A Soil Investigation Work (Borehole Drilling: SPT & Rock Coring)
Vložit
- čas přidán 20. 10. 2020
- Summary: The borehole (wash/rotary) drilling is used to determine the sub-surface profile, by obtaining the SPT-N value of soil (disturbed & undisturbed samples) & rock coring. The Standard Penetration Test (SPT) will then be used to provide information on the geotechnical engineering properties of soil. When SPT encounter the rock layer (hammer rebound), coring is done to determine the quality of the rock (RQD).
Seberang Teknik Sdn Bhd is a geological & geotechnical engineering service provider based in Sibu, Sarawak Malaysia. For any enquires regarding soil investigation works, please contact us at:
G/FL. No. 3, Lorong Tunku Abdul Rahman, 8B1, 96000 Sibu, Sarawak.
Email: seberangteknik@gmail.com
Tel: +6013-6834063 (Mr. Raymond Entebang)
My best friend, I liked the video very much, thanks you for sharing, stay safe, stay blessed
Well illustrated
Nice ywe michine.. Anyway good job 👍
Đây là Khoan thăm dò phải không bạn?
Good
Everything looks fine only the think which is SPT taking technice is quite old it's consumes alot of time.and I was loved to see the CR almost 90% or May be more then that.
Regards
Muhammad Tariq
Site Geologist (STS)
PAKISTAN 🇵🇰
Sir what is the brand of your drilling machine? What type of bit you are using for coring? BTW nice to watch your video.
Thank you sir. It’s the YWE D90R drilling machine & for coring, we use the diamond core bit .
sir magandang hapon po pwd po aply sana po ako sa operator sa drillng po lamat
Hi, I’m from Kerala. I have rig but workers needed, Do you have any Rig operators and workers contact?
Give me your contact number sir
Give me your contact number sir
Sir what will be the total weight of this machine, can it be transported in mahindra bolero camper?
Require at least a 3 tonne truck to transport the SI machine & equipments. Probably won’t fit the bolero camper, sir.
@@raymondentebang6697 thank you sir. Sir manual SPT equipment can be used for bridge soil test or not?
@@prachandavibes6136 can
Sir drilling rig operator job required. I have 12 years of experience
ok you're hired
:)
Wich department
Are you Civil engineering student.....it's a geotechnical engineering
berapa Harga Permeternya Gan ?
Quotation price depends on the location & type of soil/rock formation.
Halo
Gonda se soil test kara Ho chi
MAJER Mondays
Give me the contact number of borehole machine sir pls