Why Airoli - Kalwa Line the Most Important Railway Project in Mumbai 🛤

Sdílet
Vložit
  • čas přidán 6. 09. 2024
  • #Mumbai #indianrailways #MumbaiRailwayProjects #InfrastructureDevelopment #AiroliKalwaLine #UrbanTransportation #MumbaiLocalTrain
    The Airoli-Kalwa Line, connecting two prominent suburbs in Mumbai, is a game-changer in terms of enhancing connectivity and easing the daily commute for millions of residents. We discuss the key features and benefits of this project, including reduced travel time, decongestion of existing lines, and improved accessibility to educational institutions, employment hubs, and commercial centers.Moreover, we shed light on the immense planning and engineering efforts that have gone into the construction of this railway line. From tunneling and station design to ensuring safety and integration with the existing rail network, we uncover the complexities involved in making this project a reality.The 8-km Airoli-Kalwa elevated rail corridor has been planned in two phases. In the first phase, the halt station of Digha that does not require land acquisition is nearing completion. While the booking office, an overhead water tank, and a retaining wall are ready, work on a bridge, subway, and platform shelter is likely to be completed by December,” an official from Mumbai Rail Vikas Corporation (MRVC) said.
    MRVC is executing the ₹476-crore corridor project under Mumbai Urban Transport Project III.
    The phase 2 that covers land acquisition and resettlement and rehabilitation of project affected households (RRPAH) needs to be completed by the Mumbai Metropolitan Regional Development Authority (MMRDA). Of the 2.55 hectares (ha) land in Kalwa and Airoli, 1.95 ha has been acquired and the acquisition of balance 0.60 ha is in an advanced stage
    🔔 Join this channel to get access to perks:
    / @powertrain
    मुंबई में दो प्रमुख उपनगरों को जोड़ने वाली ऐरोली-कलवा लाइन, कनेक्टिविटी बढ़ाने और लाखों निवासियों के लिए दैनिक आवागमन को आसान बनाने के मामले में गेम-चेंजर है। हम इस परियोजना की प्रमुख विशेषताओं और लाभों पर चर्चा करते हैं, जिसमें कम यात्रा समय, मौजूदा लाइनों की कमी, और शैक्षणिक संस्थानों, रोजगार केन्द्रों और वाणिज्यिक केंद्रों तक बेहतर पहुंच शामिल है। इस रेलवे लाइन के निर्माण में। सुरंग बनाने और स्टेशन के डिजाइन से लेकर मौजूदा रेल नेटवर्क के साथ सुरक्षा और एकीकरण सुनिश्चित करने तक, हम इस परियोजना को वास्तविकता बनाने में शामिल जटिलताओं को उजागर करते हैं। 8 किलोमीटर लंबे ऐरोली-कलवा एलिवेटेड रेल कॉरिडोर की योजना दो चरणों में बनाई गई है। पहले चरण में दीघा का हॉल्ट स्टेशन, जिसमें भूमि अधिग्रहण की आवश्यकता नहीं है, पूरा होने वाला है। मुंबई रेल विकास निगम (एमआरवीसी) के एक अधिकारी ने कहा, जबकि बुकिंग कार्यालय, एक ओवरहेड पानी की टंकी और एक रिटेनिंग वॉल तैयार है, पुल, सबवे और प्लेटफॉर्म शेल्टर पर काम दिसंबर तक पूरा होने की संभावना है।
    OUR OTHER CHANNELS
    ⚪VLOG CHANNEL - / @aakashbhavsar2342
    ⚪FOOTAGE DEMOCRACY - / @footagedemocracy3663
    ⚪SHORTS CHANNEL - / @powershorts1068
    FOLLOW US ON
    ⚪INSTAGRAM 1 - / aakash_rb
    ⚪INSTAGRAM 2- / powertrain_yt
    ⚪FACEBOOK - / powertrainofficial
    ⚪TWITTER - / powertrain_yt
    ⚪DISCORD - / discord
    _____________________________________________________________________
    INTRO MUSIC IF PRESENT - LEMMiNO - A THOUSAND YEARS
    • LEMMiNO - A Thousand W...
    CC BY-SA 4.0

Komentáře • 239

  • @akshithtalks179
    @akshithtalks179 Před rokem +47

    This project should complete fast it will help many Dombivli Kalyan and beyond ppl. Train boarding from Thane during peak hour is horrible.

    • @sanjaydns
      @sanjaydns Před rokem +1

      Katai Nakka Also In Progress

    • @Atiq_s
      @Atiq_s Před rokem +4

      Yes and management shouldn't be an issue as harbour line manages the split at Wadala pretty well. That they're saying it can be issue shows their laziness. Babus won't change.

  • @ShivBalram
    @ShivBalram Před rokem +160

    Vasai se bhi frequency badhani chahiyee panvel ke liye

    • @TheAkshayBhagat
      @TheAkshayBhagat Před rokem +7

      Pata nahi kaam chalu hai wo kab khatam hoga

    • @adbhutcivil
      @adbhutcivil Před rokem +10

      Panvel Jana hai

    • @praful_mishra_
      @praful_mishra_ Před rokem +6

      Bhai kitne Maine bola ye topic ek dadicate video banao

    • @AsperK.22
      @AsperK.22 Před rokem +4

      Kaha se bhai, nahi badha sakte frequencies, already express train ne yeh route bhar diya hai.

    • @TheAkshayBhagat
      @TheAkshayBhagat Před rokem +3

      @@AsperK.22 isliye toh kaam chalu hai

  • @theonelife7994
    @theonelife7994 Před rokem +21

    Thane to airoli is such a hectic portion of whole travelling

    • @aosaeanor
      @aosaeanor Před rokem +4

      When Navi Mumbai development began more than 15 years back shouldn't the authorities have looked at road, train & metro network & connectivity? They did not . And now when situation is as good as at crisis point they are trying to do patchwork solutions which also will take another decade or more for completion. These areas are occupied by common people who are low on the priority list of Govts.
      The undersea twin tunnels in South Mumbai are nearing completion while Thane metro is being built for more than 10 years now and is no where near even 1st phase completion

    • @Atiq_s
      @Atiq_s Před rokem

      ​@@aosaeanorcoz the authorities are babus sitting idle doing nothing, wasting public money. Same can be pointed out for their plans to link Mumbai Navi Mumbai through metro. Wait there's no plan.

  • @anky29
    @anky29 Před rokem +99

    They have already built two new platforms in Kalwa, Mumbra and Diva for trains which will run on this new line. So, i don't think there will be any management problems on these stations.

    • @phirangi91
      @phirangi91 Před rokem +18

      Those new platforms are for fast trains, not dedicated to elevated link.

    • @greenrico10
      @greenrico10 Před rokem +5

      @@phirangi91 kalwa and mumbra are not connected to the fats line though?

    • @Yatogami1_Yamato
      @Yatogami1_Yamato Před rokem +3

      @@greenrico10 Currently there are six lines till Kalyan. 2 slow, 2 fast and two for the trains going Konkan, western line and those originating from LTT. Older slow line is now the new fast line. That’s why fast trains and Mumbai, Dadar originating Express go from Kalwa, Mumbra now.

    • @zaheerbeg4810
      @zaheerbeg4810 Před rokem +2

      You are 100% right

    • @_Infocars
      @_Infocars Před 9 měsíci +2

      There will be a major management issue here. CST to kalyan has 6 tracks. 4 for local trains & 2 for express trains. Now local trains will have to cross the express lane to reach Airoli which will cause a lot of rail congestion & delays.

  • @sahilphatangare945
    @sahilphatangare945 Před rokem +4

    Dialy i have to travel from ambarnath to panvel for college , train frequency and timings sucks the most

  • @KrishnaGupta-bp1ny
    @KrishnaGupta-bp1ny Před 5 měsíci +2

    I am from Kalwa as of date 15 March , 2024 the updates are :
    *Digha station is completed and operational for trans-harbour line.
    *The process of connecting the digha and kalwa is going.
    *No reason project are running late by one year.

    • @Sid-uc5ms
      @Sid-uc5ms Před 5 měsíci

      Yes there is a reason project is running late, because it's Indian Railways. 🌚

    • @KrishnaGupta-bp1ny
      @KrishnaGupta-bp1ny Před 5 měsíci

      @@Sid-uc5ms Indian railway is very huge. That's why they divided in region and the reason for late work in this region is politics. Dirty Politics because of that slum area.

  • @mohanpursnanivishindas4857

    Shuttle services between thane towards kalyan can be increased so that crowd gets relief, alternative transport to be encouraged

  • @praful_mishra_
    @praful_mishra_ Před rokem +11

    Vasai road se bhi frequency Increase honi chahiye jo direct central line ko connect karti hai😢

    • @riyazshaikh3240
      @riyazshaikh3240 Před 8 měsíci +1

      CSt se vasai service chalu hona chahiye via koper

  • @hrushikeshavachat900
    @hrushikeshavachat900 Před rokem +8

    Everyday go from this line. It's a different life altogether.

  • @rajgor8651
    @rajgor8651 Před rokem +7

    Aaj bhi Thane station ki halat same thi because trains were delayed in harbour line

  • @girishshirwale6544
    @girishshirwale6544 Před 10 měsíci +2

    Badlapur se panvel ke bich me bhi ek suburban railway project hona chahiye.mumbai vadodara expressway jo badlapur se pass ho raha hai.uske parallel ye line hona chahiye.

  • @amitrookie
    @amitrookie Před rokem +50

    I think that Government should focus more on building transportation services and vehicles like buses trains etc and should limit the high number of lane s road or highways, because it holds a major chunk of pollution and improved transportation and 15 minutes city types of initiatives can reduce the amount of pollution and also build cities where every necessary things should be closer to people who live there so that they will use cars lesser.

    • @yashyadav6190
      @yashyadav6190 Před rokem +11

      Dhruv rathee effect 😂

    • @maari7132
      @maari7132 Před rokem +6

      Ye pakka dhruv rathee ka twisted facts sunke aya hey. Kabi kabi influence hone se acha apna khud ka dimag lagake research kro

    • @maari7132
      @maari7132 Před rokem

      Ye sab isliye kyuki India 3rf automobile industry bana hey world mey japan ko beat krke. USA ,China & Europe ko Darr satane laga hey ki hunki industry India mey jake shift na ho.isliye ab youtubers ko paise khilake pollution ka awareness fela rahe.

    • @amitrookie
      @amitrookie Před rokem +4

      @@maari7132 jab kisi ne pehle hi dimaag laga kr solution nikal liya ho toh usse use krlena hi samjdari hoti hai, agar thoda dimag lga kr tu video dekh leta ya comment padh leta toh tujhe shayad samjh aata.

    • @maari7132
      @maari7132 Před rokem +5

      @@amitrookie bhai tu rehene de tu german shepherd ka hi sunn .Terese aur kuch nhi hoga

  • @debjyotibid8105
    @debjyotibid8105 Před rokem +5

    We need 1.5 lakh Km railways line
    50K km DFC and 30K km high-speed railways by 2035

  • @DeepakShettigar
    @DeepakShettigar Před rokem +25

    #AskPT what are your thoughts on more shorter distance mumbai local trains. Like currently we have Kurla- Thane, Or Thane-Kalyan etc. More trains should be Kalyan-Karjat, CST- kurla etc etc. This really helps in lesser crowds, like people between that band only take those trains and those who wants to travle long can change it. I think people will prefer less crowd with this little inconvenience of changing trains. Earlier longer route trains made sense with economic perspective, but with growing population railway will always find ticket takers at all stations.

    • @friendeleven5711
      @friendeleven5711 Před rokem +2

      It's wastes a lot of time.
      New metro is much slower than local train even though being efficient

    • @skilz9525
      @skilz9525 Před rokem

      Karjat trains are far less that what crowd is demanding

    • @Yatogami1_Yamato
      @Yatogami1_Yamato Před rokem +1

      Once Kalyan station is revamped, we can expect more trains for Karjat, Kasara from there. Currently the platforms are not enough to originate any.

    • @_Infocars
      @_Infocars Před 9 měsíci

      Bro it's a simple logic. If there are many local trains ending at random locations which will again go back reverse, it will affect all the trains coming behind it. Causing all the trains to delay.

  • @abhisekdas435
    @abhisekdas435 Před rokem +7

    Much needed 👏👏👏👏

  • @jogindersingh1947
    @jogindersingh1947 Před rokem +30

    #askpt what are the reasons cidco is proposing metro neo instead of standard metro in NMM lines 3 and 2?

    • @AsperK.22
      @AsperK.22 Před rokem +6

      Umm there was an article by swarajya, I have to search it if I got so I could share it here. Cidco using neo metro in navi mumbai because navi mumbai is already a planned city and its road infrastructure plus bus transportation is already been in a good condition. Tough some alternate transit system is required and today navi mumbai's population is not so much or over crowded like mumbai.

    • @Atiq_s
      @Atiq_s Před rokem

      To save money as metro are suited for dense population not some retired nana nanis wanting releif from city pollution and hassle and living in sparse neighbourhood.

  • @Neonvarun
    @Neonvarun Před rokem +3

    Kalyan to Aroli will be Possible 💯,
    Nice!

  • @rohitirctc6037
    @rohitirctc6037 Před rokem +4

    Due to this project hope kalwa people will get to enter CSMT bound local train during peak hours

  • @tejasgejage8092
    @tejasgejage8092 Před rokem +1

    Right bro me ambernath me rehta hu mostly public working karti h thane vashi line PE Mera office to thane me hai but public and rush bolhat hoti hai jafa kar ke sham ko ate time morning me Jada issue nahi hota

  • @AsperK.22
    @AsperK.22 Před rokem +5

    Digha station is not inaugurated yet, hai we can think about this airoli kalwa link? 😂 even uran line is ready but nobody is there inaugurated it. None of the work have been started at other stations such as kopri and chikhloli. So sad.

  • @dattatraybelkar6341
    @dattatraybelkar6341 Před rokem +3

    Need of hour Diva-Panvel local ..

  • @myselfyuvi
    @myselfyuvi Před rokem +7

    They should also start direct trains from CSMT to Airoli ✌️

    • @RavindraJadhav1983
      @RavindraJadhav1983 Před rokem +1

      And how it will run

    • @Atiq_s
      @Atiq_s Před rokem +2

      Good point. They could build facility for circular railway that start from central csmt to Thane to vashi harbour to Kurla harbour to csmt central and vise versa. It'll be first for Mumbai.

    • @RavindraJadhav1983
      @RavindraJadhav1983 Před rokem

      @@Atiq_s bhai rail mantree banjao

    • @krishnavishwakarma4874
      @krishnavishwakarma4874 Před rokem

      ​@@Atiq_swhat about western line people

    • @_Infocars
      @_Infocars Před 9 měsíci

      Just deboard at kurla or thane & go to Airoli. Not a big deal.

  • @abhijitsalunkhe5530
    @abhijitsalunkhe5530 Před rokem

    Simple solution for complex problem. If government comes up with error free signal system most of the problems of train delays and cancellations can be solved. Just increase the number of trains and reduce the time between two trains. If trains starts running on time commuters will get big relief.

  • @RD-ij2sz
    @RD-ij2sz Před rokem +1

    Not Affected but Benefitted .

  • @O0O0-Il
    @O0O0-Il Před rokem +5

    Mumbai ko banane ke liye bahut jyada planning ki jarurat hai
    Bahut sare mastermind engineers chahie Jo Shanghai Beijing Moscow Saint Petersburg Tokyo vagera bhi ghoom chuke ho

    • @CoderBoy2004
      @CoderBoy2004 Před rokem

      Aur voo civil engineering desh chor ke Jaa rahe hai😂
      Baki bekar Wale yaha hai + neta😂

    • @O0O0-Il
      @O0O0-Il Před rokem +1

      @@CoderBoy2004
      Filhaal to sarkar kaafi Projects chalaye hue hai jaise Railways,, Parliament Central VISTA project,, Express ways smart cities,, bullet train, Diffence sector,, electronics etc.
      So wahan engineers ko kaam mil raha hai

  • @sunderlalahuja6263
    @sunderlalahuja6263 Před 6 měsíci

    Very good knowledge for Me and also for Many other people.

  • @bodhiganguly
    @bodhiganguly Před rokem +1

    Need to extend the jogeswari kanjurmarg metro to airoli and onwards to Kalyan

  • @rahulvarhade9971
    @rahulvarhade9971 Před rokem +1

    Sir Please Make A Video On Nagpur, Amravati, Aurangabad,Jalna , Railway Line Project It's Mostly Important 🇮🇳💯

  • @vivekshegle1246
    @vivekshegle1246 Před rokem +1

    Parel terminus Konkan railway kab start hoga please reply must sar.

  • @surojitdas8637
    @surojitdas8637 Před rokem +5

    MTHL ke parallel metro ya Suburban line hona chahiye tha.

    • @Atiq_s
      @Atiq_s Před rokem

      Won't happen. expect a dedicated bus lane hai ver mthl though. This is more likely.

    • @Atiq_s
      @Atiq_s Před rokem

      Over*

  • @pranit77299
    @pranit77299 Před rokem +2

    Csmt panvel fast line ka kam bhi chalu hona chahiye

  • @amitpanchal9291
    @amitpanchal9291 Před rokem +2

    Kindly make an video on new railway station which will be built between Thane and Mulund.

  • @prnva_
    @prnva_ Před 10 měsíci +2

    There is already a track which exists that connects to the fast line which is used mostly for goods trains. Railways could use this for running trains as an intermediate measure but we all know they won't do shit.

  • @pankajjoshi1209
    @pankajjoshi1209 Před 29 dny

    You didn't explain the necessity of the elevated section between Kalwa and Digha when already the trans harbour rail line is connected to Thane station.. why not let trains coming from Belapur/ Vashi run 'through' Thane station instead of terminating there.. Similarly trains coming From CSMT can be routed to Vashi / Belapur by again making Thane a through station instead of a terminal..

  • @MalleshDeshmukh
    @MalleshDeshmukh Před 7 měsíci

    For Kalyan towards issue is train need to run from both ways till Kalwa and way to Kalyan

  • @user-jd8nx6bz3s
    @user-jd8nx6bz3s Před rokem

    I am jayesh i use to live in Manasarovar in Navi Mumbai and my school is in Parel i use travel from train via Kurla

  • @adityakambli6495
    @adityakambli6495 Před rokem

    great video bhai !

  • @Iqbaltakki01
    @Iqbaltakki01 Před 5 měsíci

    This should have been connected through Diva instead of kalwa, this would help connect people coming from Vasai

  • @theatul001
    @theatul001 Před rokem +1

    Karjat to Panvel new project key upar ek video banavo sir

  • @girish5856
    @girish5856 Před 2 měsíci

    When will this project get completed?
    Since January till June in 2024, 23 people have lost their lives owing to falling from the overcrowded local trains between Dombivali and Thane stations.

  • @ranksupersix22
    @ranksupersix22 Před rokem +1

    Thane❤

  • @vighneshrajpillai8383
    @vighneshrajpillai8383 Před 3 měsíci

    NMMT is giving services to reach Navi Mumbai from Kalyan dombivali badlapur

  • @smart2767
    @smart2767 Před rokem

    A better suggestion to reduce the crowd in central especially for Thane local train should be started from Diva junction.

  • @vinitpatil4983
    @vinitpatil4983 Před rokem +3

    Bhii make a video on....
    Mumbai metro line 1 over crowded hoty hai fir bhi metro coaches kyu nhi badha Rahi hai...?

    • @abhinavpanchal6806
      @abhinavpanchal6806 Před rokem +3

      Kyuki ek aur metro lane with the parallel route progress me hai.. Vikhroli to Oshiwara metro line 6. So maybe they are waiting for it to be completed. Agar tabhi bhi nahi solve hota issue to shayad badha de

    • @vinitpatil4983
      @vinitpatil4983 Před rokem

      @@abhinavpanchal6806 Mai usi area Mai kam pe jata huu..Jo nayi metro Bank Rahi hai...jvlr road PE udhar public office sirf sepze aur Powai Mai hai...aur jo merei line 1 hai vo site chakala jb nagar gundavli midc shantinager marol Naka saki naka jarimari te side sab se jayada office hai...busses aur metro overcrowded hote hai ..aur auto ola uber bhi pick hours Mai nhi milte kisi kisi ko....

  • @samratdhamale
    @samratdhamale Před rokem +5

    Bhynder should be connected to thane too through eleveted lines

    • @sarveshd9483
      @sarveshd9483 Před rokem +1

      Jagah kaha hai?

    • @samratdhamale
      @samratdhamale Před rokem +1

      @@sarveshd9483 khadi pe se ghumana chaiye

    • @SohamSMore
      @SohamSMore Před rokem

      Metro line 10

    • @aosaeanor
      @aosaeanor Před rokem +1

      10 saal se Thane Metro ban raha hai. Ye sab hopes rakhna bekar hai. Best roads , metro & train network & connectivity sirf Bandra tak hai. Thane , Navi Mumbai etc mein aam aadmi rehte hai.

    • @Atiq_s
      @Atiq_s Před rokem +1

      ​@@aosaeanor1.3cr people from Mumbai:'Hum aam aadmi nhi'😂😂

  • @hdkloh6857
    @hdkloh6857 Před rokem +1

    I thik Metro option have a better choice instead of Indian Railway. Esp for speed-up, permissions also which comes under state-govt

    • @svcreation7606
      @svcreation7606 Před 11 měsíci

      Thane district is no 1 in highest population in india
      Local having min 12 car and maximum 15 car as compare to metro it's double no of car

  • @pranavjha7769
    @pranavjha7769 Před rokem +2

    Panvel to Thane/CST/Andheri ko fast kyu nahi hai ??

  • @Anonymous-je6tc
    @Anonymous-je6tc Před rokem +8

    Thanks, bro for the information.
    what are your thoughts abt the Odhisa train accident??
    did govt find out why it happened, and what they are going to do for the people who are affected by that accident??

    • @Md_Zahid
      @Md_Zahid Před rokem +4

      Bhai ye video nahi banayega dekh lena ye sirf government ki tareef ki videos banata hai

    • @Anonymous-je6tc
      @Anonymous-je6tc Před rokem +2

      @@Md_Zahid 😢🤦‍♂🤦‍♂🤦‍♂

    • @AdityaKantKushwaha
      @AdityaKantKushwaha Před rokem +6

      ​@@Md_Zahid
      Abe jab dekho politics
      Bhai jabtak investigation 100% nahi ho jaati tabtak koi kaise bana de video?

    • @Md_Zahid
      @Md_Zahid Před rokem

      @@AdityaKantKushwaha hmm ye bhi sahi hai

    • @soumyadeepchowdhury3585
      @soumyadeepchowdhury3585 Před rokem

      @@AdityaKantKushwaha investigation kabi thik se hoga vi nehi because of govt himself faults . Sirf BJP ki baat nehi hai baki party sab agar hota iss jagah sane hota investigation nehi hota .

  • @ansarifaisal8956
    @ansarifaisal8956 Před rokem

    Mai daily jata hoon toh dekhta hoon woh station 😂mast hai dekne se lgta future proof hai

  • @shabbirsoman5531
    @shabbirsoman5531 Před rokem +1

    IT IS A SIMPLE PROJECT BUT RAILWAYS ARE DELAYING IT TILL NOW.

  • @vijaykumaryadav5818
    @vijaykumaryadav5818 Před rokem

    Fast bola par awaj bahut clear hai, project ke baare mein bataaya, thanks🌹

  • @spandy9392
    @spandy9392 Před rokem +1

    500k soon🎉🎉

  • @soumadeepmondal4549
    @soumadeepmondal4549 Před rokem +5

    #AskPT can Mumbai reclaim more land from sea between Nariman point to Geeta nagar point?

  • @TheDailyScroll0389
    @TheDailyScroll0389 Před rokem +1

    Very informative 🎉

  • @redrevolver11
    @redrevolver11 Před rokem

    There needs to be metro line here as well since Airoli and mahape are important it parks

  • @MrReachashish
    @MrReachashish Před rokem

    All this should have been done in 2000's. Not now. We are 20yrs behind , our population is growing much faster than development. And to top it, the slums is also increasing . 20 yrs ago, hardly anyone used to get on or off at Diva station. Same for kalwa. Look at it now.

  • @manoharune6381
    @manoharune6381 Před rokem

    I think you are not ware 6:19 -> The 5th & 6th Lines are extended from Thane - Diva on 19th Feb 2022 by Hon. PM Modi, and now all six line services are available from CSMT to Kalyan Jn.

  • @HigherSelf-hd3or
    @HigherSelf-hd3or Před rokem

    ओव्हर bridge बनाना पडेगा कळवा मे, तो ही crossing का issue solve होगा।

  • @abhishekgorale4722
    @abhishekgorale4722 Před rokem

    Helpful information.

  • @Sunnyfreezo
    @Sunnyfreezo Před 2 měsíci +1

    Sabse pehle morning m local jaldhi shuru kro Airoli se thane k taraf

  • @anant_shinde
    @anant_shinde Před rokem +5

    #AskPT What if the Mumbai local railway network will be privatized, what are the pros and cons?

    • @rithvikrao7416
      @rithvikrao7416 Před rokem +4

      More cons for sure

    • @rithvikrao7416
      @rithvikrao7416 Před rokem

      Mumbai trains run 3-4 times theor capacity do you think any pvt company would allow this?it would eventually lead to more congestion and traffic

    • @myselfyuvi
      @myselfyuvi Před rokem +1

      You can't privatize everything!

    • @aosaeanor
      @aosaeanor Před rokem

      Private sector would do a much better job.

    • @ranksupersix22
      @ranksupersix22 Před rokem

      ​@@aosaeanorhahaha nyc jokes boss😂

  • @user-lc6vj4tg9i
    @user-lc6vj4tg9i Před rokem +3

    Why can’t they use existing line through Parsik Tunnels connecting Kalyan through Diva?

    • @phirangi91
      @phirangi91 Před rokem

      Now parsik tunnel is dedicated to mail/Express and freight. And it will miss out commuters from kalwa and mumbra. Also that line is single line not used by local trains.

    • @rrajdippawskar9853
      @rrajdippawskar9853 Před rokem

      @@phirangi91 Mail and express trains use the fast line from Kalwa-Mumbra area. Superfast trains and trains from LTT are the only passenger trains which use Parsik tunnel now. Rest are freight trains.

    • @aosaeanor
      @aosaeanor Před rokem +2

      Navi Mumbai is a mess where road, train & metro network & connectivity are concerned. And this area will continue as is with patchwork solutions & super slow Infra projects. Common people stay in these areas & their value is only votes which they easily get manipulated to give for stupid reasons
      CM Eknath Shinde & his son Srikant's constituencies are in & around Thane since long. Even then Thane Metro is under construction for more than 10 yrs & the 1st phase is no where near completion.
      While the Undersea twin tunnels in South Mumbai is nearing completion . It starts at Girgaon extending north under the Arabian Sea, Girgaon Chowpatty & Malabar Hill ending at Breach Candy.
      Why the urgency ? Coz it's convenient to the wealthy & the powerful people such as politicians who live in South Mumbai.
      Even the high-speed coastal road network will complete at super speed till the point its convenient to people living in these affluent areas.
      Post that the project will be at snail's pace and at best will be a trimmed down version of what exists in the 1st part. .

  • @Sbdbdn20
    @Sbdbdn20 Před rokem +3

    2:40 video ka bich mai intro kyo dete ho

  • @om4136
    @om4136 Před rokem +3

    #Askpt what upgrades did Indian police needs?

    • @maari7132
      @maari7132 Před rokem

      First of all give them a drees which didn't need to press and shoes which didn't need to polish.

  • @dindayalram8796
    @dindayalram8796 Před 6 měsíci

    Sabse Accha hoga diva-parsic tunnel-digha rail link hona chahiye

  • @bmmilind4333
    @bmmilind4333 Před rokem

    Why not plan a Borivali - Thane rail line along with the new proposed road through national park

  • @SD-hx5ps
    @SD-hx5ps Před rokem

    Delhi like metro connectivity is need of the hour but given the situation in Mumbai n Mmr i seems difficult

    • @_Infocars
      @_Infocars Před 9 měsíci

      14 lines already under construction dude

  • @riyazshaikh3240
    @riyazshaikh3240 Před 13 dny

    Vasai panvel to teenu line ko connect karti hai isko to aur jaldi Banana chahiye.

  • @sunilkumarmishra1553
    @sunilkumarmishra1553 Před rokem +3

    I was expecting complete detailed video on Odisha train incident

  • @avionserrao7943
    @avionserrao7943 Před 6 měsíci

    Don't know why the hell railways made 2 extra platforms at kalwa. That could be used for bringing fast locals at those point for every 15 minutes. It could even help mumbra and diva commuters as well. This will be also helpful in reducing travel time and cost. Don't know but I feel railway guys are sleeping.

  • @hypocrite5873
    @hypocrite5873 Před rokem +4

    Make small cities 😀

  • @shiekkaleem4539
    @shiekkaleem4539 Před 8 měsíci

    #AskPT can u create video about kalyan yard remodeling

  • @aryanchettiar
    @aryanchettiar Před rokem +1

    Bro could make a video on pod taxi concept

  • @nazim0936
    @nazim0936 Před rokem

    6:50 elevated station like Sandhurst Road, can be created at Kalwa? Is it possible?

  • @C02754
    @C02754 Před rokem

    Thank you

  • @indiafirst5545
    @indiafirst5545 Před rokem

    There is an urgent need for Shilphata train connectivity.

  • @abubakarshaikh1638
    @abubakarshaikh1638 Před rokem

    very nice info

  • @user-fb8jv1tt8e
    @user-fb8jv1tt8e Před 7 měsíci +1

    Diva junction better' opinion from Kalwa stion

  • @_sachinbhalerao
    @_sachinbhalerao Před rokem

    Make video on Badlapur 😅

  • @ravindrabansod3007
    @ravindrabansod3007 Před 2 dny

    दिघा स्टेशनसे सिधा दिवा स्टेशन क्यु नही जा सकते ?
    व्हा रेल्वे लाईन भी मौजूद है.
    पारसीक टनेल से रेल्वे पास हो सकती है.

  • @user-cu6uk1fg9c
    @user-cu6uk1fg9c Před 2 měsíci +1

    Whole railway network needs remodelling.....

  • @11dharam11
    @11dharam11 Před 6 měsíci

    Why not Diva to Airoli.

  • @dashrathpatil9502
    @dashrathpatil9502 Před 6 měsíci

    लवकर रेल्वे लाईन चे काम झाल्यास कल्याण पनवेल लोकल कल्याण वाशी लोकल कल्याण उरण लोकल वसई वाशी लोकल रेल्वे सुरू होईल होतील

  • @msandeepvlogs
    @msandeepvlogs Před rokem +1

    Such small but big impact projects should be escalated for development

  • @RavindraJadhav1983
    @RavindraJadhav1983 Před rokem

    Very true ❤

  • @shabbirsoman5531
    @shabbirsoman5531 Před 7 měsíci +1

    SINCE 2014 THIS PROJECT IS DISCUSSED AND ALREADY APPROVED BUT NITHING HAS BEEN DONE TILL DATE ON THE GROUND EXCEPT TALKING AND CZcams VIDEOS.

  • @skagrawal3343
    @skagrawal3343 Před rokem +2

    Bhai thoda slow bolo

  • @SSRealLifeVLOGS
    @SSRealLifeVLOGS Před rokem

    Wow 😊

  • @sunilkumargupta7980
    @sunilkumargupta7980 Před 11 měsíci

    Any update on this project?

  • @dnyaneshwarsaste3945
    @dnyaneshwarsaste3945 Před 6 měsíci

    Power Train🚫 power Train Mumbai ✅

  • @parthmehta3774
    @parthmehta3774 Před rokem

    #askpt 1.i am speaking with context of mumbai
    -
    In Mumbai we have many pagdi system buildings , want to understand complete law which helps tenants raise there concern and every tenant can have its own home redeveloped.
    2.near railway trains tracks there are many legal buildings and structures which are legal and shaking due to high speed rail which may lead to collapse of building, buildings are in dilapidated condition,help us know how can one raise the concern and avail accommodation.
    3.context is if building is dilapidated the building will be destroyed but what about people living inside the building,is there any protection available for them??
    4.what happens to buildings which when go old by 99 years ,like currently small buildings are destroyed and new are made ,which helps builder make money ,bt what about buildings which are already more than 22floors and become dilapidated.
    What happens in developed nation??
    5.nead complete knowledge of pagdi system, request to help us with series of videos and medium over which people can discuss the queries .

    • @kamleshbhandari3229
      @kamleshbhandari3229 Před rokem +1

      The tenants or landlord can approach MHADA to repair the dilapidated structure if the building is a Cessesd Building (i.e., the tenants and landlord are paying Repair Cess to MHADA). If it’s not Cessed Building, tenants must come together and explore options for builder-led redevelopment or self-redevelopment.

    • @parthmehta3774
      @parthmehta3774 Před rokem

      @@kamleshbhandari3229 they spent money and show bills and take sign of building members as well few members of building are just nonsense .so nothing much changes happen with that repair money

  • @ketanpatil6219
    @ketanpatil6219 Před rokem

    Make video on uran

  • @basshunterdota625
    @basshunterdota625 Před 7 měsíci

    Navi Mumbai should be slum free.

  • @Aditya_maurya1
    @Aditya_maurya1 Před rokem +2

    Bhai Titwala Asangaon ko to koi bhaav hi nahi deta 😢

    • @johnchrist-cn8ql
      @johnchrist-cn8ql Před 4 měsíci

      most BTful suburban section in india with hilly views is Kalyan Kasara section

  • @jamchemistry
    @jamchemistry Před rokem

    Bhai
    Mujhr ek batao pahle
    Mai Dombivili se nikla aur jaana hai ghansoli, to mere ko Dombivili se direct ghansoli train available rahega ki mai pahle Dombivili se kalwa jaaunga aur fir kalwa me change ker ke dusre platform per jaakar ghansoli jaane wali train padunga? Ye batao jara

    • @pumred
      @pumred Před rokem +2

      You directly catch kalyan-panvel train from dombivili to ghansoli. No need to change train in kalwa.

    • @DivyankaParulekar
      @DivyankaParulekar Před rokem

      ​@@pumredye abhi decided nhi hai ki train kidhar tak chalana he

  • @bharatwaghmare3891
    @bharatwaghmare3891 Před rokem +1

    It's main line not central line

  • @dawntreader8370
    @dawntreader8370 Před rokem +2

    mujhe kya mai toh borivali wala hoon😂

  • @SwastikKumar-nx3bw
    @SwastikKumar-nx3bw Před rokem

    Thane is like, Rajiv chowk of Mumbai 😅😅😅

  • @rizwanshaikh1423
    @rizwanshaikh1423 Před rokem

    Bhaiii gansoli se bhi ho sakta h ye toh cut

  • @dindayalram8796
    @dindayalram8796 Před rokem

    Thane 💪