SAWING LINE with scanning, MEBOR, HIGH production, VTZ OF, START-UP

Sdílet
Vložit
  • čas přidán 16. 03. 2018
  • This sawmill line includes double chipper canters, quad & double vertical band saws. Production capacities are up
    to 300-500 m3 of logs/8 h shift. Positioning of blades is carried out through scanning of logs and automatic optimization for
    best recovery. Edging is done with the VRA 40 OF optimised edger for edging of up to 40 boards/min. Cants are
    further re-sawn with a double head RS 1300 resawing line, with a full run around system.
  • Věda a technologie

Komentáře • 55

  • @waynedavenport3919
    @waynedavenport3919 Před 3 lety +1

    Nice setup

  • @wandisukpasi9744
    @wandisukpasi9744 Před 5 lety +1

    Best sawmill machine i ever seen

    • @joelsanchezfl2012
      @joelsanchezfl2012 Před 5 lety

      Yes right on.
      I worked in an big company in Rockledge FL
      Now I'm here in my beautiful country

    • @fortuneshongwe1454
      @fortuneshongwe1454 Před 2 lety

      @@joelsanchezfl2012 where is your country Sir??

    • @joelsanchezfl2012
      @joelsanchezfl2012 Před 2 lety +1

      @@fortuneshongwe1454 i I'm from Veracruz Mexico sir...now I came back to usa... greetings sir.

    • @fortuneshongwe1454
      @fortuneshongwe1454 Před 2 lety

      Am from South Africa 🇿🇦 I want job there, do you have the email

  • @asdfg123229
    @asdfg123229 Před 4 lety +1

    Прокладки вручную укладывают в прокладораздатчик, обалдеть сколько ручного труда.

  • @kasob100
    @kasob100 Před 4 lety +1

    Impressive

  • @user-gt5rk8gu1x
    @user-gt5rk8gu1x Před 5 lety +5

    Линия, конечно, фантастическая))) Но и такой же переизбыток, как не крути много холостого. А если случится 2 дня простоя или неделька.... Но, в целом, это высочайший уровень.

    • @VaderMi
      @VaderMi Před 4 lety +2

      работал на таком, на х.х.затраты конечно есть, но они перекрываются обьёмами распиленной продукции. А про простои , это правильно заметили, стоит сломаться одному вспомогательному конвееру, и останавливается весь завод. А если пилит без остановок, то склад с кругляком не успевает разгружать лес, либо не успевают перерабатывать отходы: опилку-обзол, и опять остановка всего завода. Да и с малыми обьёмами кругляка на нём не выгодно пилить, и людей отправляют нахер.

    • @krewleonardo7116
      @krewleonardo7116 Před 2 lety

      Instablaster.

  • @chetanJadhav-rl8ss
    @chetanJadhav-rl8ss Před 5 lety +1

    Nice

  • @Altis_play
    @Altis_play Před 2 lety +1

    the summary of the video is at 7:10

  • @MultiBruho
    @MultiBruho Před 5 lety +4

    Хороший заводик, но с такими заводиками ни какого леса не хватит.

    • @enovitskiy
      @enovitskiy Před 5 lety +1

      без этого заводика ты бы сидел жопой на полу

  • @JemiReinkarnasi
    @JemiReinkarnasi Před 5 lety +1

    Wow

  • @clementeespinoza4236
    @clementeespinoza4236 Před 5 lety +1

    donde lo encuentro

  • @uabukmega680
    @uabukmega680 Před 3 lety

    👍

  • @OSCAR201246
    @OSCAR201246 Před 6 lety +5

    ESTE ASERRADERO LO DEBE HABER IDEADO EL DUEÑO DEL MISMO PODRIDO DE LOS PAROS...!!!

  • @tango5341
    @tango5341 Před 3 lety

    how much completed sawing line with scanning ?

  • @DINESHKUMAR-cq6bs
    @DINESHKUMAR-cq6bs Před 5 lety +2

    kahai PR ye company

  • @RockAristote
    @RockAristote Před 3 lety

    How much PMP by hour?

  • @trader2473
    @trader2473 Před 2 lety

    How much cost this complete line?
    And can you make completly automated line for about 50m3/8h?
    Regards from Montenegro!

    • @BillyReed68
      @BillyReed68 Před 5 měsíci

      Hmmm, each one of those saw heads is at least $250k. There were 3 gangs of four? Plus the edgers? The building is probably cool million with the pad that is required. I bet you could set that entire operation up for under $10 million, US. And that includes the heavy haulers to feed it.

  • @tune7333
    @tune7333 Před 5 lety +1

    can the forests keep up?...wow

    • @conexn
      @conexn Před 5 lety

      For every tree they cut down, they have to plant 5 more. Some of the material/tree's they get are also cut down from fire breaks in forest, that way if there is a fire, it can only burn so much and not an entire forest.
      The days of coming in a cutting down an entire forest like they did back in the 1800 and 1900's is over.

    • @oloansitanggang410
      @oloansitanggang410 Před 3 lety

      Developing countries forest were.cleaned toward.deserts...n yet they all do not realised

  • @BillyReed68
    @BillyReed68 Před 5 měsíci

    One thing breaks and the entire process breaks down. I bet they built it like a Swiss watch. 150k bd ft in an 8 hour shift? # 20 double bunk trailers per day? Where do they put the mountain of saw dust and chipping?

  • @fencer39
    @fencer39 Před 3 lety +1

    400+ dislikes.....obviously they bought a woodmizer !

  • @luluhka8
    @luluhka8 Před 5 lety +4

    небось сами китайцы лес выращивают у себя)))

  • @emmanuelcunha6188
    @emmanuelcunha6188 Před 2 lety

    Quantos metros cubicos essa serraria produz por hora ?

    • @coiwe
      @coiwe Před rokem

      o 300-500 m3 of logs/8 h shift

  • @istina1003
    @istina1003 Před 5 lety +3

    Where is this company? Which country?

  • @kelz3486
    @kelz3486 Před 3 lety

    Why does it run so slow?? I worked in a sawmill which did a log every 10sec

    • @coiwe
      @coiwe Před rokem

      A sawmill is always dedsigned according to the logs availability. Surely it respond to the log supply they have

  • @fortuneshongwe1454
    @fortuneshongwe1454 Před 2 lety

    It's good sawmill machines, location please, in which country??

  • @adrianoaparecido6702
    @adrianoaparecido6702 Před 5 lety +1

    Dp

  • @user-io9en3ui5i
    @user-io9en3ui5i Před rokem

    라인 얼마인가요

  • @SuneelKumar-fv5tk
    @SuneelKumar-fv5tk Před 9 měsíci

    I want cost

  • @derekbueckert7428
    @derekbueckert7428 Před 2 lety

    looks very nice but I can do math and what I see is a operation that requires to much man power and a lot of capital to set up. this set up would have to run smoothly for a really long time before its put the original investment back into your pocket

  • @richardmanning8912
    @richardmanning8912 Před 2 měsíci

    No debarker

  • @matzbjureen5149
    @matzbjureen5149 Před 5 lety

    N

  • @user-zb1tt4vh4x
    @user-zb1tt4vh4x Před 5 lety +1

    Хватит Россию грабить.

  • @michaelwillcutt2619
    @michaelwillcutt2619 Před rokem

    Trees that size is a waste of time cut bigger allowing smaller trees to have a heart of grain .

  • @user-vx2qy3lg5f
    @user-vx2qy3lg5f Před 5 lety +3

    Херня какая-то ... Доски пол часа по цеху катаются и все...

    • @user-qh1lj3gg8g
      @user-qh1lj3gg8g Před 4 lety +1

      Новый ещё не чего был а сейчас фуфел

  • @CC-jj7ne
    @CC-jj7ne Před 6 měsíci

    High speed is greater than 60,000 board feet an hour. And that was over 20 years ago. Looks like you doing about 15. Sorry to say it but you ain’t even slow.