Assembly Line Balancing English

Sdílet
Vložit
  • čas přidán 23. 05. 2018

Komentáře • 34

  • @niharikarini2045
    @niharikarini2045 Před 10 měsíci +3

    I understood this very well after watching your video,,,thank u very much

  • @shresthadatta8653
    @shresthadatta8653 Před 5 měsíci

    Thank you so much for the video it helped me a lot ❤ kudos to you keep it up!!!!❤

  • @TheSahilShinde
    @TheSahilShinde Před 6 měsíci

    Amazing!

  • @AJ-et3vf
    @AJ-et3vf Před rokem +1

    great video. thank you

  • @AbdullahKhan-zz3bt
    @AbdullahKhan-zz3bt Před rokem +1

    great teaching bro

  • @hamdankamil955
    @hamdankamil955 Před 3 lety +1

    Sangat membantu, thanks a lot!

  • @hillkadomena5357
    @hillkadomena5357 Před rokem

    God bless you greatly

  • @vishwajayasundara1811
    @vishwajayasundara1811 Před 3 měsíci

    crystal clear❤

  • @knowledgecentre2907
    @knowledgecentre2907 Před 4 lety

    nice explanation

  • @abdihassan8536
    @abdihassan8536 Před 2 lety +1

    thank you brother

  • @Education-nz9fn
    @Education-nz9fn Před 2 lety

    Why u were cutting the 90 sec of idle time ?and how did u get 30 idle time for F?

  • @peacevlogs8254
    @peacevlogs8254 Před 17 dny

    120 units in a 40 hour - week
    How to calculate this?

  • @chriswiddajonathan8941

    daghang salamat = terimah kasih
    many thanks from philippines, professor! you helped me out with my thesis.
    you're awesome, sir!!!

  • @ZeoGarcia
    @ZeoGarcia Před rokem

    thank you

  • @chuaquan827
    @chuaquan827 Před 3 lety

    Can I ask let think in reality. The first product will need 400 seconds cuz each station needed waiting for the precedent ones to start working. From the 2nd product, every 100 seconds there will be a product go out of the assembly line. Therefore, we cannot meet the desired output per day (Cuz 400 seconds instead of 100 seconds for the first product each day). Am I wrong?

  • @emutairemichael3624
    @emutairemichael3624 Před 3 měsíci

    Thanks🎗

  • @youthrevivalforchrist4922

    very informative. thank you :)

  • @jerinjoseph9120
    @jerinjoseph9120 Před 4 lety +1

    if a process is having both machine and man time combined for example process A is having man time 5 sec and machine time 15 sec in total 20 secs , man will be waiting for the 15 sec for next process

    • @AdiTV-r5o
      @AdiTV-r5o  Před 4 lety

      yes, because the man could only waits when he/she are idle or not operated

  • @vaibhavkhairnar142
    @vaibhavkhairnar142 Před rokem

    Txn sir

  • @alin8387
    @alin8387 Před 4 lety +1

    Hi, this video helped me a lot. Question, is there anytime when none of them are eligible? like say for instance, B was not eligible in station 2? is this possible?

    • @AdiTV-r5o
      @AdiTV-r5o  Před 4 lety

      do you mean, "is that possible that non of the processes that doesn't have any Predecessor?"
      In short, there will be one or two or even more processes that shouldn't have any predecessor while the rest of them are had it. It all depends on the case

    • @alin8387
      @alin8387 Před 4 lety

      @@AdiTV-r5o Thanks for your reply. I actually meant, if its possible to have a process that does have a predecessor to not have any "proses ready" or in other words a "feasible task". You know how you list the proses ready in station 2 for C. C has a proses ready of B and the only feasible task is B, what if B was not possible? Does this ever occur that there is no feasible task? I hope i explained myself good enough. Thanks for your help.

    • @AdiTV-r5o
      @AdiTV-r5o  Před 4 lety

      ​@@alin8387 If there are no feasible task, then if you learnt from "Project Management" course, that particular task/stasion (or whatever you want to call it) which has no feasible task, may occur on some condition. But in term of production planning and inventory control (PPIC), such case is rarely happened because what we try to find out here is the assembly line which is consider as the main process. so if theres any process/step which has no feasible task, wouldn't be count in this term. it depends on what are you going to do from such case.
      Well I'll make it easy.. the case that you've been asking, are happening in real situation, but depends on what are you trying to observe, it may be count or not.

  • @lightofheaven4381
    @lightofheaven4381 Před 2 lety +1

    Hi this video helped me a lot
    I just want to ask questions
    Is it necessary to start letter "A" as ther first task by the first station or is it dependent on what letter has the longest process time?
    Thank you

    • @TheSahilShinde
      @TheSahilShinde Před 6 měsíci +1

      First you have to start with the processes who doesn't have predecessor (here it is A and B), if there are multiple such processes, then choose the one with the highest process time ( here we have selected A) and then keep going.

  • @hayabusa9954
    @hayabusa9954 Před 3 lety +1

    Good explanation

  • @selmaa.g4253
    @selmaa.g4253 Před 3 lety

    Nice , I need ur social media accounts?

  • @shofiyyah23
    @shofiyyah23 Před 2 lety

    36000? bukan 3600?

  • @anandrajak3829
    @anandrajak3829 Před 5 lety +1

    Why workstation is total have taken 4

    • @AdiTV-r5o
      @AdiTV-r5o  Před 5 lety +1

      it's on the 3rd step, you must determine it by dividing the process time with cycle time. its on 05:36

    • @NusratJahan-mr5rb
      @NusratJahan-mr5rb Před 3 lety +1

      3.9 is decimal number workstation can't be fraction that is why 4 is written

  • @adityadixit5445
    @adityadixit5445 Před 9 měsíci

    open na noor

  • @gulammahmood2494
    @gulammahmood2494 Před rokem +2

    are you getting it what are you saying... plzz do try something else i m sure this is not your area of interest.