Martin Linge topside modules arrive in Stavanger, Norway

Sdílet
Vložit
  • čas přidán 28. 03. 2018
  • The two largest modules for the Martin Linge topside have arrived in Stavanger and the Rosenberg WorleyParsons yard. Here the modules will be prepared for installation on the field in the North Sea at the end of July. The two modules weigh 20 000 tonnes in total and the cranes rake 72 meters tall. Statoil became operator of the Martin Linge field development on 19 March 2018.

Komentáře • 3

  • @mybluebelly
    @mybluebelly Před 5 lety

    Remember seeing this docked when visiting Stavanger in june. Quite the sight.