Video není dostupné.
Omlouváme se.
Delhi Dehradun Expressway | Khajuri To Eastern Peripheral Expressway | Phase 1| Travel Logs |
Vložit
- čas přidán 3. 04. 2024
- Delhi Dehradun Expressway | Khajuri To Eastern Peripheral Expressway | Phase 1| Travel Logs |
The Delhi-Saharanpur-Dehradun Expressway is an under-construction 210 km long 12-lane (Delhi to EPE & 6-lane access controlled expressway in India with operational speed limit of 100 kmph (Designed for vehicular movement at 120 kmph) between Delhi and Dehradun. The expressway is spread across the states of Delhi, Uttar Pradesh and Uttarakhand and passes through cities such as Baghpat, Baraut, Shamli and Saharanpur. It also has two additional spurs - 50.7 km long 6-lane Saharanpur-Roorke-Haridwar Expressway and 121 km long 6-lane Ambala-Shamli Expressway.
A 12 km-long elevated corridor will be constructed un the Rajaji National Park to protect wildlife, thus it will be the first highway in India to have a wildlife protection corridor, and also Asia's longest wildlife elevated corridor of 12 km for unrestricted wildlife movement. After completion of this expressway, the distance between the two cities would be reduced from 235 km to 210 km, while journey time would be reduced from 6.5 hours to only 2.5 hours.
Length - 210 km (130 mi)
Number of Lanes - 6 lanes (extendable to 8 lanes)
Construction
The Expressway is proposed to developed in three phases:
Phase I - brownfield: 32 km long 12-lane stretch between Akshardham (Delhi) & proposed EPE Junction.
Phase II - greenfield: between proposed EPE Junction in Delhi and Ganeshpur near Saharanpur bypass.
Phase III - greenfield: Expressway Stretch between Ganeshpur near Saharanpur bypass & Dehradun.
This 210 km long expressway has two additional spurs.
Main route Delhi -Saharanpur-Dehradun Expressway:
Delhi-EPE: 12-lanes from Akshardham Temple Delhi to 32 km away intersection at Kherka with Eastern Peripheral Expressway (EPE) near east of Baghpat. 6.4 km long Geeta Colony to Khajoori Khas is elevated.
EPE-Saharanpur: 118 km long route with 6-lanes, 7 interchanges and 60 underpasses from EPE to Saharanpur east bypass via
Khekra (Baghpat eastern bypass),
Lohadda (Baraut eastern bypass),
Karaunda Mahajan (intersect NH709A Karnal-Meerut),
Khyawari-Gogwan Jalalpur (just east of Thanabhawan on UP-SH12 Panipat-Muzaffarnagar),
Sohanchida Mast at 108 km milestone (spur to Saharanpur-Roorke-Haridwar Expressway),
Latifpur Aht (next to Lakhnaur on Saharanpur east bypass, at 119 km).
Saharanpur-Rajaji National Park: 40 km long route with 6-lanes from Saharanpur east bypass to Ganeshpur in NH307 Latifpur Aht at southern entrance of Rajaji National Park.
Rajaji National Park- Dehradun: 19.5 km long route runs through a 2-tube tunnel of total 2.322 km length, then 4.82 km long 4-lane elevated flyover of 6m vertical clearance underneath for elephants and wildlife, then 2.12 km at grade hill route, & 340m single-tube tunnel.
Spurs: two spurs.
Ambala-Gangoh-Shamli Expressway part of larger Bareilly-Ludhiana Economic Corridor: This 121.786 km long spur is part of 450 km long 6-lane Bareilly-Ludhiana Economic Corridor (Bareilly-Ludhiana Expressway), which is partially access-controlled, partially greenfield & rest upgrade of brownfield highway with March 2026 deadline. It has 3 sections, 90 km brownfield upgrade NH44 Ambala-Ludhiana, 121.78 km greenfield Ambala (Sadopur)-Shamli (Gogwan Jalalpur), 220 km greenfield Shamli (Gogwan Jalalpur)-Bareilly. Its future phase is Bareilly-Gorakhpur, which will connect with Siliguri-Gorakhpur Expressway. This spur begins at
Sadopur in north of Ambala,
then runs as the northern & easetern bypass (Panjokhra) of Ambala,
southwestern byass of Saha,
southwestern bypass of Barara (with additional spur from Barara to NH344 by upgrading HR-SH4),
western bypass of Radaur (east of Ladwa Kurukshetra),
Chandro (bridge on yamuna),
eastern bypass of Gangoh,
to Delhi-Saharanpur-Dehradun Expressway at Gogwan Jalalpur just east of Thanabhawan in Shamli district.
Saharanpur-Roorke-Haridwar Expressway: 50.7 km route begins at Sohanchida Mast from 108 km milestone of Delhi-Saharanpur-Dehradun Expressway southeast of Saharanpur, forms north bypass to Roorke, and ends at Bahadarabad on Haridwar west ringroad.[7] This will have direct connectivity with the proposed Haridwar International Airport in the south or Haridwar, which will come up by 2030.
#travellogs #delhidehradunnewupdateexpressway #delhidehradunexpressway
Watching from dehradun
So nice of you
interesting traveling Vlog
Beautiful sharing
Bahut acha devlopment
Very beautiful vlog video thanks for sharing
Bahut hi sunder vlog
Amazing
Beautiful traveling vlog
Bahut hi Sundar travel Vlog 👌 Keep Sharing 👍
Wow really very impressive vlog
Bahut hi sundar video banaya aapne ji mujhe aapki video bahut hi achhi lagi hai
An enjoyable traveling video with very good explanation thanks for sharing 👌👌
Bahot hi badhiya travel vlog 😊
Bahut hi badhiya vlog video super sir ji
So wonderful travel vlog 👌🏻
Nice expressway 😊
Amazing vlog I just love it
Very nice travel vlog.
Keep sharing
Beautiful 😊❤
Beautiful vlog thanks for sharing
Really helpful and interesting.
Aapki video hamesha bahot hi interesting video hoti hai thanks for sharing 🎉
Your videos always interesting & enjoyable 👍👍
Enjoyed your video 🎉
I eagerly await your uploads
Nice Video ji
Very helpful information 👍
Very nice vlog thanks for sharing 😊
Very nice update. This is a good quality channel for Delhi Dehradun Expressway. Thanks for update on Delhi Dehradun Expressway including Mandola Vihar Yojna ❤❤❤
So nice of you
Nicely explained👍
Thank you 😊
So beautiful and interesting traveling Vlog 👍 keep sharing
Bahut hi sunder vloging video sharing thanks
Bohot achhi lagi puri journey
Aapke vlog cum outing cum info cum entertainment ka yeh full package mujhey behad pasand aata hai। safely drive karte huye ek achhi video bnana kafi mushkil kary hai
It's Pavi Tiraha Not Loni Tiraha Nice Update 👍
👍
bhai music kafi jyada hai usko thoda slow karo
यस, नेक्स्ट टाइम 👍🏻
ky lgta h bhai, y kam kb tk khtm ho jyga?
Dec 2024 tak start krne ki deadline hai
phase1 may end tk expected hai start hona
@@niketk6581 pura expressway Dec 2024 tak ki deadline hai
Beautiful travel vlog