Ultimate Guide to Stacking Cisco Switches in a Data Center: 3750,9200, 9300, 2960X Series

Sdílet
Vložit
  • čas přidán 8. 07. 2024
  • Join this channel to get access to perks:
    / @itindex
    IT Index is providing core networking contents .
    Cisco Catalyst 3750 Series
    Installation:
    Rack Mounting: Install the switch into a rack using the provided brackets and screws.
    Power Connection: Connect the power cord to the switch and plug it into a power source.
    Network Cable Connection: Connect network cables to the appropriate ports.
    Stacking:
    Stackwise Cables: Use Stackwise cables to connect the switches in a ring topology.
    Power On: Power on the switches. The switches will elect a master switch.
    Stack Configuration:
    switch [Number] priority [Priority Value]
    Cisco Catalyst 9200 Series
    Installation:
    Rack Mounting: Install the switch in a rack using mounting brackets.
    Power Connection: Connect the power supply to the switch.
    Network Cable Connection: Connect network cables to the switch ports.
    Stacking:
    Stackwise-480 Cables: Connect the switches using Stackwise-480 cables.
    Power On: Power on the switches
    Stack Configuration:
    switch [Number] priority [Priority Value]
    Cisco Catalyst 9300 Series
    Installation:
    Rack Mounting: Mount the switch in a rack.
    Power Connection: Connect to a power source.
    Network Cable Connection: Connect network cables.
    Stacking:
    Stackwise-480 or Stackwise-1T Cables: Use appropriate cables to connect the switches.
    Power On: Power on the switches.
    Stack Configuration:
    switch [Number] priority [Priority Value]
    Cisco Catalyst 2960X Series
    Installation:
    Rack Mounting: Use the provided brackets to mount the switch.
    Power Connection: Connect the power cord to the switch.
    Network Cable Connection: Connect the network cables.
    Stacking:
    Flex Stack-Plus Cables: Use Flex Stack-Plus cables to connect the switches.
    Power On: Power on the switches.

Komentáře • 11

  • @jonytanwer7263
    @jonytanwer7263 Před 29 dny

    Great sir 👑...big fan of you....

  • @SAURABHSINGH-wz6sh
    @SAURABHSINGH-wz6sh Před 28 dny

    We take one uplink from main switch and put uplink from switch 1 to switch 2,switch 2 to switch 3 and switch 3 to switch 4,so i think connectivity will be done

  • @akshayfitnessseries7231

    Sir 150 me ccna aur ccnp do no included hai kya

  • @gajanankshirsagar7186
    @gajanankshirsagar7186 Před 18 dny

    Sir app sdwan series kab start karnewale ho

  • @vinodhankare5231
    @vinodhankare5231 Před 22 dny

    We have used OFC patch cables for 9400catalyst for stacking. Is it possible

  • @utkarshparekh587
    @utkarshparekh587 Před 29 dny

    sir nice video ,, but try to upload more video related to data center , as recently i got job in data center , and i want to gain knowledge in these field

    • @ITINDEX
      @ITINDEX  Před 28 dny

      I will try my best and try to share this channel to others

  • @vinodhankare5231
    @vinodhankare5231 Před 22 dny

    Sir catalyst 5600 bi Stack switch hai?

  • @urvishpatel5257
    @urvishpatel5257 Před 29 dny

    Please share ppt also sir

  • @user-gv3bx3df4k
    @user-gv3bx3df4k Před 29 dny

    Good Afternoon sir , Sir try to upload the CISCO NEXUS switch and Data center connectivity