Johan Castberg complete

Sdílet
Vložit
  • čas přidán 4. 09. 2022
  • Last week the world’s largest crane heavy lift vessel, #HMC’s Sleipnir, was quayside at #AkerSolutions Stord, installing the two final modules on the Johan Castberg floating production, storage and offloading ship. With the modules for the turret in place, the FPSO is complete.
    Now all modules will be inter-connected and everything tested, a comprehensive job to be completed in 2024.

Komentáře •