Pollock Cranes TRT ESS Modular Platform Trailer transporting a 150T Bridge

Sdílet
Vložit
  • čas přidán 22. 08. 2024
  • Pollock Cranes loaded a 150T bridge using their GMK6400 (400T Crane) and GMK6300L (300T Crane) in their Auckland yard. Their team transported it using a split trailer configuration with a 4 axle ESS Lead Module and a 4 + 2 (6 Line) rear module with its own power unit.

Komentáře •