East West Line - Tuas West Extension
Vložit
- čas přidán 8. 09. 2024
- 4 new stations, 7.5km long
Here’s a sneak preview of the Tuas West Extension opening on June 18, 2017!
Follow SGTrains:
www.sgtrains.com
blog.sgtrains.com
/ sgtrains
/ sgtrains
t.me/sgtrains
#SGTrains #TWE #EWL
I am looking forward to ride it!
nice video nice soundtrack
hyped
The Second Anniversary Of The 4 Tuas West Extension SMRT Stations [EW30 Gul Circle - EW31 Tuas Crescent - EW32 Tuas West Road And EW33 Tuas Link] Is Coming On 18 June ‘2019’.
The New 'Communication Based Train Control[CBTC] Signalling System' Has Begin Operation On The Entire East West Line[Pasir Ris>Tuas Link And Tanah Merav>Changi Airport] Since 29 April 2018 During The 5 Sundays Testing Trial.
East west line Gul Circle, Tuas Crescent , Tuas west Road , Tuas Link
in 2017
Dg Muhd Hadzrin Osman Together With The Downtown Line 3.
4 more days!!!
What font is this?
What Is This Song Called?
It's an original song composed by one of our admins :)
SgTrains I need you guys to reply this... Can u send me a link for Openbve train download?
Hey, drop a new post on our forums at forums.sgtrains.com/forumdisplay.php?fid=9 and our bve mods will follow up on the openBVE train files that you need