Schindler lifts at Jewel Changi Airport (Lobby C)
Vložit
- čas přidán 28. 11. 2023
- This lift was installed in 2018 when the extension for Terminal 1 was open and only the lift that has maximum stops up to 1 was open back then. There used to be a temporary corridor from Terminal 1 only leading to the first floor lobby back then.
Manufacturer: Schindler
Floors: B5, B4, B3, B2, B1, 1, 2, 4, 5
Capacity: 36 persons 2450kg
Model: 5500
Year installed: 2018
Rating: 50/50
History: Original, buttons replaced
Camera: Samsung Galaxy S23 Ultra
Date filmed: 14 April 2023
I like how the floor number lights up
Is it me or does this behave like a KONE (floor starts changing once doors are shut)?
Floor starts changing means it shows accelerated instead of actual position.
@@caja1491
Ok; in the UK, the KONEs actually do Accelerated+1; however, your average generic (EG: Lester) is on Absolute 💀
@@adilhossain8198 Oh I see...