Schindler lifts at Jewel Changi Airport (Lobby C)

Sdílet
Vložit
  • čas přidán 28. 11. 2023
  • This lift was installed in 2018 when the extension for Terminal 1 was open and only the lift that has maximum stops up to 1 was open back then. There used to be a temporary corridor from Terminal 1 only leading to the first floor lobby back then.
    Manufacturer: Schindler
    Floors: B5, B4, B3, B2, B1, 1, 2, 4, 5
    Capacity: 36 persons 2450kg
    Model: 5500
    Year installed: 2018
    Rating: 50/50
    History: Original, buttons replaced
    Camera: Samsung Galaxy S23 Ultra
    Date filmed: 14 April 2023

Komentáře • 5

  • @pinkfoxy7065
    @pinkfoxy7065 Před 5 měsíci

    I like how the floor number lights up

  • @adilhossain8198
    @adilhossain8198 Před měsícem

    Is it me or does this behave like a KONE (floor starts changing once doors are shut)?

    • @caja1491
      @caja1491  Před měsícem

      Floor starts changing means it shows accelerated instead of actual position.

    • @adilhossain8198
      @adilhossain8198 Před měsícem

      @@caja1491
      Ok; in the UK, the KONEs actually do Accelerated+1; however, your average generic (EG: Lester) is on Absolute 💀

    • @caja1491
      @caja1491  Před měsícem

      @@adilhossain8198 Oh I see...