Video není dostupné.
Omlouváme se.

The Dongo Kundu Bypass

Sdílet
Vložit
  • čas přidán 14. 08. 2024
  • Engineer Mutea takes us through the Mombasa Area Port Development Project. The project is broken down into three. The first Package was completed a while ago, started in Miriti, through Mwache and ends at the new Kipevu Container terminal. The second Package starts at Mwache and crosses over the Mwache Creek to Tsunza peninsula and ends at the end of the Mutesa Bridge. The third package starts at the Mutesa Bridge, goes through the Dongo Kundu Special Economic Zone and ends at Kibundani.

Komentáře •