AT
    ROUGH TERRAIN CRANE RT
    #LTM1230-5.1
    #LIEBHERR

Komentáře • 16

  • @Mrashaikh313
    @Mrashaikh313 Před 3 lety

    This is the best channel I have seen.
    Everything you are uploading thanks for it.
    I am also a mobile crane operator of 75 ton crane.

  • @donpitz6681
    @donpitz6681 Před 3 měsíci

    Amazing😮

  • @ACT.GROUP2
    @ACT.GROUP2 Před měsícem

    Bro LTM1450 Full video upload

  • @ajijkhan4907
    @ajijkhan4907 Před 3 lety

    Wow imaging performance this is nice crane I ask you Are Indian operators work in AMHE company

  • @jelordgodinez4714
    @jelordgodinez4714 Před 3 lety

    Good pm ka hook. Pa request nman po. Gawa ka lifting plan. Need Kasi para sa NCIII. Kukuha lng po ako idea. Salamat po ka hook. 😉

  • @tonythomas628
    @tonythomas628 Před 3 lety

    Is this in your operating manual ? U can travel with full counterweight

  • @cwb6739
    @cwb6739 Před 2 lety

    Did you lower the counterweights down on to the crane chassis?

    • @traaccee
      @traaccee Před 3 měsíci

      Never do that on liebherr

  • @marcomeleni2372
    @marcomeleni2372 Před 3 lety

    Is this crane new?

  • @marcomeleni2372
    @marcomeleni2372 Před 3 lety

    How much can a 1300 ltm cost?

  • @tonythomas628
    @tonythomas628 Před 3 lety

    Did u release the suspension lock ?

    • @traaccee
      @traaccee Před 3 měsíci

      Never ever do that while the boom is in the air

  • @nanakwameadjei6898
    @nanakwameadjei6898 Před 3 lety

    What angle did you put the boom?

    • @nanakwameadjei6898
      @nanakwameadjei6898 Před 3 lety

      @@XANDERADVENTURE so with all the counter weight attached to the machine and you driving to a different position is it save to level the crane with all the counter weight attached and work safety or you have to put the boom down and release all the counter weight?

    • @maiksteijns8610
      @maiksteijns8610 Před 2 lety

      you have to keep things in balance , to save time I figured out that I could travel with 2 sections main boom out and around 40 degrees with 25 tons of counterweight with Demag AC100. if you always look at a crane like a big scale. most important thing for traveling with counterweight attached and/or some boom out, are proper ground conditions

    • @traaccee
      @traaccee Před 3 měsíci

      Please make sure you read the operators chart book wow.