Driving Steel Sheets for Seawall

Sdílet
Vložit
  • čas přidán 6. 11. 2014
  • ABYC members replacing the seawall.

Komentáře • 130

  • @billsparks5236
    @billsparks5236 Před 4 lety +48

    OMG,! What a Mickey Mouse operation!! I was a pile driver operator for nearly 20 years and I could have put down half a dozen sheets by this time

    • @AllAccessConstruction
      @AllAccessConstruction Před 4 lety

      Hey you gotta start somewhere.. Ijs

    • @johnhall3393
      @johnhall3393 Před 4 lety +3

      WITH ONE EYE SHUT NO DOUBT, GLAD I ANT PAYING THEM.

    • @peterwill3699
      @peterwill3699 Před 4 lety +2

      What do you want they are ilegalls.

    • @bcoleman8917
      @bcoleman8917 Před 4 lety +2

      and at 2:50 - the guys wrist is laying on the top of the piling and 6 inches beneath the boom attachment! one bump of a control lever and that hand would be pinched off.

    • @nicolasmajestral9954
      @nicolasmajestral9954 Před 4 lety

      HAHAHAHAHA you are right..

  • @bootsmclaughlin1438
    @bootsmclaughlin1438 Před 4 lety +29

    Must be gettin paid by the hour

  • @grantparnes
    @grantparnes Před 4 lety +2

    RE-name video to watching paint dry.....................and then I read the other comments and 100% of you said it before I did. I need a nap after watching this. Brutal

  • @ronaldcarson4360
    @ronaldcarson4360 Před 4 lety +8

    I remember my first day on the job too.

  • @tommcadam9897
    @tommcadam9897 Před 4 lety +32

    Got to be a union job.

    • @hudsonhawk0016
      @hudsonhawk0016 Před 4 lety +4

      Wrong scab, as an Operating Engineer, I work with Dockbuilders daily, and these clowns are not dockies. I can guarantee you somebody got seriously injured before this job was done.

    • @digger105337
      @digger105337 Před 4 lety +1

      No, I was a union member IUOE. This has municipal job writing all over it!🤣
      Hudsonhawks got it right. People don't know real Union workers, they think municipal employees are what union looks like. WRONG!

  • @neillpotts6019
    @neillpotts6019 Před 4 lety +4

    The British Labour Party would be proud of this video. Never seen such a bunch of Nicky Mouse works in my life!

  • @kmb1949
    @kmb1949 Před 5 lety +16

    A good way to lose a hand. Stupid, Stupid, Stupid. They make an auto release to disconnect from the pile.

  • @stewartmcmanus3991
    @stewartmcmanus3991 Před 4 lety +7

    I was about to say everything underneath but it's all been said, I've never seen such a lot of buggerising about in my life !!!

  • @hotdogger420
    @hotdogger420 Před 4 lety +5

    These are all volunteers at a yacht club...no rush

  • @mrdeplorable6262
    @mrdeplorable6262 Před 4 lety +15

    "Driving Steel Sheets for Seawall", watching the slowest job ever, got to 3:59 no driving yet.

    • @BinoDK
      @BinoDK Před 4 lety +2

      9:07 hammer time slower than slow

  • @timmayer8723
    @timmayer8723 Před 4 lety +8

    Fast enough for government work.

  • @VictorMiranda-yt6xe
    @VictorMiranda-yt6xe Před 4 lety +3

    Best GOLDBRICKS working for the government. I want those slowpokes to go get my
    funeral, so it will never come and I will live forever.

  • @chpatriot9878
    @chpatriot9878 Před 4 lety +2

    also so einer "Rentner-Truppe " zu zuschauen, ist so was von schlaffördernd! Gute Naaaacht! Uahh!

    • @funkeb.1512
      @funkeb.1512 Před 4 lety

      ja veraltetes ,Zeitaufwendiges System!! Teure Baustelle,gut für die Firma!!

  • @mckeehan1943
    @mckeehan1943 Před 4 lety +6

    It's got to be Union workers or city workers 3 men was all they needed for this job

    • @shopshop-lx9hj
      @shopshop-lx9hj Před 4 lety +3

      plus a couple of management type guys.

    • @JungleYT
      @JungleYT Před 4 lety +1

      Somebody's gotta hold the clipboard and keep track of the Breaks!

    • @bigredc222
      @bigredc222 Před 4 lety

      If it was a union job they would at least have a real ladder.
      Is that ladder even OSHA approved?

  • @simonchant761
    @simonchant761 Před 4 lety +50

    I'd be embarrassed to show this video

    • @eamonnmcandrew7800
      @eamonnmcandrew7800 Před 3 lety

      It's a blinder haha
      No harness anywhere love the ladder
      No hi vi maybe a hand rail somewhere perhaps but apart from all of that h and s aspect its excruciating to watch
      So slow and haphazard mind you I suppose its cheap until it goes wrong

  • @digger105337
    @digger105337 Před 4 lety

    So cute! Lil baby sheet piles.

    • @Laguna2013
      @Laguna2013 Před 2 lety

      Can you share a link of the real deal stuff like they have around Lake Michigan in Chicago? I don't know where to begin looking I need this at my home thanks

  • @jerryrolen9639
    @jerryrolen9639 Před 4 lety +4

    Must be paid by the hour.

  • @dwightarnold6980
    @dwightarnold6980 Před 4 lety +1

    Did this back in the Early 70,s on The Francis Scott Key Bridge But on Alot Bigger Scale , But With Much Bigger Equipment ,

  • @davidbowen4848
    @davidbowen4848 Před 4 lety +3

    Ever herd the saying It’s like watching paint dry lol

  • @lazarussalazar6802
    @lazarussalazar6802 Před 5 lety +1

    Is that omega type sheet pile?

  • @rexhavoc2982
    @rexhavoc2982 Před 4 lety +3

    Simon is right. this could be a WTF is wrong with this, classroom discussion.

  • @SG-uh6sw
    @SG-uh6sw Před 5 lety +5

    Did the excavator complete the job ? All that welding while connected to the sheet pile not good for the computer

    • @gregoryclark2692
      @gregoryclark2692 Před 4 lety +1

      every aspect of this operation is WRONG WRONG WRONG!!!! Fire that entire crew before someone gets killed or mamed!!!!!!!

  • @gregoryclark2692
    @gregoryclark2692 Před 4 lety +16

    wtf? must be a "how not to do" video

  • @suyesuay9813
    @suyesuay9813 Před 4 lety

    In general the work very slow these guys are well experienced plus the machine.

  • @feliciajohnson6350
    @feliciajohnson6350 Před 4 lety

    Cool page🔝

  • @williamcantalamessa5231
    @williamcantalamessa5231 Před 4 lety +3

    That is not a sheet pile hammer ! That's for tamping ground, ya its working.

  • @hanslund2651
    @hanslund2651 Před 4 lety

    Working method looks as from the past !

  • @BRI33NOR
    @BRI33NOR Před 4 lety +4

    If it was my job to fasten the sheets to the crane thingy, I would want to know the operator had his hands and feet well clear of the controls. Fingers !!!.

    • @kaisonduncan7151
      @kaisonduncan7151 Před 2 lety

      you probably dont give a damn but does someone know a method to get back into an instagram account??
      I was dumb lost my account password. I appreciate any tricks you can offer me

    • @frankaldo481
      @frankaldo481 Před 2 lety

      @Kaison Duncan Instablaster :)

    • @kaisonduncan7151
      @kaisonduncan7151 Před 2 lety

      @Frank Aldo thanks so much for your reply. I got to the site thru google and Im trying it out atm.
      Looks like it's gonna take quite some time so I will reply here later with my results.

    • @kaisonduncan7151
      @kaisonduncan7151 Před 2 lety

      @Frank Aldo it worked and I finally got access to my account again. Im so happy!
      Thanks so much you really help me out :D

    • @frankaldo481
      @frankaldo481 Před 2 lety

      @Kaison Duncan you are welcome :)

  • @georgesingh826
    @georgesingh826 Před 4 lety

    Is that steel sheet? Or recycle milk tin?, In what country are they doing that?

  • @Fujifilmable
    @Fujifilmable Před 4 lety

    29/01/2020 have they finished the job yet?

  • @fishawk90
    @fishawk90 Před rokem

    Can these be use to build a dock by the ocean?

  • @JungleYT
    @JungleYT Před 4 lety +1

    Talk about *milking* a F*cking job! No wonder these projects cost so damned much... Whatta ya know, *"It's "Break Time!"*

  • @thomasgross8525
    @thomasgross8525 Před 4 lety +5

    Union job

  • @davidpiotrowski7906
    @davidpiotrowski7906 Před 4 lety +2

    Gloves ??

  • @robertgregory2618
    @robertgregory2618 Před 4 lety

    Get a decent ladder already.
    Good way to loose a hand, then got a kick out of that guy waving up and down with his hand, like it wasn't obvious the driver guy couldn't see what was going on.

  • @pynetripp9323
    @pynetripp9323 Před 5 lety +12

    how is it that now a plate compactor is an accepted method for pile driving? What a joke.

    • @chriscartwrightnewideas
      @chriscartwrightnewideas Před 4 lety +2

      I don't know and I agree

    • @donatocamacho1731
      @donatocamacho1731 Před 4 lety

      Pintura impresionista

    • @rex69832
      @rex69832 Před 4 lety

      It's not a plate compacter although a plate compacter may achieve the same ends. It is a purpose-built vibrating mechanism used to drive piles more quickly. First time I saw it in action I couldn't believe it. They were using it to drive huge I-beams into frozen ground. Like a hot knife through butter. Amazing!

    • @danielroe845
      @danielroe845 Před 3 lety

      It's quite common in Holland. But they run counter rotating eccentric vibrators, essentially the same internals as a proper piling hammer but more interchangeable for different piling. Admittedly, this isn't that. That's just a compactor plate contrary to what another comment says. Absolute shit show

  • @johnmoore8016
    @johnmoore8016 Před 4 lety +2

    Still wondering what is going on here.

  • @lathamarea1437
    @lathamarea1437 Před 4 lety +4

    Like watching a Stooges movie..

  • @paulbeesley6837
    @paulbeesley6837 Před 4 lety +1

    Those were the days. Welding without an air fed welding mask.

  • @russellwright5594
    @russellwright5594 Před 4 lety +5

    Clearly paid by the hour

  • @josephdonahee6741
    @josephdonahee6741 Před 9 měsíci

    Anybody know what size machine and plate packer to use driving in clay?

  • @davesmith2733
    @davesmith2733 Před 4 lety +1

    Only 5miles to go!

  • @sprucesoldier
    @sprucesoldier Před 4 lety

    Definitely paid by the hour here boys...😳

  • @kevinthomas4720
    @kevinthomas4720 Před 4 lety

    when its 20 degrees and your all working for free (except the operator) who cares how fast it s going as long as no gets hurt

  • @michaela.660
    @michaela.660 Před 4 lety

    Man !!!! What a cluster F--- .

  • @DiHandley
    @DiHandley Před 4 lety +1

    Hammering starts at 9:08.

  • @jonathanwratten892
    @jonathanwratten892 Před 5 lety +5

    is that a modified vibro plate for asphalt?

  • @noelanoshea5748
    @noelanoshea5748 Před 4 lety +2

    Never seen anything like it in my life

  • @loganyoung642
    @loganyoung642 Před 4 lety

    OSHA has left the chat.

  • @grahamhale8844
    @grahamhale8844 Před 4 lety +3

    like watching paint dry,

  • @robertgregory2618
    @robertgregory2618 Před 4 lety

    I wonder if their hearing got blown out. Not enough protection, especially the way they wore the ear muffs. Where was OSHA on this job, all kinds of unsafe stuff done here.

  • @davidpiotrowski7906
    @davidpiotrowski7906 Před 4 lety +1

    You know if the personal was trained in safety ,and working smarter NOT harder ,Work would be fun and awarding ??

  • @Eagles0690
    @Eagles0690 Před 4 lety

    What keeps it from rusting out in 3 years

  • @cpcattin
    @cpcattin Před 4 lety

    Cofferdam.

  • @brianmccusker3852
    @brianmccusker3852 Před 4 lety

    area code 416 is in Canada. So now ya know, eh.

  • @davidpiotrowski7906
    @davidpiotrowski7906 Před 4 lety +4

    ladder unsafe

  • @g.nethajibose2214
    @g.nethajibose2214 Před 2 lety

    Wow good

  • @nickbeam5432
    @nickbeam5432 Před 4 lety

    I bet there on there 5th piece right about now.

  • @kcz0888
    @kcz0888 Před 2 lety

    チャッキング 無しかよ 鋼矢板の立ち起しセリの調整無いとは恐れ入る・・ やっぱりその辺の細かさは日本人だけかな?
    でも、せったり 倒れたら 鋼矢板は入らなくなるよね

  • @user-sw7jh4ju2i
    @user-sw7jh4ju2i Před 4 lety

    fighting I love u

  • @bigredc222
    @bigredc222 Před 4 lety

    They couldn't spring for a real ladder?

  • @robertambrose5348
    @robertambrose5348 Před 4 lety

    With a bigger trackhoe you can smash them down

  • @brian.7966
    @brian.7966 Před 4 lety

    outcome the experts.,

  • @jameslindley924
    @jameslindley924 Před 4 lety

    You dont have Mens hands in a Trap Zone EVER !!!!!!!!!!!!!!!!

  • @stephenmead8183
    @stephenmead8183 Před 4 lety

    Ever heard of a hook rather than a shackle !

  • @joebonola7458
    @joebonola7458 Před 4 lety

    Good thing they have that signalman, or the operator MAY not have known what to do.

  • @jcmate1692
    @jcmate1692 Před 4 lety

    Are all these guys new to this type of work i think not they must be contractors getting paid by the hour. Thank our lucky stars they never built the empire state building because king kong would have been dead decades before these blokes built it no wonder the countries in a mess and yep it only took just over 400 days to build the empire state building

  • @darylecollier8574
    @darylecollier8574 Před 8 měsíci

    I don't know why they using a system like that. It's slow , labour intensive and primitive. I work for meso solutions. Have a look on CZcams how we instal sheets.

  • @johnbaudino2535
    @johnbaudino2535 Před 4 lety +1

    And these guys are painful to watch

  • @SH-rm4gw
    @SH-rm4gw Před 5 lety +12

    amateur hour

  • @user-xi9oe5ip4f
    @user-xi9oe5ip4f Před 4 lety

    За это время можно заколотить штук пять.

  • @kennethhuff7158
    @kennethhuff7158 Před 4 lety

    Slow work , job security.

  • @drelliott2833
    @drelliott2833 Před 4 lety +1

    Running a bolt and nut on every lift??? NEWS FLASH>> Leave a chain connected to the lift. Cut a T slot in the top of the towers then simply run the chain in the T slot ! NO bolts washers and "NUTS" I watched it for 5 min. and could recommend all kinds of things that would speed up this construction. Cut at least 75% of the time needed. Unbelievable waste of time doing it like they are. One tower at a time??? How about pre built sections!!!!

  • @bill0118
    @bill0118 Před 4 lety

    What a pity...

  • @pritambaliarsingh6777
    @pritambaliarsingh6777 Před 2 lety

    any one having contact no of this piling group???

  • @dennyhawk9893
    @dennyhawk9893 Před 4 lety +1

    This is a joke right!

  • @lowtech5530
    @lowtech5530 Před 4 lety +1

    Obviously they know nothing about driving sheet piling.

  • @MrBrokefarmer
    @MrBrokefarmer Před 4 lety

    Holy Shit that's old ,slow, and not the right setup. Feel sorry for the guys. If at least they had a better ,easier connection to the modified vibrator plate. Poor buggers. Can't do fast work if you don't have the iron.

  • @kcimages5157
    @kcimages5157 Před 4 lety +1

    worst pile driving crew in history .

  • @zeus240658
    @zeus240658 Před 4 lety

    azz.....manica di imbranati

  • @wood2hoz4
    @wood2hoz4 Před 4 lety

    WTF

  • @brotus11
    @brotus11 Před 4 lety

    5 stooges in action. Chinese boys would have that whole shit done by noon. What is wrong with this country?

    • @brotus11
      @brotus11 Před 4 lety

      also like the ladder, got that from your mom's house?

  • @thankswillie
    @thankswillie Před 3 lety

    painfull,looked like arm in-between sheet and hammer,,.unnecessary

  • @3coolme
    @3coolme Před 4 lety +3

    These guys belong to the Union, Paid too high for the hours they work. Bloody pathetic work process and output. And obviously unskilled labourers.

  • @roblockwood116
    @roblockwood116 Před 4 lety +3

    Looks like amateur hour.

  • @rogerwoodland2587
    @rogerwoodland2587 Před 4 lety

    there doing a good job.