EAST/WEST Solar System on Flat Roof - 6 Panels and Simple Inverter Step by Step.

Sdílet
Vložit

Komentáře • 3

  • @lebogangzachariamfumadi944
    @lebogangzachariamfumadi944 Před 9 měsíci

    Which mounting system are you using?

  • @whitegold79
    @whitegold79 Před 10 měsíci

    I'm looking for the same set up
    Is planning permission required?

    • @nextdaysolar3349
      @nextdaysolar3349  Před 10 měsíci

      Depends on your local authority/area, typically if it's not the highest part of the roof i.e if a chimney stack is higher, planning permission not needed. If you obtain a free quote from us here, we can give you advice on this as well (we are London based however) nextdaysolar.co.uk/pages/quote